Temporary Positions A) The Employer may create regular temporary positions for vacation relief for more than one (1) incumbent for up to six (6) months duration. B) The Employer may create regular temporary project positions (i.e. grant funded, capital projects, pilot projects, or term specific assignments) for up to twelve (12) months’ duration. These positions are not renewable after the end date of the project, unless the Union and Employer agree to renew/extend the time limits. C) These positions will be posted and filled in accordance with Article 17.01-
Permanent Positions All part-time and full-time positions shall be permanent unless identified as being fixed term in accordance with clause 2.2.5.
Temporary Position (i) is a position that the Employer has determined will be in excess of eight
Temporary Roads As necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Purchaser shall employ such measures as out- sloping, drainage dips, and water-spreading ditches.
Temporary Upgrade An employee in a temporary upgrade status shall have no right to grieve or arbitrate release from such temporary upgrade status.
New Positions The Board, in consultation with the Association, shall prepare a new job description whenever a new position of special responsibility is created or whenever the duties of any such position are changed or increased. When such a position is created or changed, the allowance shall be subject to negotiations between the Board and the Association.
Temporary Disconnection Temporary disconnection shall continue only for so long as reasonably necessary under Good Utility Practice.
Excluded Positions When a College temporarily assigns an employee to the duties and responsibilities of a position excluded from the provisions of this Collective Agreement, the employee's obligations to contribute to the regular monthly Union dues under Article 5.4 and his/her seniority shall continue during the period of such temporary assignment up to a maximum period of twelve
Temporary Work 3.4.1 The Contractor shall have the sole responsibility for the design, erection, operation, maintenance, removal and repair of Temporary Work. 3.4.2 The Contractor shall engage and pay for registered professional engineering Personnel skilled in the appropriate disciplines to perform those functions referred to in GC 3.4.1 where required by Laws or by the Agreement and in all cases where such Temporary Work is of such a nature that professional engineering skill is required or prudent to produce safe and satisfactory results. 3.4.3 Notwithstanding the provisions of 3.1 - CONTROL OF THE WORK, GC 3.4.1 and
Temporary Reassignment Notwithstanding the above, the Appointing Authority may temporarily reassign any employee to another work area and/or shift for five (5) consecutive months or less. With mutual agreement between the Local and the Appointing Authority, such reassignment may extend up to twelve (12) months. At the end of the reassignment, the reassigned employee shall return to his/her former position, unless the position has been abolished, in which case the employee shall return to his/her former work area and shift.