Sanitary Sewer Easements Sample Clauses

Sanitary Sewer Easements. Sanitary sewer main easements and rights-of-way for the purpose of installing, constructing, operating, maintaining, adding to or altering and replacing present or future sewer mains, manholes, and other appurtenant facilities, including but not limited to, any communications equipment deemed necessary by the Authority in the Authority’s sole discretion (the “Sanitary Sewer Facilities”).
AutoNDA by SimpleDocs
Sanitary Sewer Easements. At the time of the applicable final platting or prior to construction of the 12” and 8” Sewer Line from Point A to Point C and Sewer Line from Point C to Point E, the Parcel Owners and/or their successors and assigns whose parcel will contain or is necessary for the construction or operation of such Internal Sewer Lines, shall dedicate and convey all necessary temporary and permanent sanitary sewer easements to the City located within such Parcel Owner’s Parcel of the Property, without additional cost or consideration. Said easements shall be nonexclusive easements; provided that, no permanent building improvements will be permitted to be constructed over the top of said easements.
Sanitary Sewer Easements. At the time of the applicable final platting or prior to construction of said sewer line, the Property Owners shall dedicate and convey all temporary and permanent nonexclusive sanitary sewer easements to the City necessary for the construction and operation of Sewers C, D, E, F, G and H and the Internal Sewer Lines that are located within each Property Owner’s Parcel(s) of the Property, without additional cost or consideration, in conjunction with the construction of such sewer lines as set forth above.
Sanitary Sewer Easements. At the time of the applicable final platting or upon the earlier request by the City, the Property Owner shall dedicate and convey all necessary temporary and permanent sanitary sewer easements to the City located within the Property, without additional cost or consideration. Said easements shall be nonexclusive easements; provided that, no permanent building improvements will be permitted to be constructed over the top of said easements. The City, with the cooperation of the Property Owner, shall acquire all temporary and permanent nonexclusive easements necessary for the construction and operation of the SW Subbasin Extension located outside the Property in a timely manner after the Property Owner provides the City reasonable advance notice of the estimated timeframe for the construction of the SW Subbasin Extension. In the event Property Owner is constructing the SW Subbasin Extension through the City’s Executive Order process, the costs of the temporary and permanent easements including, but not limited to, the amount of any condemnation award, court costs, expert witness fees, testing fees, interest, and City staff time shall be paid by the Property Owner and included as part of the project cost of the SW Subbasin Extension to be reimbursed to Property Owner. The City is authorized to utilize condemnation, if necessary, to acquire the temporary and permanent easements.
Sanitary Sewer Easements. The Owner does hereby grant and convey unto the Town, its successors and assigns, easements through and across the Property for the purpose of installing, constructing, operating, maintaining ,repairing, replacing, adding to, or altering present or future sanitary sewer lines, including building connection lines, manholes and other appurtenant facilities for the collection of sanitary sewage and its transmission, said easement areas being more particularly bounded and described on the Plat as “ .” The above-described easement is subject to the following conditions:

Related to Sanitary Sewer Easements

  • Sanitary Sewer Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all possible control as established or attained during preliminary survey, including but not limited to – section corners, property irons, intersection center-center irons, other set monuments ▪ benchmarks, including TBM set with preliminary survey ▪ center of manholes ▪ end of manhole stubs (when longer than five feet)

  • Utility Easements 2.1 Some properties may at the discretion of the Developer be subject to easements in favour of suppliers of water, power, gas, telephone, internet and wastewater utilities and services, including SaskPower for location of a transformer and SaskTel. The Property Owner acknowledges that the location of any transformer and which lots will be affected by any such easements, will not be known until such utility and service providers complete their design work and the Developer has negotiated the terms and conditions thereof. The Property Owner further specifically acknowledges and agrees that the Property may be subject to any such easement, and that the same shall not affect or result in a decrease or abatement of the purchase price of the Property.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Access Easement The Owner shall grant to VBWD the necessary easements and rights-of-way and/or maintain perpetual access from public rights-of-way to the Facility for VBWD, its agent, or contractor.

  • Easements Lessor reserves to itself the right, from time to time, to grant such easements, rights and dedications that Lessor deems necessary or desirable, and to cause the recordation of Parcel Maps and restrictions, so long as such easements, rights, dedications, Maps and restrictions do not unreasonably interfere with the use of the Premises by Lessee. Lessee shall sign any of the aforementioned documents upon request of Lessor and failure to do so shall constitute a material breach of this Lease.

  • Conservation Easement School shall abide by the terms of the Easement, attached as Exhibit “D” and granted by the District to Authority. The Easement shall be recorded against the Subject Property by the Authority, at the Authority’s sole cost and expense. This Easement may be executed and recorded without further approval of the Parties’ governing bodies, except that approval is required to authorize the execution of this Agreement.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Easement To the extent applicable, Owner agrees to grant to Bell a non-exclusive easement and statutory right of way and/or a path to the property line from the Building, as the case may be and in or through the Equipment Space if it is determined that a fibre optic cable or such other Equipment must be installed to the Building and/or in the Equipment Space. Owner and Bell shall in advance, agree upon a suitable location to install the fibre optic cable on the property of the Owner. Owner agrees to allow Bell to register, at Xxxx'x expense, the easement and right of way, and/or notice of this Agreement.

  • Sanitary and Phytosanitary Measures 1. The rights and obligations of the Parties in respect of sanitary and phytosanitary measures shall be governed by the WTO Agreement on the Application of Sanitary and Phytosanitary Measures.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!