SITE CONDITIONS AND MANAGEMENT Sample Clauses

SITE CONDITIONS AND MANAGEMENT. 11.01. Where the Contractor is working around or in existing structures, it shall verify conditions at the site, including but not limited to, door openings and passages. Any items constructed or manufactured off- site or outside of buildings shall be done so that they are not too bulky for existing facilities. The Contractor shall provide special apparatus as required to handle any such items. All special handling equipment charges shall be at the Contractor's expense. Further, Contractor shall include in its price for the Work, all labor, materials, equipment, including safety devices, and/or engineering services required to protect the adjacent properties and/or structures or persons from damage or injury due to performance of the Work. 11.02. The Contractor shall be responsible for all power, light, and water required to perform the work. 11.03. Throughout the progress of the work, the Contractor shall keep the working area free from debris of all types, and remove from premises all rubbish, resulting from any work being done by him. At the completion of the work, the Contractor shall leave the premises in a clean and finished condition. Any failure to do so may be remedied and charged back to the Contractor.
SITE CONDITIONS AND MANAGEMENT. 11.01. Where the Contractor is working around or in existing structures, it shall verify conditions at the site, including but not limited to, door openings and passages. Any items constructed or manufactured off- site or outside of buildings shall be done so that they are not too bulky for existing facilities. The Contractor shall provide special apparatus as required to handle any such items. All special handling equipment charges shall be at the Contractor's expense. Further, Contractor shall include in its price for the Work, all labor, materials, equipment and/or engineering services required to protect the adjacent properties and/or structures from damage due to performance of the Work. DocuSign Envelope ID: E664D4D2-A1BE-40E6-B775-B52337A89F46 DocuSign Envelope ID: 99F4B787-66E4-4283-BCC4-387B27DE8B50 11.02. The Contractor shall be responsible for all power, light, and water required to perform the work. 11.03. Throughout the progress of the work, the Contractor shall keep the working area free from debris of all types, and remove from premises all rubbish, resulting from any work being done by him. At the completion of the work, the Contractor shall leave the premises in a clean and finished condition. Any failure to do so may be remedied and charged back to the Contractor.
SITE CONDITIONS AND MANAGEMENT. 11.01. All special handling equipment charges shall be at the Contractor's expense and reimbursable by the City. Further, Contractor shall include in its price for the Work, all labor, materials, and/or equipment required to protect the adjacent properties and/or structures from damage due to performance of the Work. 11.02. Throughout the progress of the work, the Contractor shall keep the working area free from debris of all types, and remove from premises all rubbish, resulting from any work being done by him. At the completion of the work, the Contractor shall leave the premises in a clean and finished condition. Any failure to do so may be remedied and charged back to the Contractor. 11.03. The Contractor and any entity over whom the Contractor has control shall not erect any sign on the Project site without the prior written consent of the City. 11.04. City may have other work related to the Project performed at the Project site during the time the Work is performed. Contractor should schedule its Work to coordinate with the work of other contractors and utilities with the understanding that some of that work may be performed at times other than as set out in the Contract Documents or as otherwise anticipated. City will endeavor to have such other work performed so as not to unduly interfere with Contractor's performance when Contractor notifies City of specific reasonable needs well in advance of those needs and where it is possible to do so. Although Contractor should anticipate some delays and interference to its sequence of Work because of work by other contractors and utilities, and may be entitled to either a reasonable extension of time or additional compensation because of them, in the event of substantial delay caused by another contractor or a utility, after advance notice of its needs by Contractor, Contractor will be entitled to make a claim for an extension of time as provided herein.
SITE CONDITIONS AND MANAGEMENT. 13.01 Where the CONTRACTOR is working around or in existing structures, it shall verify conditions at the site, including, but not limited to, roads, easements, door openings, passages, and other existing site conditions. Any items constructed or manufactured off-site or outside of buildings shall be done so that they are not too bulky for existing facilities. The CONTRACTOR shall provide special apparatus as required to handle any such items. All special handling equipment charges shall be at the CONTRACTOR’S sole cost and expense. 13.02 It is the intention of the OWNER’S REPRESENTATIVE to show on the plans the approximate location of all underground utility lines and structures except service connections to buildings. To this end, owners of all known underground lines and structures, including gas, water, electrical cables, telephone cables, sanitary sewers, storm sewers, industrial pipelines, and appurtenances thereto have been contacted and the information provided by them is shown on the plans. Where gas, water, and sewer lines exist in the vicinity, the CONTRACTOR shall assume that service connections exist to each building and exercise appropriate caution during excavation. It is the CONTRACTOR's responsibility to notify various owners in advance when excavation is to be done in the vicinity of their underground lines and structures. Damage to such underground lines and structures, whether or not shown on the plans, shall be the responsibility of the CONTRACTOR and he shall bear the cost of necessary repair or replacement of damaged parts. 13.03 Throughout the progress of the work, the CONTRACTOR shall keep the working area free from debris of all types, and remove from premises all rubbish, resulting from any work being done by him. At the completion of the work, the CONTRACTOR shall leave the premises in a clean and finished condition. Any failure to do so may be remedied by the OWNER or its designee and charged back to the CONTRACTOR. 13.04 The CONTRACTOR shall be responsible for verifying all conditions at the site prior to performing the Work. As such, the CONTRACTOR understands and agrees that it shall be responsible for conditions encountered at the site, including, but not limited to: a. subsurface or otherwise concealed physical conditions which differ from those indicated in the Contract Documents, and b. unknown physical conditions, which differ from those ordinarily found to exist and generally recognized as inherent in construction acti...
SITE CONDITIONS AND MANAGEMENT