After Commencement of Commercial Production Sample Clauses

After Commencement of Commercial Production the Optionee shall, within 45 days after the end of each fiscal quarter, furnish to the Optionor quarterly unaudited statements respecting operations on the Property, together with a statement showing the calculation of Royalty for the fiscal quarter last completed.
AutoNDA by SimpleDocs
After Commencement of Commercial Production on the Property, a Shareholder may unilaterally terminate its participation in this Agreement by delivery of its Common Shares and all of its other securities, if any, that it holds in the capital of MSX to E-38 <PAGE> MSX for cancellation. Such Shareholder shall be liable for any outstanding cash calls and shall post a bond for its proportionate share of any accrued obligation of MSX, including environmental and other mine closure obligations, as determined at the time of such termination. ARTICLE X
After Commencement of Commercial Production. As further described in the Quality Agreement, Genentech shall have the right to have [*] Genentech personnel [*] with operational expertise and another with quality expertise) on-site at the Facility on a full-time basis during all operational hours following the start of Commercial Production to coordinate, expedite and guide the Commercial Runs and Wyeth's performance of its obligations under this Agreement; provided, however, that Genentech shall use its Commercially Reasonable Efforts to assign the same [*] individuals to represent Genentech for the duration of such period so as to minimize the total number of Genentech personnel that are on-site at Wyeth's facility during such period. In addition, Wyeth shall use its Commercially Reasonable Efforts to accommodate up to [*] additional Genentech personnel to be on-site at the Facility on a periodic or part-time basis; provided, however, that, absent Wyeth's request, Genentech shall use its Commercially Reasonable Efforts to minimize the total number of different Genentech personnel that are on-site at the Facility for the duration of such period so as to minimize the impact of their presence in the Facility on Wyeth's operations. Subject to Wyeth's approval, such approval not to be unreasonably withheld or delayed, Genentech shall have the right to designate a reasonable number of additional Genentech personnel to be present at the Facility during Commercial Production on a periodic or part-time basis. Unless otherwise agreed by Wyeth, such representatives of Genentech shall have access to all areas of the Facility as are relevant to the manufacture, storage and/or quality testing of the Product, as well as cafeterias, designated office space and public areas. All Genentech personnel at the Facility shall comply with all Wyeth policies and procedures. In the event any Genentech personnel assigned to the Facility fail to comply with any applicable Wyeth policy or procedure, Genentech, upon Wyeth's request, shall immediately replace such personnel.
After Commencement of Commercial Production the Purchaser shall, within 60 days after the end of each fiscal quarter, furnish to the Royalty Holder quarterly unaudited statements respecting operations on the Property, together with a statement showing the calculation of Royalty for the fiscal quarter last completed.
After Commencement of Commercial Production. Cap-Ex will, within 120 days of the end of Cap-Ex’s financial year, provide Mandu Resources with an audited statement (the “Royalty Statement”) of the royalty payments made to Mandu Resources in the previous financial year.
After Commencement of Commercial Production. Cap-Ex will, within 120 days of the end of Cap-Ex’s financial year, provide Numco with an audited statement (the “Royalty Statement”) of the royalty payments made to Numco in the previous financial year.
After Commencement of Commercial Production. As further described in the Quality Agreement, Genentech shall have the right to designate at its discretion up to [*] of its personnel (and such additional personnel in such numbers as may be agreed to by the parties or as otherwise required to implement a decision made pursuant to Section 3.1.4) to be present in the Lonza Facility during all operational hours during the Term of this Agreement to coordinate, expedite and guide the Commercial Runs and Lonza’s performance of its obligations under this Agreement. While at the Lonza Facility, such representative of Genentech shall have access to all areas as are relevant to the manufacture, storage and or quality testing of the Bulk Product, cafeterias, designated office space and public areas, or as otherwise authorized by Lonza, and shall comply with all applicable Lonza policies and procedures.
AutoNDA by SimpleDocs

Related to After Commencement of Commercial Production

  • Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.

  • Project Commencement The Grantee shall begin the grant-funded project <<on or before insert date>> <<within 90 days of the original start date of the grant term or grant execution date, whichever is later,>>, unless otherwise approved by System Agency. If project commencement is delayed, the Grantee must submit in writing to the assigned contract manager, the steps taken to initiate the project, the reasons for the delay, and the expected start date. System Agency may require Grantee to take immediate remedial or corrective action in response to any delay.

  • TIME OF COMMENCEMENT AND COMPLETION 2.1 The Contractor shall commence the Work upon the date established in the Notice to Proceed. 2.2 The Contractor shall achieve Final Completion, as defined in Section 105.01, Contract Time, Notice of Contract Execution and Notice to Proceed of the Loudoun County Revisions to the 0000 XXXX Xxxx & Bridge Specifications, Division I - General Provisions, within one hundred and eighty (180) calendar days from the date specified in the Notice to Proceed. This time period shall be designated the Contract Time. The Notice to proceed will be issued approximately than thirty (30) days after the execution of this agreement. The Contractor agrees that the time for completion of the Work as described in the Contract Documents shall govern unless specifically amended in writing by the County, and that no claims for early completion are allowed to be presented by the Contractor to the County. 2.3 The County specifies that time is of the essence under this Contract. Time being of the essence, it is essential to the County that Contract work will be completed within the Contract Time. The County and the Contractor agree that damages for failure to complete the work within the Contract Time are not susceptible to exact determination but that $600 per day is in proportion to the actual loss that the County would suffer from such delay. Therefore, the Contractor will pay the County on demand $600 per day for each and every day beyond the one hundred and eighty (180) calendar days, or modified date of completion, that the County determines that work is not complete, as damages caused by such delay and not as a penalty. The County shall be entitled to offset liquidated damages against any sum owed by the County to the Contractor under this Contract. 2.4 The amount of liquidated damages set forth in Articles 2.3 above shall be assessed cumulatively. This provision for liquidated damages does not bar County's right to enforce other rights and remedies against Contractor, which are otherwise legally enforceable, including but not limited to, specific performance or injunctive relief. 2.5 The Contractor hereby waives any defense as to the validity of any liquidated damages stated in this Agreement as they may appear on grounds that such liquidated damages are void as penalties or are not reasonably related to actual damages.

  • Service Commencement Date The date the Transmission Provider begins to provide service pursuant to the terms of an executed Service Agreement, or the date the Transmission Provider begins to provide service in accordance with Section 15.3 or Section 29.1 under the Tariff.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Procurement Planning Prior to the issuance of any invitations to bid for contracts, the proposed procurement plan for the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Guidelines. Procurement of all goods and works shall be undertaken in accordance with such procurement plan as shall have been approved by the Association, and with the provisions of said paragraph 1.

  • Production Phase contract period in which the Development and the Production are to be performed.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Improvement Plan A detailed, written plan collaboratively developed between the teacher and evaluator, utilized when a teacher receives an Evaluation Rating of ineffective. The approved form for the Improvement Plan is attached to this agreement as Appendix .

  • DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be: § 3.2 The Contract Time shall be measured from the date of commencement of the Work.