Protection and Cleaning Sample Clauses

Protection and Cleaning. (1) The Contractor shall protect and preserve the work from all damage or accident providing any temporary roof, window and door coverings, boxing or other construction as required by the Engineer. This protection shall be provided for all property adjacent to the site as well as on the site.
AutoNDA by SimpleDocs
Protection and Cleaning. All aluminium must be protected against damage by covering with temporary casings (masking tape, plastic coatings, etc.), and against deterioration or discolouration caused by mortar, wax, paint, etc., all to the entire satisfaction of the Principal Agent. On completion, all such protection shall be removed, and work cleaned down and left in proper working order. All glazing is to be protected from damage, breakage, scratches, etc., and allowances shall be made for polishing the glass as and when instructed by the Main Contractor. PRESSED STEEL DOOR FRAMES 1,2mm Thick double rebated frames suitable for half brick walls complete with hoop iron anchors welded to frame, one adjustable stainless steel striking plate suitable for cylinder locks, three rubber shock absorbers in rebate and one pair of 100mm standard heavy duty brass butt hinges welded to frame: Frame for door size 813 x 2032mm high. Frame for door size 964 x 2032mm high. SUNDRY GALVANIZED STEELWORK Bearers to brick linings, lintels, etc.: 25 x 25 x 3mm Thick angle section framing with one leg bolted to concrete with and including M6 x 50mm bolts and other leg screw fixed to wrought wood timber frame. ALUMINIUM WINDOWS, DOORS, ETC. Work group No 140 for JBCC CPAP purposes Carried to Collection Section No. 2 Bill No. 11 PREPARED FOR: Xxx Xxxxxxxx Associates Architects No No m 20 2 420 R Supplementary Preambles Aluminium and glazing shall comply with the following specifications: Minimum performance requirements as published by AAMSA; Aluminium alloy extrusion BSS 1474. Aluminium alloy sheets SANS 903. Anodising SANS 999. Neoprene performed seals and gaskets SATM C542 Powder coat finishing SANS 1274 and 1578 (with a test certificate available on request). National Building Regulations Part "N", SANS 0137, SANS 0400, SANS 1263 and AAMSA Selection guide for Safety Glazing Materials: monolithic obscure and float glass thicknesses and glazing, shall comply strictly to these specifications. DOORS, WINDOWS, ETC. to be manufactured by an approved firm of specialists, to be of the best quality and design truly square and unless otherwise described, prepared to receive glazing beads from the outside. All opening portions must fit perfectly on all faces and be so hung as to open and close freely without binding at any point. Wherever possible, all angles and intersections to be welded by electric welding, argon or arc welding. A sample window is to be submitted to the Employer for approval before the work is ...
Protection and Cleaning a. During installation of fixtures and accessories and until final acceptance, protect items with strippable plastic or other approved means to maintain fixtures in perfect conditions. b. All exposed metal surfaces shall be polished clean and rigid of grease, dirt or other foreign materials upon completion. c. Upon completion, thoroughly clean all fixtures and accessories to leave the work in polished condition.
Protection and Cleaning. A. Protect glass from contact with contaminating substances resulting from construction operations. Remove any such substances by method approved by glass manufacturer. B. Wash glass on both faces not more than four clays prior to date scheduled for inspections
Protection and Cleaning. 1. The Contractor shall be responsible for protecting finished surfaces from damage during fabrication, shipping, storage, and testing. This item will be paid at the Contract Price for “Equipment Rack” which price shall include all administrative and procedural requirements, equipment, labor, testing, materials, and work incidental therto. PAY ITEM PAY UNIT Equipment Rack Each ITEM #1108539A - MODIFY EXISTING OPERATIONS CENTER CONTROL SYSTEM‌‌
Protection and Cleaning 

Related to Protection and Cleaning

  • Preservation, Maintenance, and Protection of the Property Inspections. Borrower will not destroy, damage, or impair the Property, allow the Property to deteriorate, or commit waste on the Property. Whether or not Borrower is residing in the Property, Borrower must maintain the Property in order to prevent the Property from deteriorating or decreasing in value due to its condition. Unless Lender determines pursuant to Section 5 that repair or restoration is not economically feasible, Borrower will promptly repair the Property if damaged to avoid further deterioration or damage. If insurance or condemnation proceeds are paid to Lender in connection with damage to, or the taking of, the Property, Borrower will be responsible for repairing or restoring the Property only if Xxxxxx has released proceeds for such purposes. Lender may disburse proceeds for the repairs and restoration in a single payment or in a series of progress payments as the work is completed, depending on the size of the repair or restoration, the terms of the repair agreement, and whether Borrower is in Default on the Loan. Lender may make such disbursements directly to Borrower, to the person repairing or restoring the Property, or payable jointly to both. If the insurance or condemnation proceeds are not sufficient to repair or restore the Property, Borrower remains obligated to complete such repair or restoration. Lender may make reasonable entries upon and inspections of the Property. If Lender has reasonable cause, Xxxxxx may inspect the interior of the improvements on the Property. Lender will give Borrower notice at the time of or prior to such an interior inspection specifying such reasonable cause.

  • Protection of Property Seller assumes, and shall ensure that all subcontractors thereof and their respective employees assume, the risk of loss or destruction of or damage to any property of such parties whether owned, hired, rented, borrowed or otherwise, brought to a facility owned or controlled by Buyer or Buyer’s customer. Seller waives, and shall ensure that any subcontractor thereof and their respective employees waive, all rights of recovery against Buyer, its subsidiaries and their respective directors, officers, employees and agents for any such loss, destruction or damage. At all times Seller shall, and ensure that any subcontractor thereof shall, use suitable precautions to prevent damage to Buyer's property. If any such property is damaged by the fault or negligence of Seller or any subcontractor thereof, Seller shall, at no cost to Buyer, promptly and equitably reimburse Buyer for such damage or repair or otherwise make good such property to Buyer’s satisfaction. If Seller fails to do so, Buyer may do so and recover from Seller the cost thereof.

  • Protection of the Environment If the Contractor encounters circumstances such as weather conditions or site factors where the Contractor knows or should reasonably know that proceeding with the Work may, directly or indirectly, cause Environmental Damage, the Contractor shall:

  • Protection The Asset Representations Reviewer will take reasonable measures to protect the secrecy of and avoid disclosure and unauthorized use of Confidential Information, including those measures that it takes to protect its own confidential information and not less than a reasonable standard of care. The Asset Representations Reviewer acknowledges that Personally Identifiable Information is also subject to the additional requirements in Section 4.09.

  • Protection of Third Parties No person (including a purchaser) dealing with the Agent or a Receiver or its or his agents will be concerned to enquire: (a) whether the Secured Liabilities have become payable; (b) whether any power which the Agent or a Receiver is purporting to exercise has become exercisable or is being properly exercised; (c) whether any money remains due under the Finance Documents; or (d) how any money paid to the Agent or to that Receiver is to be applied.

  • Eye Protection Where an employee is required by the College or by legislation, in order to perform his/her duties, to acquire and wear prescription eye protection, the employee shall provide the College with proof of purchase by March 1 each year and the College shall reimburse to such employee, on the first pay day of April in each year, up to a maximum of twenty dollars ($20.00); in situations other than the foregoing, the College, may in its discretion, (which discretion shall not be unreasonably exercised) reimburse such expense where it is recommended by the health and safety committee constituted under the Occupational Health and Safety Act.

  • Protection of PFPC PFPC shall be indemnified by the Fund and without liability for any action PFPC takes or does not take in reliance upon directions or advice or Oral Instructions or Written Instructions PFPC receives from or on behalf of the Fund or from counsel and which PFPC believes, in good faith, to be consistent with those directions or advice and Oral Instructions or Written Instructions. Nothing in this section shall be construed so as to impose an obligation upon PFPC (i) to seek such directions or advice or Oral Instructions or Written Instructions, or (ii) to act in accordance with such directions or advice or Oral Instructions or Written Instructions.

  • PROTECTION OF TEACHERS A. The Board recognizes its responsibility to give reasonable support and assistance to Teachers for the maintenance of control and discipline in the classroom. Each Teacher, however, bears the primary responsibility for maintaining proper control and discipline in the classroom. B. As permitted by Section 1309 of the Revised School Code, a Teacher may temporarily exclude a student from one (1) class when the nature of the offense, the persistence of the misbehavior, or the disruptive effect of the violation makes the continued presence of the student in the classroom intolerable. In such cases, the Teacher will furnish the Principal with written particulars of the incident as promptly as teaching obligations allow. Upon request of the Principal, the Teacher shall notify the student’s parent of the nature of the offense. If the Principal determines the need for a meeting with the student’s parent, the Teacher shall attend that meeting. C. The Teachers recognize that all disciplinary actions and methods invoked by them shall be reasonable and just. D. Any assault or threatened assault upon a Teacher, resulting from his/her position as a Teacher, shall be promptly reported to the Building Principal by the Teacher or representative. The Board shall provide legal counsel, if requested in writing by the Teacher, to advise the Teacher of the Teacher’s rights and obligations as to such assault. The Board will provide reasonable assistance to the Teacher in working with law enforcement and judicial authorities, unless such counsel and assistance are provided through the Association. E. If a Teacher is complained against or sued as a result of any reasonable action as defined by a court of law and taken by the Teacher while in the scope of his/her employment with the District, the Board shall provide legal counsel and render all reasonable assistance, as appropriate, to the Teacher in his/her defense when requested in writing by the Teacher. This section shall only require the provision of legal counsel and shall not be interpreted to interfere with the Board’s right to exercise supervision and control, including discharge of the Teacher. If a final decision issued by a court or administrative agency indicates the Teacher’s liability for this action, all costs of assistance rendered by the District to the Teacher pursuant to this paragraph and not covered by the District’s insurance carrier, shall be reimbursed by the Teacher. F. Except for disciplinary suspension or discharge, or for incarceration, any work time lost by a Teacher in connection with an incident identified in Article 9.D, not compensable under Workers’ Compensation, shall not be charged against the Teacher, unless the Teacher is adjudged liable by an agency or court of competent jurisdiction. When Workers’ Compensation is paid, the Board shall pay the difference between that sum and the Teacher’s regular salary, but not to exceed the current year’s contract. No deduction of leave shall be made under these circumstances. G. In case of an assault by a student(s) on a Teacher acting in the line of duty, or other action taken by or against a Teacher in the line of duty, causing damage to the Teacher’s personal property, including clothing, the Board shall make an equitable financial settlement for such loss with the Teacher involved. H. Any complaint directed toward a Teacher shall be promptly called to the Teacher’s attention unless otherwise prohibited by law. This requirement shall not prevent the Supervisor from screening out xxxxx gripes. I. Teachers shall be expected to exercise reasonable care as to the safety of students and property.

  • Survival of Protection The provisions of this Section 4 shall continue to afford protection to each Protected Person regardless of whether such Protected Person remains in the position or capacity pursuant to which such Protected Person became entitled to indemnification under this Section 4 and regardless of any subsequent amendment to this Agreement; provided, that no such amendment shall reduce or restrict the extent to which these indemnification provisions apply to actions taken or omissions made prior to the date of such amendment.

  • Procurement of the Site (i) The Authority Representative, the Contractor and Authority’s Engineer shall, within 10 (ten) days of the date of this Agreement, inspect the Site and prepare a detailed memorandum containing an inventory of the Site including the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site (hereinafter referred to as the “Handover Memorandum”). Subject to the provisions of Clause 8.2 (iii), the Handover Memorandum shall have appended thereto an appendix (the “Appendix”) specifying in reasonable detail those parts of the Site to which vacant access and Right of Way has not been given to the Contractor along with details of hindrances in the Construction Zone. For sake of clarity the Handover Memorandum shall clearly specify the parts of Site where work can be executed. Signing of the Handover Memorandum, in three counterparts (each of which shall constitute an original), by the authorized representatives of the Authority, Contractor and Authority’s Engineer shall be deemed to constitute a valid evidence of giving the Right of Way to the Contractor for discharging its obligations under and in accordance with the provisions of this Agreement and for no other purpose whatsoever. (ii) Whenever the Authority is ready to hand over any part or parts of the Site included in the Appendix, it shall inform the Contractor, by notice, of the proposed date and time such of hand over. The Authority Representative and the Contractor shall, on the date so notified, inspect the specified parts of the Site, and prepare a memorandum containing an inventory of the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site so handed over. The signing of the memorandum, in three (3) counterparts (each of which shall constitute an original), by the authorised representatives of the Parties shall be deemed to constitute a valid evidence of giving the relevant Right of Way to the Contractor. If the contractor fails to join for site inspection or disputes the parts of the site available for work, the Authority’s Engineer shall decide the parts of the site where work can be executed and notify to both the parties within 3 days of the proposed date of inspection. The parties agree that such notification of the Authority’s Engineer as mentioned hereinabove shall be final and binding on the parties. (iii) The Authority shall provide the Right of Way to the Contractor in respect of all land included in the Appendix by the date specified in Schedule-A for those parts of the Site referred to therein, and in the event of delay for any reason other than Force Majeure or breach of this Agreement by the Contractor, it shall pay to the Contractor, Damages in a sum calculated in accordance with Clause 8.3. The Contractor agrees that it shall not be entitled to claim any other damages on account of any such delay by the Authority. (iv) Notwithstanding anything to the contrary contained in this Clause 8.2, the Authority shall specify the parts of the Site, if any, for which Right of Way shall be provided to the Contractor on the dates specified in Schedule-A. Such parts shall also be included in the Appendix prepared in pursuance of Clause 8.2 (i). (v) The Authority further acknowledges and agrees that prior to the Appointed Date, it shall have procured issuance of the statutory notification under Applicable Laws for vesting of all the land comprising the Project in the Authority and has taken possession of area for Construction Zone for at least 90% (ninety per cent) of the total length of the Project Highway. The Parties also acknowledge and agree that the conditions specified in this Clause 8.2 (iii) shall not be modified or waived by either Party. (vi) For the avoidance of doubt, the Parties expressly agree that the Appendix shall in no event contain sections of the Project Highway the cumulative length of which exceeds 10% (ten percent) of the total length of the Project Highway. (vii) Pursuant to signing of Handover Memorandum under clause 8.2 (i), Contractor shall submit to the Authority’s Engineer, a monthly land possession report till expiry of 180 (one hundred and eighty) days from Appointed Date, in respect of those parts of the site to which vacant access and right of way was not given to the contractor and included in Appendix to the memorandum signed under clause 8.2 (i), duly specifying the part of the site, if any, for which the right of way is yet to be handed over.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!