Coordination of Design and Construction Contract Documents Sample Clauses

Coordination of Design and Construction Contract Documents. 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.
AutoNDA by SimpleDocs
Coordination of Design and Construction Contract Documents. (1) Review all plans, specifications, and other design documents during the schematic design phase, design development phase, and construction documents phase, and advise Owner on site use, foundations, systems, materials, equipment, construction feasibility, availability of labor and materials, procurement time requirements, installation and construction, relative costs, and provide recommendations to Owner without assuming Design Consultantsprofessional responsibility.
Coordination of Design and Construction Contract Documents. 6.5.1 Construction Manager will review all Drawings, Specifications, and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.
Coordination of Design and Construction Contract Documents. 5.1.4.1 Review all BIM Models, Drawings, Specifications, and other Construction Documents as they are developed by the Project Architect during the schematic design, design development, and construction document design stages of the Project.
Coordination of Design and Construction Contract Documents. 5.5.1 During the Design Phase, the Contractor shall review the Design Documents for clarity, consistency, constructability, and coordination among the construction trades. The results of the review shall be provided in writing to the Owner and as notations on the Design Documents. The Contractor is not responsible for providing, nor does the Contractor control, the Project design and contents of the Design Documents. By performing the reviews described herein, the Contractor is not acting in a manner so as to assume responsibility or liability, in whole or in part, for all or any part of the Project design and Design Documents. The Contractor's actions in reviewing the Project design, Design Documents, and in making recommendations as provided herein are only advisory to the Owner. Formal Design Document reviews shall occur concurrent with the construction cost estimates.
Coordination of Design and Construction Contract Documents. Advise Project Team of inconsistencies, defects, or omissions in the drawings and specifications, and recommend alternative solutions whenever the design affects construction feasibility, budget, risks, or schedules. Recommend reasonable adjustments in the scope of the Project, including but not limited to: construction feasibility; quality; availability of materials and labor; cost factors, including costs of alternative materials or designs, costs of operation and maintenance, preliminary budgets, and possible cost savings; methods of verification for determining that the requirements and assignment of responsibilities are included in the proposed drawings and specifications; and any other matters necessary to accomplish the Project in accordance with the Project Schedule and Project construction budget established by HFH.
Coordination of Design and Construction Contract Documents. The Construction Manager shall:
AutoNDA by SimpleDocs

Related to Coordination of Design and Construction Contract Documents

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • PRE-CONSTRUCTION PHASE FEE The Pre-Construction Phase Fee is the total compensation payable to Contractor for the performance of Pre-Construction Phase Services, except for Additional Pre-Construction Phase Services approved in advance and in writing by Owner. The Pre-Construction Phase Fee shall be a lump sum amount based on the AACC established in this Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!