Vibration Control Sample Clauses

Vibration Control. 6. An acceptable measure of tolerance to determine what shall constitute adverse impacts of vibration from the construction and operation of the KSL to the HKSM shall be agreed by the Government. The vibration control requirements in this Appendix do not apply to the HKCC.
AutoNDA by SimpleDocs
Vibration Control. The Consultant shall evaluate vibration producing equipment for transmission of vibration to the building structure and provide necessary isolation as well as eliminate or minimize the transmission of vibration to sensitive scientific equipment.
Vibration Control. The Contractor shall take measures during construction activities to control the movement of the work force and construction machinery/equipment, and to avoid/ minimize activities, which produce vibrations. Sub-Clause 111.17 Measurement Monitoring of Air/Water/Noise and Soil quality shall be paid as per numbers of samples tested. For Compliance of all other provisions made in this Clause 111, it shall be deemedtobeincidentaltotheworkandnoseparatemeasurementshallbemade. The Contractor shall be deemed to have made allowance for such compliance with these provisions in the preparations of his prices for items of work included in the Bills of Quantities and full compensation for such compliance shall be deemed to be covered bythem.” CLAUSE 112 ARRANGEMENT FOR TRAFFIC DURING CONSTRUCTION Sub-Clause 112.4 Traffic Safety and Control Last line of Para 5 shall be read as under: “The signs shall be of approved design and of reflector type.” Add the following paragraph at the end of the clause: “Before commencement of any construction, the Contractor shall prepare and submit details of the arrangements for passing traffic during construction, design of barricades, signs, markings, lights, flags etc. conforming and satisfying the requirements of the “Guidelines on Safety in Road Construction Zones” of IRC: SP 55-2001 and get the same approved by theEngineer. Sub-Clause 112.6 Measurement for Payment and Rates
Vibration Control. The Contractor shall take measures during construction activities to control the movement of the work force and construction machinery/equipment, and to avoid/ minimize activities, which produce vibrations.
Vibration Control. Equipment, piping and ductwork shall be designed for vibration isolation to meet the Code requirements and good engineering practice. Isolation types and deflections shall meet ASHRAE guidelines; refer to ASHRAE Handbook – HVAC Applications.
Vibration Control 

Related to Vibration Control

  • Erosion Control a. The Purchaser shall construct slash and debris erosion barriers, dips, water bars or ditches in skid trails and landings as directed by the Forest Officer. b. The kinds and frequency of erosion control structures shall be adjusted to soil types, topography and climatic conditions as directed by the Forest Officer. c. The Purchaser is required to recontour any excavated skid trails, and provide for effective erosion control in the trail location as directed by the Forest Officer. d. Erosion control work shall commence as soon as skidding is completed on each skid trail or landing, and must be kept current with unit operations. e. Erosion control work shall be completed and approved by the Forest Officer in unfinished units before operations cease for inactive periods including heavy winter snowfall, spring breakup and restricted dates. f. All erosion control work in each unit shall be completed prior to notification pursuant to Section VII.M.7.

  • Site Control In the total loss of building use scenario, what likely exists will be a smoking pile of rubble. This rubble will contain many components that could be dangerous. It could also contain any personnel on the premises at the time of the disaster. For these reasons, the local fire marshal with the assistance of the police will control the site until the building is no longer a threat to surrounding properties and the companies have secured the site from the general public. During this time, the majority owner of the building should be arranging for a demolition contractor to mobilize to the site with the primary objective of reaching the cable entrance facility for a damage assessment. The results of this assessment would then dictate immediate plans for restoration, both short term and permanent. In a less catastrophic event, i.e., the building is still standing and the cable entrance facility is usable, the situation is more complex. The site will initially be controlled by local authorities until the threat to adjacent property has diminished. Once the site is returned to the control of the companies, the following events should occur. An initial assessment of the main building infrastructure systems (mechanical, electrical, fire and life safety, elevators, and others) will establish building needs. Once these needs are determined, the majority owner should lead the building restoration efforts. There may be situations where the site will not be totally restored within the confines of the building. The companies must individually determine their needs and jointly assess the cost of permanent restoration to determine the overall plan of action. Multiple restoration trailers from each company will result in the need for designated space and installation order. This layout and control is required to maximize the amount of restoration equipment that can be placed at the site, and the priority of placements. Care must be taken in this planning to ensure other restoration efforts have logistical access to the building. Major components of telephone and building equipment will need to be removed and replaced. A priority for this equipment must also be jointly established to facilitate overall site restoration. (Example: If the AC switchgear has sustained damage, this would be of the highest priority in order to regain power, lighting, and HVAC throughout the building.) If the site will not accommodate the required restoration equipment, the companies would then need to quickly arrange with local authorities for street closures, rights of way or other possible options available.

  • Access Control Supplier will maintain an appropriate access control policy that is designed to restrict access to Accenture Data and Supplier assets to authorized Personnel. Supplier will require that all accounts have complex passwords that contain letters, numbers, and special characters, be changed at least every 90 days, and have a minimum length of 8 characters.

  • Input Control The possibility to subsequently verify and determine whether, and by whom, personal data was entered into, changed or removed from data processing systems must be ensured. • Definition of entry authorisation • Logging of logins

  • Control Area An electric power system or combination of electric power systems to which a common automatic generation control scheme is applied in order to: (1) match, at all times, the power output of the generators within the electric power system(s) and capacity and energy purchased from entities outside the electric power system(s), with the load within the electric power system(s); (2) maintain scheduled interchange with other Control Areas, within the limits of Good Utility Practice; (3) maintain the frequency of the electric power system(s) within reasonable limits in accordance with Good Utility Practice; and (4) provide sufficient generating capacity to maintain operating reserves in accordance with Good Utility Practice.

  • Pollution Control The Employer and the Union agree to limit all forms of environmental pollution.

  • Job Control Personal Data being processed on commission (i.e., Personal Data processed on a customer’s behalf) is processed solely in accordance with the Agreement and related instructions of the customer.

  • Climate Control a. The air conditioning/heating units shall be functional at all times. b. The air discharged from the air conditioner interior vent system shall be continuously cool. c. All air conditioning temperature controls and functions shall operate as originally designed and manufactured with no knobs or components broken or missing. d. Systems shall operate on all OEM speeds with no excessive noise.

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Pest Control Upon award, the Contractor shall manage all insect, weed and pest problems (as defined by Chapter 482, F.S.). In addition, any damage caused by pests during the implementation of the pest control program shall be immediately corrected by replacement with healthy turf or plants at the Contractor's expense. Pest Control program shall include, at a minimum, the following: 1) The Contractor shall inspect the entire property, including turf areas, shrubs, trees (including palms), and plants on a weekly basis for any pest infestation. All infestations, including disease, weeds, fire ants or other pests, shall be treated immediately upon discovery and notification by Performance Administrator or the Contractor. The County Performance Administrator must be informed of infestations discovered and treatments applied via email within 24 hours and included on the Monthly Vendor Inspection Report. All applications of pesticides shall be properly labeled by placards. 2) Application must comply with manufacturer’s recommendations. Every chemical substance used must be on the list of chemical substances or have been submitted for inclusion on such list, as compiled by the Environmental Protection Agency (EPA) pursuant to the Toxic Substances Control Act and in compliance with all Federal, State, and local pesticide laws and ordinances. Materials and application shall meet all Federal Health and Safety Laws currently in effect. Safety Data Sheets (SDS) must be submitted in writing two (2) days prior to contract start date or before the use of a new approved chemical intended for use on this contract. All chemicals used must carry an EPA approved number. 3) Pest Control Services shall be performed according to Integrated Pest Management Strategies to control all insect, wee, and pest problems as defined by all sections under Chapter 482, Florida Statues including proper licensure whether by the Contractor or a sub- contractor to be supplied with pre-bid package.