Scope of Specification Sample Clauses

Scope of Specification. The following criteria cover the general requirements for the installation of instrumentation and control systems. The scope of work covered by this specification includes, but is not limited to installation and support of field instruments, instrument impulse lines, pneumatic signal lines, sample lines, and local instrument cabinets. Eyewash stations and showers use shall be alarmed in the DCS. No primary sensor full-scale signal level, other than thermocouples, will be less than 10 mV or greater than 125 V. To the extent practical, instrumentation will be standardized. Instrument analog signals for electronic instrument systems shall be 4 to 20 ma dc. Instrument analog signals for pneumatic instrument systems shall be 3 to 15 psig. Use of pneumatic controls will be limited to applications where sub-supplier standard designs can’t be provided without them. Local indicating controllers (If required) shall be furnished with an auto-manual function switch. The following units of measurement shall be used in the process measurement and control. English units are preferred, but metric units may be used when in common practice: Parameter Units of Measurement Temperature degrees Fahrenheit (o F) Pressure pounds per square inch gauge (psig) inches of water column (in wc) or (inH2O) pounds per square inch absolute (psia) inches of mercury absolute (HgA) Level General percent Tank Gauge linear feet, inches, and tenths of inches Deviation from normal level Flow Liquids gallons per minute (gpm) pounds per hour (pph or #/hr) Gases and Vapors standard cubic feet per minute at 60 OF (SCFM) standard cubic feet per hour at 60 OF (SCFH) Solids pounds per hour (pph or #/hr) tons per day (tpd) Steam & Water Sampling pH pH (pH Units) Specific conductivity S/cm Cation conductivity S/cm Degassed cation conductivity S/cm Dissolved oxygen parts per billion (ppb) Permanently attached stainless steel tags shall be purchased with all major instrument equipment. Each tag shall carry the item tag number. This tag is in addition to the manufacturer's model number and other data nameplate. Thermocouple and test xxxxx shall have the material of construction stamped on the well. If tag numbers are assigned to these xxxxx, the number shall also be stamped on the well. Instruments in vapor or gas service shall generally be mounted above the sensing point. Instruments in liquid, steam, or condensable vapor service shall generally be mounted below the sensing point. If accessibility, visib...
AutoNDA by SimpleDocs
Scope of Specification. Your proposal should demonstrate a full understanding of all aspects of the specification to enable reliable delivery of the required services. Concateno UK Concateno are the incumbent supplier to the HMPS CBDT programme and propose to continue to supply the Authority with the same high quality of product and support service to the same standard as they have been receiving. We are well placed through our extensive knowledge of drug testing to fully understand and continue to deliver all aspects of the specification of this contract to enable reliable delivery of the required services. Concateno already has in place a successful stock management system based on patterns of kit usage by the establishments xxxx redacted text xxxx. Therefore Concateno are ready to supply the product offerings from day one of contract implementation. By assessing the monthly order patters from establishments, we are able to meet fluctuating demands in kit orders and use. Concateno continue to offer a full customer support package and will provide as much information as possible in a simple and easy to digest format during training sessions We also offer a comprehensive technical support service to address issues associated with kit operation, specificity/interference issues and the interpretation of results. The following facilities are available: • Telephone support on general drug issues, product specific issues and service provisions issues. • Online technical information on all productsAccess to local account managers for general issues Concateno operates a HELPLINE (0800 169 5167) which can be accessed from 8.00 a.m. until 8.00 p.m., 7 days a week, 365 days a year. Product information is presented on our website. The cross-reactivity data we supply is also be made available to the HMP intranet site. All technical queries are periodically reviewed and collated into a frequently asked questions (FAQ) document for distributions. General Queries Concateno has a customer support and order processing team, plus an accounts department available during normal working hours to answer any queries that may be raised. In addition we operate a HELPLINE (0800 169 5167) which can be accessed from 8.00 a.m. until 8.00 p.m., 7 days a week, 365 days a year. Product information is presented on our website, plus enquiries and orders can be received electronically. Attached are the last 12 months quality assurance certificates relating to the Concateno product offering (as per the products ...
Scope of Specification. By implementing the solution, EuroTel Bratislava intends to simplify the processes and interfaces to be able to minimize or replace many of today's components. [LOGO OF CAP GEMINI ERNST & YOUNG] [LOGO OF EUROTEL] -------------------------------------------------------------------------------- Appendix I Scope of Delivery The main interfaces for the BMD shall be: Input o Ericsson AXE MSC's (GSM1,2&3) o Nokia Switches (NMT1&2) o SMS centres (SMSC) o Roaming (TAP3 from MACH & TAP2+ from EuroTel Prague) Data from Network Elements is requested by polling and two types of polling are included. One is set by the clock and the frequency can be from one minute up to 24 hours. The other is event driven whereby the BMD will fetch the CDR file right after it has been created in a directory. o SICAP replacement of CDR handler and DB loader. BMD will mediate ASN.1 data to SICAP system. o CDR Loader replacement- BMD will mediate data as input to Interconnect, VOIP, Security and FDS system.. o BSCS interfacing RIH modul The aim is also for the BMD to reduce the number of standard modules used in the existing systems hence improving performance. The following BSCS processes will be replaced: - File Input Handler (FIH) - Duplicate Record Handler (DRH) - Assembled Input Handler (AIH) By using a new BMD based on standard BMP mediation functionality, the following utilities and programs will be realized within the solution: o In-house developed CDR Collector The present CDR Collector used by EuroTel will be replaced by the standard BMP Collection functionality as defined in section 2.4.3.(WP3 Collector Set-up) and subsection Formatting in section 2.4.5. (WP5 Processing). o Splitter Filtering of post-paid and pre-paid CDRs will be handled using the standard BMP processing nodes described in section 2.4.5. (WP5 Processing). Pre Paid Number Duplicity is not allowed: This is supported by the Duplicate CDR Detection functionality which is a standard processing node in BMP [LOGO OF CAP GEMINI ERNST & YOUNG] [LOGO OF EUROTEL] -------------------------------------------------------------------------------- Appendix I Scope of Delivery o SMS converter CDR based on SMS activity will be processed and converted to the required output format using standard BMP processing nodes described in section 2.4.5 (WP5 Processing) o TAP conversions BMP can handle the TAP2+ and TAP3 formats and process such CDRs using standard BMP processing nodes described in section (WP5 Processing). o Star numbers ...

Related to Scope of Specification

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Changes to Specifications All Specifications and any changes thereto agreed to by the parties from time to time shall be in writing, dated and signed by the parties. Any change to the Packaging process shall be deemed a Specification change. No change in the Specifications shall be implemented by PCI, whether requested by Client, requested by PCI or requested or required by any Regulatory Authority, until the parties have agreed in writing to such change, the implementation date of such change, and any increase or decrease in costs, expenses or fees associated with such change (including any change to Pricing). PCI shall respond promptly to any request made by Client for a change in the Specifications, and both parties shall use commercially reasonable, good faith efforts to agree to the terms of such change in a timely manner. As soon as possible after a request is made for any change in Specifications, PCI shall notify Client of the costs associated with such change and shall provide such supporting documentation as Client may reasonably require. Client shall pay all costs associated with such agreed upon changes. If there is a conflict between the terms of this Agreement and the terms of the Specifications, this Agreement shall control. PCI reserves the right to postpone effecting changes to the Specifications, or in the case of changes requested or required by any Regulatory Authority postpone Packaging under this Agreement, until such time as the parties agree to and execute the required written amendment.

  • Product Specifications The Company agrees that all Products sold to Xxxx hereunder shall conform to the respective specifications set forth on Schedule A or to such other specifications as are from time to time agreed upon by the Parties.

  • Specification Changes Upon any change in the Product Specifications, stability protocols, QC laboratory methods raw material specification or Packaging Specifications (whether initiated by Horizon or made in response to a request by sanofi-aventis that is agreed to by Horizon), including the addition of new packaging configurations, new SKUs, new formulations, or a change in either raw materials or Packaging Component supply, Horizon shall promptly advise sanofi-aventis in writing of such changes, and sanofi-aventis shall promptly advise Horizon as to any scheduling and/or price adjustments which may result from such changes. Prior to implementation of such changes, the Parties shall negotiate in good faith in an attempt to reach agreement on (a) the new Product Price for any Product which embodies such changes, (b) any amounts to be reimbursed by Horizon to sanofi-aventis as described in the next sentence of this paragraph, and (c) any other amendments to this Agreement which may be necessitated by such changes (i.e., an adjustment to the lead time for purchase orders). Horizon shall reimburse sanofi-aventis for the mutually agreed upon reasonable expenses incurred by sanofi-aventis as a result of such changes, including, but not limited to, reimbursing sanofi-aventis for its mutually agreed validation and development costs, capital expenditure costs, costs for any Packaging Components or other materials rendered unusable as a result of such changes, and cost of required stability to support a change. If during the Term Horizon amends the Product Specifications or Packaging ***Confidential Treatment Requested MANUFACTURING AND SUPPLY AGREEMENT PAGE 7 Specifications (whether voluntarily or as required by law) so as to render obsolete quantities of the Active Ingredient, Excipients and/or Packaging Components for the Product on hand at sanofi-aventis, Horizon shall (i) accept the return of all such obsolete Active Ingredient and (ii) purchase from sanofi-aventis, at sanofi-aventis’ Acquisition Cost, all such obsolete Excipients and Packaging Components obtained by sanofi-aventis pursuant to its normal procurement policies to manufacture quantities of the Product pursuant to Horizon forecasts under Section 6.1. Sanofi-aventis’ normal procurement policies for purposes of the preceding sentence of this Article 5 shall be considered to be quantities of Excipients and Packaging Components corresponding to the immediately following […***…] months of Horizon’s most recent forecasted Product demand. If a change in Specifications is initiated by sanofi-aventis and approved by Horizon, any cost associated with said change shall be borne by sanofi-aventis. In the event that a change in Specifications is initiated by Horizon or driven by a regulatory or business change, the costs associated with qualification of the change shall be paid by Horizon. The amount of the change shall be reasonable and customary and subject to written approval by Horizon, such approval not to be unreasonably withheld. Sanofi-aventis, with written agreement and approval from Horizon, will be responsible for the appropriate (cGMP) destruction of any materials covered under this Article 5, and sanofi-aventis shall be reimbursed by Horizon at the reasonable and customary approved rate.

  • Specifications That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. The term "Specifications" shall also include all written matter in the Project Manual or on the drawings and any Addenda or Change Orders thereto.

  • Scope of Work The Contractor has overall responsibility for and shall provide and furnish all materials, equipment, tools and labor as necessary or reasonably inferable to complete the Work, or any phase of the Work, in accordance with the Owner’s requirements and the terms of the Contract Documents.

  • Quality Assurance The parties endorse the underlying principles of the Company’s Quality Management System, which seeks to ensure that its services are provided in a manner which best conforms to the requirements of the contract with its customer. This requires the Company to establish and maintain, implement, train and continuously improve its procedures and processes, and the employees to follow the procedures, document their compliance and participate in the improvement process. In particular, this will require employees to regularly and reliably fill out documentation and checklists to signify that work has been carried out in accordance with the customer’s specific requirements. Where necessary, training will be provided in these activities.

  • Statement of Work The Contractor shall provide the services and staff, and otherwise do all things necessary for or incidental to the performance of work, as set forth below:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!