Production Meter Sample Clauses

Production Meter. Upon the initial satisfaction of all of the conditions set forth in Sections 3.3 and 3.4 above, Black Hills Energy shall install, and thereafter own, operate, maintain and read the Production Meter, which shall be sufficiently sized to measure all Photovoltaic Energy generated by the CSG PV System, and CSG SO shall reimburse Black Hills Energy for the cost of installing the Production Meter. In addition, CSG SO will reimburse Black Hills Energy for the cost of the Production Meter and any remote communications equipment. Such reimbursement shall be due within thirty (30) days from the date a xxxx is presented to CSG SO by Black Hills Energy after the Production Meter is installed. If CSG SO does not make payment in full within that time, the unpaid balance shall bear interest at the rate of one and one half percent (1.5%) per month. Black Hills Energy reserves the right to replace the Production Meter, at its sole cost, at any time and for any reason.
AutoNDA by SimpleDocs
Production Meter. Upon the initial satisfaction of all of the conditions set forth in Sections 3.3 and 3.4 above, Public Service shall install, and thereafter own, operate, maintain and read the Production Meter, which shall be sufficiently sized to measure all Photovoltaic Energy generated by the PV System, and SRC Producer shall reimburse Public Service for the cost of installing the Production Meter. Such reimbursement shall be due within thirty (30) days from the date a xxxx is presented to SRC Producer by Public Service after the Production Meter is installed. If SRC Producer does not make payment in full within that time, the unpaid balance shall bear interest at the rate of one and one half percent (1.5%) per month. Public Service reserves the right to replace the Production Meter, at its sole cost, at any time and for any reason.
Production Meter. Upon the initial satisfaction of all of the conditions set forth in Sections 3.3 and 3.4 above, and any applicable requirements of the Distribution Interconnection Standards, ENO shall install, and thereafter own, operate, maintain and read the Production Meter, which shall be sufficiently sized to measure all Output generated by the CSG Facility, and Subscriber Organization shall reimburse ENO for the cost of installing the Production Meter. Such reimbursement shall be due within thirty (30) days from the date a bill is presented to Subscriber Organization by XXX after the Production Meter is installed. If Subscriber Organization does not make payment in full within that time, the unpaid balance shall bear interest at the rate of one and one half percent (1.5%) per month. ENO reserves the right to replace the Production Meter, at its sole cost, at any time and for any reason.
Production Meter. An APS-owned electric meter installed at a Generating Facility and configured so as to record or allow calculated energy output of the GF. The Production Meter will be an AMI type, unless otherwise specified by APS. Point of Interconnection (POI): The physical location where APS’ service conductors are connected to a Customer’s conductors, bus, and/or service equipment to allow parallel operation of Customer’s GF with the APS System. Also referred to as the Point of Common Coupling (POCC). POI: See “Point of Interconnection”. QF: See “Qualifying Facility”. Qualifying Facility (QF): Any Cogeneration or Small Power Production Facility that meets the criteria for size, fuel use, efficiency, and ownership as promulgated in 18 CFR, Chapter I, Part 292, and Subpart B of the Federal Energy Regulatory Commission’s Regulations. Radial Line: A distribution line that originates from a substation and is normally not connected to another substation or another circuit sharing the common supply of electric power. Readily Accessible: Capable of being reached quickly and conveniently on a 24 hour basis without requiring climbing over or removing obstacles, obtaining special permission, keys or security clearances.
Production Meter. Customer shall label the Production Meter enclosure and/or socket as “Production Meter”. In the event APS grants approval to install the Production Meter at a location other than the SES: (1) Customer shall install a placard at the SES giving concise directions to, and the location of, the Production Meter, and (2) Customer shall install a placard at the Production Meter(s) giving concise directions to, and the location of, the SES. When more than one SES exists at a Customer’s facility, the meters shall be labeled to reference the appropriate SES. In the event that more than one Production Meter is installed at a Customer’s facility, the meters shall be labeled 1/x, 2/x, etc. where x is the total number of Production Meters. Additionally, for metering maintenance, if load-side terminals may be energized by a DG source, a label shall be placed adjacent to or affixed to the Production Meter enclosure stating: “Warning: Load side terminals may be energized by backfeed”.
Production Meter. Upon Xxxxx’s request, Seller shall make available to Buyer, at no cost to Buyer, any and all data in Seller’s possession concerning the production, measurement, and transfer of Delivered Energy, as well as all other information concerning the performance of the System. Seller shall provide Buyer with prompt notice of any malfunction or other failure of the Production Meter or other telemetry equipment necessary to accurately report the quantity of Delivered Energy
Production Meter. A meter that measures total kWh produced by the Customer Generating Facility.
AutoNDA by SimpleDocs

Related to Production Meter

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • FABRICATION Making up data or results and recording or reporting them.

  • Outputs 11. The objectives and outcomes of this Agreement will be achieved by:

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Inputs 921 The following resources constitute a suitable, but neither exhaustive nor normative suite of the process inputs:

  • Purchase Order Flip via Ariba Network (AN) The online process allows suppliers to submit invoices via the AN for catalog and non- catalog goods and services. Contractors have the ability to create an invoice directly from their Inbox in their AN account by simply “flipping” the purchase order into an invoice. This option does not require any special software or technical capabilities. For the purposes of this section, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider of MFMP the right and license to use, reproduce, transmit, distribute, and publicly display within the system the information outlined above. In addition, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider the right and license to reproduce and display within the system the Contractor’s trademarks, system marks, logos, trade dress, or other branding designation that identifies the products made available by the Contractor under the Contract.

  • Production Lessee shall, subject to applicable laws, regulations and orders, operate and produce all xxxxx upon the leased land so long as the same are capable of producing in paying quantities, and shall operate the same so as to produce at a rate commensurate with the rate of production of xxxxx on adjoining lands within the same field and within the limits of good engineering practice, except for such times as there exist neither market nor storage therefore, and except for such limitations on, or suspensions of, production as may be approved in writing by Lessor. Lessee shall be responsible for adequate site security on all producing properties.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!