Examples of DD Documents in a sentence
If Lessor fails to respond to the above request for approval within thirty (30) days of receipt of the Bridge DD Documents, then Lessee may send Lessor a second notice requesting Lessor’s approval of the Bridge DD Documents, which notice shall be in accordance with the Deemed Approval Process set forth in Section 34 hereof.
Within thirty (30) days of receiving the Bridge Construction Drawings, Lessor shall determine whether to approve (a) the Interconnection Point and (b) any Other Physical Connection Points, in each case only to the extent that the Bridge Construction Drawings disclose new information not previously shown on the Bridge DD Documents, such approval not to be unreasonably withheld, conditioned, or delayed.
Within thirty (30) days of receiving the Bridge DD Documents, Lessor shall determine whether to approve (a) the Interconnection Point and (b) any Other Physical Connection Points, in each case only to the extent that the Bridge DD Documents disclose new information not previously shown on the Bridge Schematic Drawings, such approval not to be unreasonably withheld, conditioned, or delayed.
Any disapproval shall be in writing and shall specify the specific reasons for the denial and the changes to the Bridge DD Documents that would render them acceptable, at which time Lessor and Lessee shall promptly meet and confer in good faith to resolve such issues.
Notwithstanding the foregoing, if Lessor, in connection with its review of the Bridge Construction Drawings, desires to make any changes from what was previously approved by Lessor in the approved Bridge DD Documents, then any direct incremental cost increases (including the costs of revising the Bridge Construction Drawings) associated with such relocation shall be borne by Lessor.
Notwithstanding the foregoing, if Lessor, in connection with its review of the Bridge DD Documents, desires to make any changes from what was previously approved by Lessor in the approved Bridge Schematic Drawings, then any direct incremental cost increases (including the costs of revising the Bridge DD Documents) associated with such relocation shall be borne by Lessor.
DD Documents means the design development documents, such as, plans, elevations, and such other drawings, calculations, and outline specifications that, in TFC’s sole opinion, are of such quality and detail that enable TFC to fix and illustrate the size and character of the entire Project in its essentials as to kinds of materials and assembly details and type of structure and to coordinate the interface of all architectural and structural elements with all building systems.
If Lessor fails to respond to such second notice within fifteen (15) days, Lessor shall be deemed to have approved such Bridge DD Documents.
TFC shall provide A/E a copy of, or reasonable access to, the following information and documentation regarding the Project, the substance of which A/E shall incorporate into the DD Documents.
Approved modifications shall be incorporated into the DD Documents at no cost to TFC.