Structural Repair Construction Documents Phase Sample Clauses

Structural Repair Construction Documents Phase. A. The Church Street Parking Deck, located at 000 Xxxxx Xxxxxx Xxxxxx, is a four-level (ground plus three elevated levels) parking structure that was originally constructed in 1975. The parking deck is a steel structure with a reinforced concrete slab on steel decking. The deck features a sloping two-bay parking layout with each bay accommodating one-way traffic operation. The northeast corner of the structure, leading off Level 2, has an elevated exit ramp. This ramp is also constructed of reinforced concrete slab on steel decking supported by steel columns and beams. There are three stair towers in this deck and one elevator constructed of cast-in-place concrete on steel decking, similar to the main parking areas. The most recent walk-through, condition assessment of the Church Street Parking Deck was performed by Xxxxxx-Xxxx and Associates, Inc. in May 2011. This assessment included a visual survey of the facility to review the general condition, identification of structural deficiencies and needed repairs, and a recommended maintenance and repair plan specific to the structure. An opinion of probable construction cost was also developed, along with prioritized recommendations, such that repair dollars could be phased over several years. Repair and rehabilitation design will be based on the list of “Priority 1repair items documented in the KHA Condition Assessment Report dated May 2011. “Priority 1” items as documented in the Executive Summary of the Condition Assessment Report are listed below and total an opinion of probable construction cost of $830,000. - Elevated Slab Repair - Moment Connection Repairs - Replace Expansion Joint - Repair Stairs - Perimeter Beam Repair - Column Line E Repairs - Stair Tower Beam Repairs - Replace Joint Sealant - Concrete Repairs - Repair Metal Decking - Apply Silane Sealer - Masonry Wall Crack Repairs - Column Line E Slab Gap Repair - 2-way Crossover Removal - Replace Masonry Wall Joints - Rotated Brick Repair In addition to the below referenced items, Engineer shall be responsible for detailed scope of work referenced in Exhibit K.
AutoNDA by SimpleDocs

Related to Structural Repair Construction Documents Phase

  • Construction Documents Phase 2.2.1.5. Bidding or Negotiation Phase: 2.2.1.6. Construction Administration Phase

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Construction Contract Documents The Construction Contract Documents shall consist of the plans and specifications prepared by the Engineer, and any addenda and change orders thereto, and the Owner-Contractor Agreement, all of which shall be compatible and consistent with this Agreement.

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Agreement Construction Headings or captions to the provisions of this Agreement are solely for the convenience of the parties, are not part of this Agreement, and shall not be used to interpret or determine the validity of this Agreement. Any ambiguity in this Agreement shall not be construed against the drafter, but rather the terms and provisions hereof shall be given their reasonable interpretation.

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.