PRELIMINARY INVESTIGATIONS AND TECHNICAL REPORTS Sample Clauses

PRELIMINARY INVESTIGATIONS AND TECHNICAL REPORTS. Site Investigations and As-Built Research 2 16 80 $14,490 Supplemental Field Surveying 2 4 12 24 $10,568 Base Map Preparation Base Map Preparation 16 80 40 $18,400 Conceptual Alternatives Analysis Drainage and Water Quality 1 2 12 48 20 $11,725 Roundabouts 1 16 72 32 $16,645 Utilities 1 6 24 12 $5,975 Conceptual Plans 2 20 80 60 $21,790 TASK 1 TOTAL: 7 4 0 0 86 384 164 4 12 24 $99,593 II. 60% PS&E Plans Title Sheet 1 4 2 $955 Sheet Index Sheet 1 4 2 $955 Key Map Sheet 1 4 4 $1,175 Typical Cross Section Sheets 1 10 40 20 $9,795 Demolition Sheets 1 20 80 60 $21,545 Improvement Plan Sheets 1 30 120 60 $28,895 Profile Sheets 1 20 80 40 $19,345 Roundabout Detail Sheets 1 16 60 40 $15,845 Curb Ramp Location Sheet 2 8 8 $2,350 Curb Ramp/ADA Detail Sheets (8 Ramps) 1 16 64 32 $15,525 Driveway Detail Sheets (14 Driveways) 1 14 56 28 $13,615 Signing and Striping Plans 2 12 64 $11,490 Traffic Control Plans (54th and Streamview) 2 4 12 $2,810 Green Infrastructure Key Map 2 8 4 $1,910 Green Infrastructure Plans 1 1 22 90 45 $21,875 Storm Drain Plans 1 1 16 72 36 $17,315 Monument Sheet 1 4 4 8 $2,385 Retaining Wall Plan and Profile 1 3 26 6 $5,070 Staging Plans 1 16 60 30 $14,745 Specifications (List of Special Provisions) 1 8 $1,645 Opinion of Probable Construction Cost 1 1 8 40 $7,475 Drainage and Water Quality Reports Draft Drainage Study 8 48 148 $30,960 TASK 2 TOTAL: 14 11 4 0 274 1044 425 0 0 0 $247,680
AutoNDA by SimpleDocs
PRELIMINARY INVESTIGATIONS AND TECHNICAL REPORTS. Conceptual Design Analysis (MUTA Precast vs. Cast-in-Place Analysis) 32 $5,600 Meetings 12 $2,100 TASK 1 TOTAL: V. CONSTRUCTABILITY REVIEW $7,000 100% Submittal Constructability Review 40 $7,000 TASK 5 TOTAL: $300 DIRECT CHARGES Reimbursable Expenses - Mileage (Site Visits/Meetings) $300 DIRECT CHARGES TOTAL: PROJECT TOTAL: $15,000 CITYWORKS COMPENSATION AND FEE SCHEDULE EXHIBIT B (CITYWORKS) TASK: PARTNER SENIOR GRAPHIC DESIGNER PROJECT MANAGER ASSISTANT ASSOCIATE REVISED PROPOSED COST($): Task Total($): Hourly Rate $220.00 $115.00 $140.00 $70.00 $80.00
PRELIMINARY INVESTIGATIONS AND TECHNICAL REPORTS. Conceptual Alternatives Analysis Pre-cast versus Cast-in-Place MUTA Structural Analysis 8 32 0 $6,320 Pre-cast versus Cast-in-Place MUTA Cost Analysis $2,000 $2,000 Meeting (1) 4 4 0 $1,360 TASK 1 TOTAL:
PRELIMINARY INVESTIGATIONS AND TECHNICAL REPORTS. Conceptual Alternatives Analysis Roundabout Technical Studies Review intersection constraints - Z, Vert, Util, Dwy. Access 4 4 8 $2,060 Explore Horz layouts 8 24 40 $8,744 Develop Roundabout Feasibility Memorandum and Exhibit for 2 locations 12 20 32 $8,052 TASK 1 TOTAL: II. 60% PS&E $12,926 Plans Peer Review 60% Design 10 40 $6,670 Develop Typical Roundabout Construction Details 2 12 25 $4,580 First Iteration Review Roundabout Components 4 8 $1,676 TASK 3 TOTAL: III. 100% PS&E $4,993 Plans Peer Review 100% Design 5 10 $2,095 Revise Typical Roundabout Construction Details 2 4 8 $1,718 Second Iteration Review Roundabout Components 4 4 $1,180 TASK 4 TOTAL: DIRECT CHARGES $1,600 Reimbursable Expenses (Site Visit for Roundabout Feasibility Study) 1600 $1,600 DIRECT CHARGES TOTAL: PROJECT TOTAL: $38,375 Xxxxxxxx Biology COMPENSATION AND FEE SCHEDULE EXHIBIT B (Xxxxxxxx Biology) TASK: PRINCIPAL BIOLOGIST ASSOCIATE BIOLOGIST ASSOCIATE GIS SUBCONS- ULTANT TOTAL REVISED PROPOSED COST($): Task Total($): Hourly Rate $160.00 $85.00 $100.00 - $10,020 IX. ADDITIONAL SERVICES NEPA NESMI 42 20 16 $10,020 TASK 9 TOTAL ADDITIONAL SERVICES: TOTAL ADDITIONAL SERVICES: $10,020 Southwest Geophysics COMPENSATION AND FEE SCHEDULE EXHIBIT B (Southwest Geophysics) TASK: TECHNICIAN (2-PERSON CREW) SUBCONS- ULTANT TOTAL REVISED PROPOSED COST($): Task Total($): Hourly Rate $240.00 - $3,840
PRELIMINARY INVESTIGATIONS AND TECHNICAL REPORTS. Utility Investigations Geophysical Utility Locating (Southwest Geophysics) 16 $3,840 TASK 1 TOTAL: PROJECT TOTAL: $3,840 TTG Environmental COMPENSATION AND FEE SCHEDULE EXHIBIT B (TTG Environmental) TASK: PRINCIPAL ASSOCIATE CAD TECH- NICIAN SUBCONS- ULTANT TOTAL REVISED PROPOSED COST($): Task Total($): Hourly Rate $160.00 $150.00 $110.00 - $10,240 IX. ADDITIONAL SERVICES NEPA PES Preparation (TTG) 32 $5,120 Community Impact Assessment (TTG) 32 $5,120 Environmental Support Environmental Support (TTG) 20 $3,200 $3,200 TASK 9 TOTAL ADDITIONAL SERVICES: $13,440 DIRECT CHARGES $400 Reimbursable Expenses $400 DIRECT CHARGES TOTAL: TOTAL ADDITIONAL SERVICES: $13,840
PRELIMINARY INVESTIGATIONS AND TECHNICAL REPORTS. Site Investigations and As-Built Research 4 8 24 $5,180 Base Map Preparation Utility Base Map (West Coast Civil) 2 2 24 32 $7,580 Conceptual Alternatives Analysis Conceptual Alternatives Analysis (West Coast Civil) 2 8 16 40 32 $13,350 TASK 1 TOTAL: II. 60% PS&E $65,765 Plans Water and Sewer Plans (West Coast Civil) 4 24 80 180 180 $62,380 Specifications (List of Special Provisions) 1 4 4 $1,335 TASK 2 TOTAL: III. 100% PS&E $32,680 Plans Water and Sewer Plans (West Coast Civil) 4 16 40 80 80 $29,780 Specifications 1 2 4 $1,025 Opinion of Probable Construction Cost 1 4 8 $1,875 TASK 3 TOTAL: IV. FINAL PS&E $7,850 Plans Water and Sewer Plans (West Coast Civil) 4 4 8 16 8 $5,800 Specifications 1 2 4 $1,025 Opinion of Probable Construction Cost 1 2 4 $1,025 TASK 4 TOTAL: VI. PROJECT MANAGEMENT/COORDINATION $8,730 Meetings 18 36 $8,730 TASK 6 TOTAL: VII. BID SUPPORT $1,335 Bid Support 1 4 4 $1,335 TASK 7 TOTAL: VIII. CONSTRUCTION SUPPORT $10,665 Construction Support 1 18 20 $5,665 As-Builts 1 1 3 7 28 $5,000 TASK 8 TOTAL: DIRECT CHARGES $500 Reimbursable Expenses $500 DIRECT CHARGES TOTAL: PROJECT TOTAL: $153,635 EXHIBIT C TIME SCHEDULE EXHIBIT C TIME SCHEDULE Tasks Task Duration Task Duration Timeline (from Contract NTP)

Related to PRELIMINARY INVESTIGATIONS AND TECHNICAL REPORTS

  • Search, Enquiry, Investigation, Examination And Verification a. The Property is sold on an “as is where is basis” subject to all the necessary inspection, search (including but not limited to the status of title), enquiry (including but not limited to the terms of consent to transfer and/or assignment and outstanding charges), investigation, examination and verification of which the Purchaser is already advised to conduct prior to the auction and which the Purchaser warrants to the Assignee has been conducted by the Purchaser’s independent legal advisors at the time of execution of the Memorandum.

  • Technical Reports deliver to the Agent, and shall procure that the Manager shall deliver to the Agent, on request copies of the latest complete technical reports in respect of the Vessels.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Updated Information Submission by Developer The updated information submission by the Developer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Developer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the Large Facility Interconnection Procedures. It shall also include any additional information provided to Connecting Transmission Owner for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, the Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Developer’s data is different from what was originally provided to Connecting Transmission Owner and NYISO pursuant to an Interconnection Study Agreement among Connecting Transmission Owner, NYISO and Developer and this difference may be reasonably expected to affect the other Parties’ facilities or the New York State Transmission System, but does not require the submission of a new Interconnection Request, then NYISO will conduct appropriate studies to determine the impact on the New York State Transmission System based on the actual data submitted pursuant to this Article 24.3. Such studies will provide an estimate of any additional modifications to the New York State Transmission System, Connecting Transmission Owner’s Attachment Facilities, or System Upgrade Facilities or System Deliverability Upgrades based on the actual data and a good faith estimate of the costs thereof. The Developer shall not begin Trial Operation until such studies are completed. The Developer shall be responsible for the cost of any modifications required by the actual data, including the cost of any required studies.

  • Background Investigations OSC policy requires that background investigations be conducted on Contractor Staff who will have access to OSC’s IT systems, access to OSC confidential information/data, or routine access to any OSC facility. For purposes of this policy, “routine access” is defined as access to an OSC facility for five consecutive business days or 10 business days over the annual term of the engagement. Accordingly, with the signing of this Agreement, the Contractor certifies that it has or will conduct a background investigation on Staff to whom the policy applies within the 12 months prior to the Staff commencing Services under this Agreement. The Contractor agrees to undertake a background investigation of any new/replacement Staff during the term of the Agreement. At a minimum, background investigations shall include a review/evaluation of the following: • identity verification, including Social Security Number search; • employment eligibility, including verification of U.S. citizenship or legal immigration status where appropriate; • criminal history/court records (Federal, State and local for the past five years); • work experience/history for the past five years; • pertinent skills, qualifications, and education/professional credentials; and • references. The Contractor must obtain the consent of its Staff to allow OSC, upon request: (i) to review the background investigation records, including all supporting documentation, and (ii) to conduct its own background investigation. Only Staff who have passed the background investigation, and provided such consent shall be assigned to provide Services to OSC under this Agreement. During the term of the Agreement, and in accordance with Appendix A (Section 10, Records), the Contractor must maintain records related to the background investigations performed.

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to the Participating TO and the CAISO for the Interconnection Studies, then the Participating TO and the CAISO will conduct appropriate studies pursuant to the LGIP to determine the impact on the Participating TO’s Transmission System and affected portions of the CAISO Controlled Grid based on the actual data submitted pursuant to this Article 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed and all other requirements of this LGIA are satisfied.

  • BACKGROUND INVESTIGATION The BOARD is prohibited from knowingly employing a person who has been convicted of committing or attempting to commit certain criminal offenses. If the required criminal background investigation is not completed at the time this Contract is signed, and the subsequent investigation report reveals that there has been a prohibited conviction, this Contract shall immediately become null and void.

  • Technical Feasibility of String While ICANN has encouraged and will continue to encourage universal acceptance of all top-­‐level domain strings across the Internet, certain top-­‐level domain strings may encounter difficulty in acceptance by ISPs and webhosters and/or validation by web applications. Registry Operator shall be responsible for ensuring to its satisfaction the technical feasibility of the TLD string prior to entering into this Agreement.

  • Information and Technical Advice At the request of a Party, or upon its own initiative, the arbitration panel may obtain information from any source, including the Parties involved in the dispute, which it deems appropriate for the arbitration procedure. The arbitration panel also has the right to seek the opinion of experts as it deems appropriate. Any information obtained in this manner must be disclosed to each of the Parties and submitted for their comments. Interested parties are authorised to submit amicus curiae briefs to the arbitration panel in accordance with the rules of procedure.

  • Office of Inspector General Investigative Findings Expert Review In accordance with Senate Bill 799, Acts 2021, 87th Leg., R.S., if Texas Government Code, Section 531.102(m-1)(2) is applicable to this Contract, Contractor affirms that it possesses the necessary occupational licenses and experience.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!