Permit Unit definition

Permit Unit means any article, machine, piece of equipment, device, process, or combination thereof, which may cause or control the release of air emissions of hexavalent chromium or nickel from a thermal spraying operation and which requires a permit to operate issued by a permitting agency.
Permit Unit means any article, machine or process equipment or other contrivance of which air pollutants emanate or are emitted. A permit unit is any singular continuous operation.
Permit Unit means any part of a source required to obtain an operating permit as determined by the Technical Secretary. Authority: T.C.A. Section 68-25-105 and 4-5-202. Administrative History Original rule filed November 5, 1984; effective December 5, 1984. Date Submitted to EPADate Approved Federal by EPA RegisterOriginal RegMAR 18, 1985AUG 12, 198550 FR 32412 1200-3-22-.02 GENERAL LEAD EMISSION STANDARDS(1) No person shall cause, suffer, allow, or permit lead emissions in excess of the standards in this Chapter. (2) Upon mutual agreement of the owner or operator of a significant source of lead and the Technical Secretary, an emission limit more restrictive than that otherwise specified in this Chapter may be established. Also, upon mutual agreement of the owner or operator of any source and the Technical Secretary, operating hours, process flow rates, or any other operating parameters may be established as a binding limit(s). The mutually acceptable limits shall be stated as a special condition(s) for any permit or order concerning the source. Violation of any accepted special limitations is grounds for revocation of the issued permit and/or other enforcement measures provided for in the Tennessee Air Quality Act. Authority: T.C.A. Section 68-25-105 and 4-5-202. Administrative History: Original rule filedNovember 5, 1984; effective December 5, 1984 Date Submitted to EPADate Approved Federal by EPA RegisterOriginal RegDEC 05, 1984AUG 12, 198550 FR 32412 1200-3-22-.03 SPECIFIC EMISSION STANDARDS FOR EXISTING SOURCES OFLEAD (1) For an existing source that is a significant source of lead, the Technical Secretary shall specify on the operating permit(s) as permit conditions the emission level that is reasonably available control technology (RACT). The RACT emission level specified as permit conditions on the operating permit(s) must be submitted, reviewed and approved by the Administrator of the Environmental Protection Agency or his designee. (2) The possession of a valid permit shall not protect the source from enforcement actions if permit conditions are not met. Authority: T.C.A. 68-25-105 and 4-5-202. Administrative History: Original rule filed November 5, 1984; effective December 5, 1984. Date Submitted to EPADate Approved Federal by EPA RegisterOriginal Reg 1st RevisionDEC 05, 1984AUG 12, 198550 FR 32412JAN 26, 2001OCT 29, 200166 FR 446321200-3-22-.04 STANDARDS FOR NEW AND MODIFIED SOURCES OF LEAD (1) A new source the actual emissions of which are in excess of 5.0...

Examples of Permit Unit in a sentence

  • Alternatively, the permittee may submit a hard copy of the report to Ohio EPA, Division of Surface Water, NPDES Permit Unit, P.O. Box 1049, Columbus, OH, 43216-1049.

  • Following completion of each annual bioassay requirement, the permittee shall report results of the tests in accordance with Sections 2.H.1., 2.H.2.a., 3.H.1., and 3.H.2.a. of the biomonitoring guidance, including reporting the results on the monthly DMR and submitting a copy of the complete test report to Ohio EPA, Division of Surface Water, NPDES Permit Unit, P.O. Box 1049, Columbus, OH, 43216-1049.

  • Following completion of each bioassay requirement, the permittee shall report results of the tests in accordance with Sections 2.H.1., 2.H.2.a., 3.H.1., and 3.H.2.a. of the biomonitoring guidance, including reporting the results on the monthly DMR and submitting a copy of the complete test report to Ohio EPA, Division of Surface Water, NPDES Permit Unit, P.O. Box 1049, Columbus, OH, 43216-1049.

  • Submit one copy to the Ohio EPA Northwest District Office and one copy to: Ohio EPA, Division of Surface Water, NPDES Permit Unit, P.O. Box 1049, Columbus, OH, 43216-1049.

  • Reporting and testing requirements to apply for permission to use additives can be obtained from the Ohio EPA, Central Office, Division of Surface Water, NPDES Permit Unit.

  • Following completion of each annual bioassay requirement, the permittee shall report results of the tests in accordance with Sections 3.H.1. and 3.H.2.a. of the biomonitoring guidance, including reporting the results on the monthly DMR and submitting a copy of the complete test report to Ohio EPA, Division of Surface Water, NPDES Permit Unit, P.O. Box 1049, Columbus, OH, 43216-1049.

  • Following completion of each bioassay requirement, the permittee shall report results of the tests in accordance with Sections 3.H.1. and 3.H.2.a. of the biomonitoring guidance, including reporting the results on the monthly DMR and submitting a copy of the complete test report to Ohio EPA, Division of Surface Water, NPDES Permit Unit, P.O. Box 1049, Columbus, OH, 43216-1049.

  • Following completion of each quarterly bioassay requirement, the permittee shall report results of the tests in accordance with Sections 2.H.1., 2.H.2.a., 3.H.1., and 3.H.2.a. of the biomonitoring guidance, including reporting the results on the monthly DMR and submitting a copy of the complete test report to Ohio EPA, Division of Surface Water, NPDES Permit Unit, P.O. Box 1049, Columbus, OH, 43216-1049.

  • Submit one copy to the Ohio EPA Southwest District Office and one copy to: Ohio EPA, Division of Surface Water, NPDES Permit Unit, P.O. Box 1049, Columbus, OH, 43216-1049.

  • The insurance Notice of Intent must be sent to the following address along with the appropriate payment (warrant to be furnished by the District upon request by the Contractor, allow warrant processing time.): California State Water Resource Control Board, Division of Water Quality, Storm Water Permit Unit, P.O. Box 1977, Sacramento, California 95812-1977.


More Definitions of Permit Unit

Permit Unit means any part of a source required to obtain an operating permit as determined by the Technical Secretary.
Permit Unit means any part of a source required to obtain an operating permit as determined by the Director.
Permit Unit means an identifiable piece of air pollutant emitting equipment including associated air pollution control equipment, or any operation that produces and/or emits air pollutants, which:

Related to Permit Unit

  • Heat unit means a unit of energy equal to the product of the peak kilovoltage, milliamperes, and seconds, i.e., kVp x mA x second.

  • sub-unit means, with respect to any currency other than euro, the lowest amount of such currency that is available as legal tender in the country of such currency and, with respect to euro, means one cent.

  • FTPS Unit means Units which are purchased through the Fund/SERV(R) trading system or on a manual basis through FTP Services LLC or for which FTP Services LLC is acting as FTPS Unit Servicing Agent.

  • Management Unit means an area established by the Commission for management purposes.

  • Common Unit means a common unit representing a limited partner interest in the Partnership having the rights set forth in the Partnership Agreement.

  • Animal Unit means a unit of measure used to compare differences in the production of animal manure and set forth in Minn. R. 7020.0300, subp. 5.

  • Membership Unit means an outstanding common membership unit of the LLC.

  • Cogeneration unit means a unit that has equipment used to produce electric energy and forms of useful thermal energy (such as heat or steam) for industrial, commercial, heating or cooling purposes, through the sequential use of energy.

  • LLC Unit means a common limited liability interest in the Company.

  • target unit means a facility or group of facilities to which an underlying agreement applies; “tCO2 equivalent” means tonnes of carbon dioxide equivalent;

  • Budget unit means the unit for which the ANB of a district is calculated separately pursuant to 20-9-311.

  • Mobile food unit means a vehicle-mounted food service establishment designed to be readily movable.

  • Wastewater treatment unit means a device which:

  • Power plant means a facility for the generation of

  • apartment unit means any residential dwelling unit within a building containing three or more dwelling units where access to each residential unit is obtained through a common entrance or entrances from the street level and the residential units are connected by an interior corridor;

  • Partnership Unit means a fractional, undivided share of the Partnership Interests of all Partners issued hereunder. The allocation of Partnership Units among the Partners shall be as set forth on Exhibit A, as may be amended from time to time.

  • Project Management Unit and “PMU” each means the Recipient’s unit responsible for the implementation of its Respective Part of the Project referred to in Section I.A.2 of Schedule 2 to this Agreement.

  • Unit and “Quality” means the unit and quantity specified in the schedule.

  • Generating Unit means one or more generating equipment combinations typically consisting of prime mover(s), electric generator(s), electric transformer(s), steam generator(s) and air emission control devices.

  • Partnership Unit Economic Balance means (i) the Capital Account balance of the General Partner plus the amount of the General Partner’s share of any Partner Minimum Gain or Partnership Minimum Gain, in each case to the extent attributable to the General Partner’s Partnership Units divided by (ii) the number of the General Partner’s Partnership Units.

  • Condominium unit A Single Family Property within a Condominium Project.

  • Carbon regeneration unit means any enclosed thermal treatment device used to regenerate spent activated carbon.

  • Power Project or “Project” shall mean the Solar power generation facility of Contracted Capacity of ………..[Insert capacity] MW, located at [Insert name of the place] in …. [Insert name of the District and State] having a separate control system, metering and separate points of injection into the grid at Delivery/Interconnection/Metering point at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. This includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement;

  • Initial Common Units means the Common Units sold in the Initial Offering.

  • Energy Use Intensity (EUI means the kBTUs (1,000 British Thermal Units) used per square foot of gross floor area.

  • Drilling unit means the area fixed for the drilling of one well by order or rule of any state or federal body having authority. If a Drilling Unit is not fixed by any such rule or order, a Drilling Unit shall be the drilling unit as established by the pattern of drilling in the Contract Area unless fixed by express agreement of the Drilling Parties.