Audited Site definition
Examples of Audited Site in a sentence
IDEMIA CC Audited Production Sites/PlantsIDEMIA CC Audited Production Sites are listed below: Table 4 : Audited Production Sites (Option 1) Image Loading audited IC Manufacturer siteFLASH image containing both the “ID-One Cosmo X” Java Card Platform OS along with the CombICAO Applet v3 is securely delivered directly from the software developer (IDEMIA R&D Audited Site) to the IC Manufacturer (Infineon CC Audited Site) to be loaded into FLASH memory.
PackageTable 5 Option 1: Both Platform and Applet packages are loaded at IC Manufacturer Site (Option 2) Image loading at IDEMIA and External sitesFLASH image containing both ID-One Cosmo X Platform along with CombICAO Applet v3 is securely delivered directly from the software developer (IDEMIA R&D Audited Site) for loading to CC Audited IDEMIA Production Sites (Refer Audited Production Sites Table) or Non-Audited IDEMIA Sites or External Sites.
The applet code will be integrated into FLASH by the IC manufacturer on top of the platform already loaded by IC manufacturer (NXP), or(Option 2) the TnD v5.1 application with Common package and Adapter package and the guidance documentation are securely delivered directly from the software developer (IDEMIA R&D Audited Site) to the travel document manufacturer (IDEMIA Audited Production Sites or IDEMIA Non-Audited Sites) for production.
Depending on the intention:(Option 1) the TnD v5.1 application with Common package and Adapter package is securely delivered directly from the software developer (IDEMIA R&D Audited Site) to the IC manufacturer (NXP Audited Site).
The TnD v5.1 Applet with its Common package along with the TOE’s guidance documentation is securely delivered directly from the Software Developer (IDEMIA R&D Audited Site) to Audited IDEMIA Production Sites (Haarlem, Noida, Vitré, Shenzhen, Ostrava) or Non- Audited IDEMIA Sites or External Sites.Loading of the TnD v5.1 Applet and its Common package on top of the already present COSMO X GP Java Card OS in any of these sites is accomplished by using a GP CLFDB decryption Key.
PackageTable 4 Option 1: Both Platform and Applet packages are loaded at IC Manufacturer Site (Option 2) Image loading at IDEMIA and External sitesFLASH image containing both ID-One Cosmo X Platform along with CombICAO Applet v3 is securely delivered directly from the software developer (IDEMIA R&D Audited Site) for loading to CC Audited IDEMIA Production Sites (Refer Audited Production Sites Table) or Non- Audited IDEMIA Sites or External Sites.
The applet code will be integrated into FLASH by the IDEMIA Audited Production Sites or Non-Audited Sites on top of the platform already loaded by IC manufacturer (NXP), or (Option 3) the TnD v5.1 application with Common package and Adapter package and the guidance documentation are securely delivered directly from the software developer (IDEMIA R&D Audited Site) to external authorized agent (other external sites) for production.
Table 9 Option 1: Both Platform and Applet packages are loaded at IC Manufacturer Site (Option 2) Image loading at IDEMIA and External sitesFLASH image containing both Cosmo X Platform along with TnD v5.1 Applet and Common package is securely delivered directly from the software developer (IDEMIA R&D Audited Site) for loading to CC Audited IDEMIA Production Sites (Haarlem, Noida, Vitré, Shenzhen or Ostrava) or Non-Audited IDEMIA Sites or External Sites.
Depending on the intention: (Option 1) the developer sends the image (containing both the Java Card platform and the Tachograph applet) to be flashed in the IC to the IC Manufacturer Audited Site in the phase 3.Or (Option 2) the platform developer sends the image (containing only the Java Card platform) to be flashed in the IC to the IC manufacturer in the phase 3.
In the event that any Audited Site is found to be non- compliant with one or more GMP standards, Surface will submit to GSK a proposed recovery plan or Corrective and Preventative Actions (“CAPA”) as soon as reasonably practicable after Surface, its Affiliate or its permitted subcontractor receives notification of such non-compliance from the relevant Regulatory Authority and Surface will use reasonable efforts, at Surface’s cost, to implement such recovery plan or CAPA promptly after submission.