Responsibilities and nature of work for the contract workforce Workforce Sample Clauses

Responsibilities and nature of work for the contract workforce Workforce details To complete the facility operation and maintenance works, contractor has to provide the workforce with the following details. Technical Assistants: Diploma in Engineering (Discipline as mentioned in the work formats), with Two years experience shall be employed for the following works. Technical Assistants • Co-ordination between Dept. Engineer & Contract Technicians as per Facility Requirements/works. • Allocation of works to the contract technicians • Supervision of the activities being carried at various facilities by contract team • Results and discrepancies, if any to be reported to the dept engineer • Execution of the planned facility works under supervision of Dept. Engineer • To generate the test reports/records/Drawings • To ensure the presence of technician and their safety at work site. Technical Assistants (Mechanical): • Conducting of test & Evaluation of the systemMaintenance of flow components and spares inventory. • Bubble point testing of filter elements & Configuration of fluid circuits • Conducting helium leak check using MSLD equipment • Performance checks of pumps • Trial assembly and alignment checks of RFDS system at launch padOther process related activities Technical Assistants (Chemical): • Analysis of chemical propellant sample and gas samples • Maintenance of gas chromatography and gas analyzer • Checking of mechanical impurities and moisture content • Other process related activities Technical Assistants (Instrumentation & Control systems): • FCV Functional checks and linearity checks • Propellant pump MCC level checks • Health monitoring of all the instruments and consoles • Ensuring of propellant pump healthiness during checks • EP valve functional verification • End to end Electrical and other instruments checks Technicians (Mechanical): Technicians: ITI, with two years experience are to be deployed for the following works ➢ Servicing (Bench testing) of valves and testing of spools ➢ Filter elements cleaning, testing and installation. ➢ Testing cylinders and hoses & Servicing of RVE/RRU/RVV ➢ Purging of pipe lines & Leak checks of fluid circuits ➢ Testing of pressure vessels and accumulators ➢ Replacement of neutralizer solutions ➢ Functional checks of neutralizer pumps ➢ Assembly of RFDS hoods at launch pad and torquing ➢ Removal of RFDS system after launch ➢ Wire locking of critical manual valves ➢ Conditioning and testing of newly fabricated lines ➢ Torque verification for all the flange joints Technicians (...
AutoNDA by SimpleDocs

Related to Responsibilities and nature of work for the contract workforce Workforce

  • CONTRACTOR DUTIES 5.1 The Contractor will perform the following duties in regard to any student data it obtains:

  • Responsibility of the Contractor The Contractor shall be responsible for the quality, technical accuracy, and the coordination of all deliverables and other services furnished by the Contractor under this Contract. The Contractor shall, without additional compensation, correct, or revise any errors or deficiencies in the Work which are discovered within a twelve-month period of final completion of Work.

  • Contractor's responsibility for subcontractors The Contractor shall be as fully responsible to the City for the acts and omissions of its subcontractors, and of persons either directly or indirectly employed by them, as Contractor is for the acts and omissions of persons it directly employs. Contractor shall cause appropriate provisions to be inserted in all subcontracts relating to this work, to bind all subcontractors to Contractor by all the terms herein set forth, and insofar as applicable to the work of subcontractors and to give Contractor the same power regarding termination of any subcontract as the City may exercise over Contractor under any provisions of this contract. Nothing contained in this contract shall create any contractual relation between the subcontractor and the City or between any subcontractors.

  • Responsibility for Subcontractors All requirements for the “Prime” contractor shall also apply to any and all subcontractors. It is the Prime Contractors’ responsibility to insure the compliance by the subcontractors. At all times the Prime Contractor remains liable to the Authority for the performance and compliance of his/her subcontractors.

  • Cost Responsibility for Network Upgrades 9 5.1 Applicability 9 5.2 Network Upgrades 9

  • PRIME CONTRACTOR RESPONSIBILITIES A. The Contractor shall be responsible for completely supervising and directing the work under this Contract and all Subcontractor(s) that it may utilize, using adequate skill and attention. Subcontractor(s) who perform work under this Contract shall be responsible to the Prime Contractor.

  • Contractor Responsibilities 19.1. Contractor shall perform national criminal history checks for Ohio, Indiana, and Kentucky, and 10-panel drug screening tests on all prospective employees performing work under this RFP or coming onto a CMHA property and any resulting contract and provide summaries of the results to the Authority if requested. For the purposes of this section, the term “employees” includes contractor. Prospective employees whose criminal background check discloses a misdemeanor or felony involving crimes of moral turpitude, sexual offenses or harm to persons or property shall not be employed to perform work under this RFP or any resulting contract. Contractor is required to perform drug screening of all employees and to ensure acceptable test results. Criminal history and drug screening checks will be completed at the sole expense of the contractor. Any employee of the Contractor suspected of being under the influence of drugs and or alcohol will be reported to the appropriate personnel at CMHA and/or other local law enforcement. If the employee is determined to be under the influence of drugs or alcohol in any form or manner, or believed by proper authority to be dealing in illicit sale of alcohol or drugs they will be removed and shall not be allowed to return to any job site on the Authority’s property. The Contractor’s contract may be suspended and/or terminated should such a situation occur or if the Contractor fails to submit results pursuant to this section.

  • SCOPE OF WORK AND RESPONSIBILITIES 1. Interconnection Customer’s Scope of Work and Responsibilities The Interconnection Customer will design, construct, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, the System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Xxxxxxxxx Solar Project provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), as such specifications shall be modified as a result of the Interconnection Customer’s post Facilities SERVICE AGREEMENT NO. 2557 Study modifications to the Interconnection Customer’s Interconnection Facilities, and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with the Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The metering of any redundant or standby station service provisions at the Xxxxxxxxx Solar Collector Substation shall be added in accordance with the Connecting Transmission Owner’s retail tariff, P.S.C. No. 220, and the Connecting Transmission Owner’s ESB 750. As per the Project Specific Specifications, the Interconnection Customer will install the RTU provided by Connecting Transmission Owner in accordance with Connecting Transmission Owner’s ESBs, indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. (Note: If no indoor facility is available, then installation of the RTU and revenue metering equipment in a dedicated, weatherproof, heated cubicle (accessible only to Connecting Transmission Owner) is acceptable.) For the revenue metering, the Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications, ESB 752 and ESB 750. The Interconnection Customer shall mount the revenue metering CT/PT units, make grounding connections, and complete all primary wiring. The Interconnection Customer shall install the meter socket enclosure near the Connecting Transmission Owner’s RTU in accordance with the Project Specific Specifications. Additional right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 301 Tap and must accommodate the 125’ x 125’ work pads required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the Line 301 Tap line, access roads to/from the Line 301 Tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019). The Interconnection Customer is responsible for all permitting. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of the Connecting Transmission Owner’s Interconnection Facilities.

  • Contractor Key Personnel ‌ The Contractor shall assign a Corporate OASIS Program Manager (COPM) and Corporate OASIS Contract Manager (COCM) as Contractor Key Personnel to represent the Contractor as primary points-of-contact to resolve issues, perform administrative duties, and other functions that may arise relating to OASIS and task orders solicited and awarded under XXXXX. Additional Key Personnel requirements may be designated by the OCO at the task order level. There is no minimum qualification requirements established for Contractor Key Personnel. Additionally, Contractor Key Personnel do not have to be full-time positions; however, the Contractor Key Personnel are expected to be fully proficient in the performance of their duties. The Contractor shall ensure that the OASIS CO has current point-of-contact information for both the COPM and COCM. In the event of a change to Contractor Key Personnel, the Contractor shall notify the OASIS CO and provide all Point of Contact information for the new Key Personnel within 5 calendar days of the change. All costs associated with Contractor Key Personnel duties shall be handled in accordance with the Contractor’s standard accounting practices; however, no costs for Contractor Key Personnel may be billed to the OASIS Program Office. Failure of Contractor Key Personnel to effectively and efficiently perform their duties will be construed as conduct detrimental to contract performance and may result in activation of Dormant Status and/or Off-Ramping (See Sections H.16. and H.17.).

  • Responsibilities of the Contractor The Contractor shall provide all technical and professional expertise, knowledge, management, and other resources required for accomplishing all aspects of the tasks and associated activities identified in the Scope of Work. In the event that the need arises for the Contractor to perform services beyond those stated in the Scope of Work, the Contractor and the City shall negotiate mutually agreeable terms and compensation for completing the additional services.