PREDESIGN Sample Clauses

PREDESIGN. 1 Estimating: (1) Confirm or prepare a Class D Construction Cost Estimate. (2) Advise the Owner if it appears that the Construction Cost Estimate may exceed the Project budget, and make recommendation for corrective action. .2 Scheduling: Prepare a preliminary overall Project schedule. F3 F3 Reset
AutoNDA by SimpleDocs
PREDESIGN. 1.1 CONSULTANT shall review the CITY obtained topographic survey of the site; and shall identify and inform the CITY of any site-related discrepancies between the survey report and any other site reports provided by the CITY that might affect the PROJECT. The topographic survey provided by the CITY must be verified as to it accuracy prior to using it for design.
PREDESIGN. 2 Scheduling: Add the following as paragraph 1.2.2 (1) (1) Co-ordinate with the Owner, and the Consultant to develop a detailed Project schedule within two (2) weeks of commencement of the Services. The Project schedule must be updated and monitored on a monthly basis, or more as required. Provide progress updates and confirm compliance with Project schedule to maintain all critical delivery dates throughout the phases of the Project.
PREDESIGN. Basic Services during this phase include:

Related to PREDESIGN

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • Performance Indicators The HSP’s delivery of the Services will be measured by the following Indicators, Targets and where applicable Performance Standards. In the following table: n/a means ‘not-applicable’, that there is no defined Performance Standard for the indicator for the applicable year. tbd means a Target, and a Performance Standard, if applicable, will be determined during the applicable year. INDICATOR CATEGORY INDICATOR P=Performance Indicator E=Explanatory Indicator M=Monitoring Indicator 2022/23 Performance Target Standard Organizational Health and Financial Indicators Debt Service Coverage Ratio (P) 1 ≥1 Total Margin (P) 0 ≥0 Coordination and Access Indicators Percent Resident Days – Long Stay (E) n/a n/a Wait Time from Home and Community Care Support Services (HCCSS) Determination of Eligibility to LTC Home Response (M) n/a n/a Long-Term Care Home Refusal Rate (E) n/a n/a Quality and Resident Safety Indicators Percentage of Residents Who Fell in the Last 30 days (M) n/a n/a Percentage of Residents Whose Pressure Ulcer Worsened (M) n/a n/a Percentage of Residents on Antipsychotics Without a Diagnosis of Psychosis (M) n/a n/a Percentage of Residents in Daily Physical Restraints (M) n/a n/a

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Hybrid Loops Sprint will provide CLEC access to Hybrid Loops for the provision of narrowband services as provided below. Sprint is not required to provide unbundled access to the packet switched features, functions, and capabilities of its Hybrid Loops.

  • Benchmarks 2.1 Benchmarks set forth the overall scope and level of responsibility and the typical duties by which jobs or positions are distinguished and classified under the Classification System.

  • Target Population The Grantee shall ensure that diversion programs and services provided under this grant are designed to serve juvenile offenders who are at risk of commitment to Department.

  • Maintenance Programme 17.4.1 On or before COD and no later than 45 (forty five) days prior to the beginning of each Accounting Year during the Operation Period, as the case may be, the Concessionaire shall provide to the Authority and the Independent Engineer, its proposed annual programme of preventive, urgent and other scheduled maintenance (the “Maintenance Programme”) to comply with the Maintenance Requirements, Maintenance Manual and Safety Requirements. Such Maintenance Programme shall include:

Time is Money Join Law Insider Premium to draft better contracts faster.