Proposal for Extra Design Build Work Sample Clauses

Proposal for Extra Design Build Work. The DBE shall submit a written quotation on a lump-sum basis for Extra Design Build Work covered by any proposed Change Order. Any such quotation shall be deemed the DBE’s offer to WRD, binding for 60 days to perform the Extra Design Build Work at the price quoted. In addition, each quotation shall include the effect, if any, of the Extra Design Build Work on the critical path method schedule, the Scheduled Acceptance Date, the Fixed Design Build Price, the Performance Guarantees, the Service Fee and any of the other obligations of the DBE under this Contract.
AutoNDA by SimpleDocs
Proposal for Extra Design Build Work. The Design-Build Contractor shall submit a written quotation on a lump-sum basis for Extra Design-Build Work covered by any Change Order. The Design-Build Contractor shall include with each quotation Cost Substantiation therefore. Any such quotation shall be deemed the Design-Build Contractor’s offer to the Sewer District, binding for ninety (90) days to perform the Extra Design-Build Work at the price quoted. In addition, each quotation shall include the effect, if any, of the Extra Design-Build Work on the progress schedule, the Scheduled Final Acceptance Date, the Fixed Design-Build Price and any of the other obligations of the Design-Build Contractor under this Design-Build Agreement. Upon such lump-sum price being agreed to by the Parties, such price shall not be further subject to Cost Substantiation.

Related to Proposal for Extra Design Build Work

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Technical Proposal The technical proposal may be presented in free format. It shall not exceed ten pages, not counting the CVs. It shall respect the following page limit and structure: • Technical methodology (max. 7 pages) • Quality management (max. 1 page) • Project management (max. 1 page) • Resource management (proposal (max. 1 page) + CVs of experts)

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Annual Work Plans (a) The Recipient shall prepare in accordance with guidelines acceptable to the Association and furnish to the Association not later than March 31 in each calendar year, a proposed annual work plan and budget for the Project for the following fiscal year of the Recipient, of such scope and in such detail as the Association shall reasonably request.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Technical Proposals Technical proposal information will be streamlined, e.g., the Government anticipates written proposals consisting of thirty (30) pages or less stating compliance or exception to requirements, risks, assumptions and conflict of interest issues. Proposals shall not merely restate PWS/SOO requirements. Written technical proposals shall normally address: * Technical Approach and descriptive narrative of the contractor's understanding of the requested effort * PWS in response to a SOO * Integrated Master Plan (if applicable) * Integrated Master Schedule (if applicable) * Key Personnel Assigned * Quantities/Hours of Personnel by Labor Categories and narrative justification (if applicable) * Other Direct Costs (ODCs) (materials and supplies, travel, training, etc.(quantities and types only)) * Period of Performance * Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI) * Security (including clearance level) * Teaming Arrangement (including subcontracting; identify new ACAs) * Small Business Plan (if a large business) * Other Pertinent Data, such as assumptions made.

  • 253 Design Change (a) “Design Change” is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Scope of Work The Contractor has overall responsibility for and shall provide and furnish all materials, equipment, tools and labor as necessary or reasonably inferable to complete the Work, or any phase of the Work, in accordance with the Owner’s requirements and the terms of the Contract Documents.