Preliminary Completion definition

Preliminary Completion has the meaning set forth in Section 14.1 (Preliminary Completion).
Preliminary Completion is the stage in the progress of the Work when:
Preliminary Completion means, with respect to each unit, system, or component of the Plant, the completion of the work relating thereto, to include setting of the major equipment on foundations; connecting such major equipment to other applicable equipment with piping, wiring, controls and safety systems; ensuring that such equipment and such related operating systems are individually cleaned, leak checked, lubricated, and point-to-point checked to verify that such major equipment and such related operating systems have been correctly installed so as to respond to simulated test signals equivalent to actual signals received during operation; and ensuring that such equipment related operating systems are ready to initial operation, adjustment and testing and may be so operated, adjusted and tested without damage thereto or to any other property and without injury to any person. Preliminary Completion with respect to each unit, system or component of the Plant will be considered as having been achieved notwithstanding that some minor punch list items or that some deficiency not affecting the operation thereof requires correction as agreed by Seller. Preliminary Completion shall include but not be limited to the following pre-commission activities with respect to the applicable unit, system or component; stroking of all control valves, phase rotation of electrical equipment, and continuity of other electrical circuits (including loop checks) and response of controls and control equipment.

Examples of Preliminary Completion in a sentence

  • Within sixty (60) days following Preliminary Completion, the CONTRACTOR shall cause the Testing Engineer to conduct the initial Acceptance Test, subject to Section 10.2.3 below.

  • Table 1-2 Preliminary Completion Dates for Key Project Tasks Key Project Task/Milestone Table 1-3 Preliminary Component Cost Estimates Component Note: The reoccurring 44 in component quantities is due to the fact that there are 44 drawers in the CSE Supply Room where we will test and demonstrate our product.

  • Within ten (10) days after Seller has delivered to Buyer all of the Preliminary Completion Items, Seller, Buyer, Buyer’s agents and representatives, the Perimeter Architect and an architect selected by Buyer (the “Buyer Architect”) shall conduct a final walk through of Perimeter Four and the Perimeter Improvements to assess the status of completion of the Perimeter Improvements (the “Walk-Through”).

  • In the event the Remedial Measures include supplying equipment and materials that were necessary to the Plant, but omitted from its construction, the PROJECT COMPANY shall pay for the costs of such omitted equipment and materials as part of the Cost of the Work if such Remedial Measure is implemented to address Defects discovered before the Plant achieves Preliminary Completion.

  • If Preliminary Completion is not achieved within One Hundred and Twenty (120) days from the Preliminary Completion Date Guarantee (the” Delay Default Date”).

  • In the event the Plant contains any design or construction defects (“Defects”) that cause it to fail to meet any design, construction or Preliminary Completion standard in the Specifications or the Agreement, then the CONTRACTOR shall, at no expense to PROJECT COMPANY (except in the case of omitted equipment and materials, as provided in this Article 10), make (or cause to be made) the Remedial Measures necessary to remedy the Defects.

  • The ADOC shall have no obligation to perform any security sweep, whether requested prior to or as part of a Preliminary Completion determination or otherwise, at any time prior to the date that is 30 days prior to the scheduled Final Completion date for the entire Work.

  • In such event, the CONTRACTOR shall be liable to the PROJECT COMPANY for the reasonably incurred additional costs Preliminary Completion.

  • If the Remedial Measure is implemented to address Defects discovered after the Plant achieves Preliminary Completion, the PROJECT COMPANY shall not be obligated to pay any portion of the cost of the omitted equipment and materials.

  • Any such correction, replacement or repair prior to Preliminary Completion shall not be considered a Remedial Measure.


More Definitions of Preliminary Completion

Preliminary Completion shall occur when, except for minor items of the Work that would not affect the performance or operation of the Plant such as painting, landscaping and so forth (a) all materials and equipment for the Plant have been installed substantially in accordance with the Specifications and checked for alignment, lubrication, rotation, and hydrostatic and pneumatic pressure integrity; (b) all systems required to be installed by the CONTRACTOR have been installed and tested (excluding Acceptance Testing); (c) the Facility has been flushed and cleaned out as necessary; (d) all the equipment and systems can be operated in a safe and prudent manner and have been installed in a manner that does not void any Subcontractor equipment or system warranties; (e) the Plant is ready to commence start-up, Acceptance Testing, and operations; (f) the Plant is physically capable of accepting condensate return and chilled water return; and (g) a Punch List of the uncompleted items is established by the CONTRACTOR and mutually agreed upon by the Parties, provided that if the CONTRACTOR and either of the PROJECT COMPANY disagree as to whether a particular item shall appear on the Punch List, the Independent Engineer (the Developer) shall promptly decide the dispute; (g) all Work, other than Punch List items and Acceptance Testing and any other Work sequenced after Preliminary Completion, has been completed.

Related to Preliminary Completion

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Preliminary Work means all work done in the concept and preparatory stages (including non-exhaustively design, artwork, colour matching).

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Preliminary assessment means the first phase in the process of identifying areas of concern and determining whether contaminants are or were present at a site or have migrated or are migrating from a site, and shall include the initial search for and evaluation of, existing site specific operational and environmental information, both current and historic, to determine if further investigation concerning the documented, alleged, suspected or latent discharge of any contaminant is required. The evaluation of historic information shall be conducted from 1932 to the present, except that the department may require the search for and evaluation of additional information relating to ownership and use of the site prior to 1932 if such information is available through diligent inquiry of the public records.

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;

  • Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.

  • Preliminary Approval means the Court’s Order Granting Preliminary Approval of the Settlement.

  • Substantial Completion Date means the date on which Substantial Completion occurs.

  • Completion Date means the date of completion of the Services by the Service Provider as certified by the Procuring Entity

  • Practical Completion means the completion of the Project where the building is fit for occupancy and/or purpose.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Preliminary Title Report A report issued by a title insurance company in anticipation of issuing a Title Insurance policy which evidences existing liens and gives a preliminary opinion as to the absence of any encumbrance on title to a Mortgaged Property, except liens to be removed on or before purchase or refinance, as the case may be, by the Borrower and Permitted Encumbrances.

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Preliminary Approval Date means the date on which the Court enters the Preliminary Approval Order.

  • The Completion Date means the date of completion of the Works as certified by the Employer’s Representative.

  • Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.

  • Final Completion Date means the date on which Final Completion occurs.

  • Completion means the fulfilment of the Related Services by the Supplier in accordance with the terms and conditions set forth in the Contract.

  • Improvement completion assurance means a surety bond, letter of credit,

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Project Architect means the professional architect or engineer employed by the Owner as architect or engineer of record for the Project and its consultants.

  • Phase or “Phases” in respect of the Project shall mean that the components of the Project are placed in service during more than one year during the Investment Period, and the word “Phase” shall therefore refer to the applicable portion of the Project placed in service in a given year during the Investment Period.

  • preliminary inquiry or "intake" means a mandatory, preadjudicatory interview of the juvenile and, if available, the parents, legal guardian, or other custodian of the juvenile, which is performed by a duly authorized individual to determine whether a juvenile comes within the purview of the Oklahoma Juvenile Code, whether nonadjudicatory alternatives are available and appropriate, and if the filing of a petition is necessary;