Airfield Lighting and Signage Sample Clauses

Airfield Lighting and Signage. Garver will provide electrical engineering services to relocate airfield lighting equipment to the new electrical vault and extend duct banks to connect to the existing airfield lighting circuit.
AutoNDA by SimpleDocs
Airfield Lighting and Signage. Airfield lighting and signage impacts will be evaluated. Temporary outages will be needed for replacement of the existing equipment. Temporary lighting options will be considered for high priority circuits. The results of the field inspection will be included in this section. Navigational Aids – Any temporary impacts due to vault equipment as a result of phasing will be discussed in this section. Environmental Considerations – SEH will complete a request for environmental Simple Written Record (SWR) for the project. SEH will also identify necessary permits, if required for contractor to procure. Existing Utilities – SEH will develop a drawing that identifies and delineates existing underground utilities in and adjacent to the project area. This will include a desktop locate of utilities to validate against existing airport record drawings.
Airfield Lighting and Signage. Airfield lighting and signage will be included in the design. Existing edge lighting and signage along Taxiway C and C3 will be analyzed for replacement needs. Additional impacted lights and signs will be identified for covering and/or deactivation during closures. Navigational Aids – NAVAIDs are not anticipated to be impacted by the project, but full analysis will be included in design.
Airfield Lighting and Signage. Airfield lighting and signage will only be impacted by closures during construction. Impacted lights and signs will be identified for covering and/or deactivation during closures. Existing edge lighting and signage along Taxiway B2 will be analyzed for replacement needs. Navigational Aids – NAVAIDs will not be impacted by the project. Pavement Marking – SEH will develop a preliminary pavement marking plan and details for affected work areas as part of reconstruction to be included as part of the report. Environmental Considerations – SEH will complete a request for environmental Categorical Exclusion (CATEX) for the project. SEH will also identify necessary permits, including but not limited to NPDES and developing a Stormwater Pollution Prevention Plan (SWPPP) in concert with preliminary erosion control plans, if required for contractor to procure. Existing Utilities – SEH will develop a drawing that identifies and delineates existing underground utilities in and adjacent to the project area.
Airfield Lighting and Signage. Garver will provide electrical engineering services to design the new lighting improvements on the project including removal of existing lighting and signage in the project area and the installation of new lighting, signage, and airfield lighting power infrastructure.
Airfield Lighting and Signage. Xxxxxx will provide electrical engineering services to design the new taxiway edge lighting improvements on the project.

Related to Airfield Lighting and Signage

  • Moonlighting Employment as a physician in a professional capacity outside of what is outlined in this Agreement, whether temporary special medical activity (“TSMA”) or external moonlighting, must be approved in writing, in advance, by the Departmental Chair, Program Director and Director of Graduate Medical Education (or designee). Even if approved, professional and general liability insurance as outlined in Section 5.4 is not provided to Trainee engaged in external moonlighting. Trainee acknowledges he or she has the responsibility to obtain insurance for such engagement. TSMA and external moonlighting must be included and reported as part of Trainee's hours spent on clinical experience and education. Trainee shall not be required to engage in any outside work.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • CUTTING AND PATCHING The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!