PHASE 2 - FACILITIES CONSTRUCTION AND INSTALLATION PHASE Sample Clauses

PHASE 2 - FACILITIES CONSTRUCTION AND INSTALLATION PHASE. If the MEP Participants determine in their sole discretion that the construction and installation of the Facilities is viable within any previously designated Specified Corridor, the MEP Participants will have the right to so notify the State Authorities and such Specified Corridor shall thereafter be designated the Construction Corridor. At the earliest practicable date after such designation, the State Authorities will obtain, secure and grant to the MEP Participants the following Rights to Land: 3.1 Right to transport all construction material, plant and equipment within the Territory and cross border by land or air without hindrance, including the right to construct and maintain temporary and permanent roads and to use such airfields as are designated, from time to time, by the MEP Participants. 3.2 Right to designate and use other areas of land, both in the vicinity of the proposed Facilities and remote from the Facilities, for the conduct of all Project Activities, including for pipe storage dumps, site compounds, construction camps, fuel storage dumps, parking areas, roads and other activity sites. 3.3 Right to install generation and transmission equipment and to connect to any existing electricity supply and, where necessary, the right to lay cables from such supply to the Construction Corridor. 3.4 Right of entry onto such land and offshore areas with all necessary materials and equipment to lay and construct and thereafter use, maintain, protect, repair, alter, renew, augment, expand, inspect, remove, replace or render unusable the Facilities as is required for construction and installation of the Facilities and right to commence and undertake construction and installation. 3.5 Right to receive confirmation that each affected landowner and/or occupier has been made aware of and has consented to and/or has been compensated under Azerbaijan Law for the rights acquired by the MEP Participants through the State Authorities. 3.6 Right to receive from the State Authorities details of land ownership and use, including names and addresses of landowners and occupiers and details of land holding defined on plans showing all such details for all property falling within two hundred fifty (250) metres either side of the Construction Corridor. 3.7 All rights of access over any land as required by the MEP Participants and their Contractors for the purposes of conducting Project Activities, including rights of access (including the right to construct and use tem...
PHASE 2 - FACILITIES CONSTRUCTION AND INSTALLATION PHASE. If the TANAP Project Entity determines in its sole discretion that the construction and installation of the Facilities is viable within any previously designated Specified Corridor, the TANAP Project Entity will have the right to so notify the Land Rights Entity and such Specified Corridor will thereafter be designated the Construction Corridor. At the earliest practicable date after such designation, the Land Rights Entity will cause all the unregistered lands within the Construction Corridor to be registered with relevant land registries and cause the acquisition of all the lands owned by Persons within the Construction Corridor in the name of the Land Rights Entity. The Land Rights Entity will use Best Endeavours to complete the acquisitions of land owned by Persons as promptly as possible within the framework of principles set forth under Article 16 of this Agreement.

Related to PHASE 2 - FACILITIES CONSTRUCTION AND INSTALLATION PHASE

  • Construction Phase Part 1 –

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure: 1. Coordination and providing supervision to all Subcontractor and workers; 2. Posting of the prevailing wage scale; 3. Maintaining a copy of the Contractors safety program manual made available to all construction personnel; 4. Conducting weekly on-site safety meetings; 5. Completing the daily labor and construction progress log on a daily basis and submit copies to the County on a daily basis. Copies of the previous day’s reports must be submitted by 9:00AM of the following day. a. Daily labor log is to include a listing of Subcontractor(s) and a count of workers by trade providing services for the day. b. Construction progress log is to include a narrative of the Work provided by trade(s). Narrative agrees to include the various areas of the jobsite where Work was performed and any problems or conditions that were encountered. c. In the event the Contractor fails to provide a daily log and/or construction progress log, the County may impose damages against the Contractor in the amount of fifty dollars ($50.00) for each log and deduct from the Contractor’s payment request, for each day the Contractor does not provide the documentation. 6. County may suspend Contractor operations if no Contractor Superintendent is observed. All delays caused by the suspension will be the responsibility of the Contractor. No time extension or claims for cost(s) associated with the suspension will be granted by the County.

  • PRE-CONSTRUCTION PHASE FEE The Pre-Construction Phase Fee is the total compensation payable to Contractor for the performance of Pre-Construction Phase Services, except for Additional Pre-Construction Phase Services approved in advance and in writing by Owner. The Pre-Construction Phase Fee shall be a lump sum amount based on the AACC established in this Agreement. 6.1 Except as specifically allowed by Owner, Contractor shall not be entitled to any increase in the Pre-Construction Phase Fee for any costs, expenses, liabilities or other obligations arising from the performance of Pre-Construction Phase Services. 6.2 Costs associated with the following items are specifically, but not exclusively, included in the establishment of the Pre-Construction Phase Fee: profit and profit sharing; general overhead; salaries and labor; housing and relocation; estimating, scheduling and information management systems and software; contract administration; office expenses; printing and copying; consulting fees; legal or accounting fees; cost of money; taxes; insurance premiums and deductibles; bond costs; purchase or rental of equipment; utilities; travel; per diem; fines or penalties; and damage awards. 6.3 If the scope of the Pre-Construction Phase Services is changed materially, the Pre- Construction Phase Fee shall be equitably adjusted. If the AACC is changed materially before acceptance of the GMP Proposal, the Pre-Construction Phase Fee shall be adjusted in writing in proportion to the change in the AACC. There shall be no adjustments in the Pre-Construction Phase Fee following acceptance of the GMP Proposal. 6.4 For Additional Pre-Construction Phase Services that are approved in advance and in writing by Owner, Contractor shall be entitled to additional compensation computed as follows: 6.4.1 A pre-established lump sum amount; or 6.4.2 The hourly cost of Contractor’s employees or consultants who actually perform the Additional Services based on the employee’s Worker Wage Rate or prorated Monthly Rate plus the actual cost of allowable expenses incurred in the performance of the Additional Pre-Construction Phase Services, plus an overhead and profit markup of ten percent (10%) of the total cost; or 6.4.3 As otherwise agreed in advance and in writing.

  • LESSOR'S ACCESS; SHOWING PREMISES; REPAIRS Lessor and Lessor's agents shall have the right to enter the Premises at any time, in the case of an emergency, and otherwise at reasonable times for the purpose of showing the same to prospective purchasers, lenders, or lessees, and making such alterations, repairs, improvements or additions to the Premises or to the Building, as Lessor may reasonably deem necessary. Lessor may at any time place on or about the Premises or Building any ordinary "For Sale" signs and Lessor may at any time during the last one hundred eighty (180) days of the term hereof place on or about the Premises any ordinary "For Lease" signs. All such activities of Lessor shall be without abatement of rent or liability to Lessee.

  • Pre-Construction Phase Provide Workers’ Compensation, Comprehensive General Liability and Comprehensive Automobile Liability in the amounts as set forth in the Uniform General Conditions for University of Texas System Building Construction Contracts.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items: 9.1 All profit, profit expectations and costs associated with profit sharing plans such as personnel bonuses, incentives, and rewards; company stock options; or any other like expenses of Contractor.

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services: