As build Data and drawings Sample Clauses

As build Data and drawings. The as-built drawings will record approved actual field conditions upon completion of the work. The original design drawings will be marked up as the project progresses to indicate as-built conditions. Where there was a change to a specified material, dimension, location, or other feature, the as-built drawing will indicate the work performed. All as-built information shall be submitted to the QMO. As-built drawings submitted on CD-ROM shall be the latest version of AutoCAD as confirmed to by the office of Council’s Chief Engineer: Design. As built drawings will be used to update the design drawings to as-built status at the completion of the work, and shall be certified by the Engineer before submission to the QMO. CoW City of Windhoek MoA Memorandum of Agreement QMO Council’s Quality Monitoring Official (of the Local Authority) TA Traffic Accommodation TMU Traffic Management Unit Agreement: The Memorandum of Agreement (Development Agreement) between Council and the Developer, including all specifications and workmanship standards Engineer: The Engineer appointed by the Developer in accordance with the provisions of the Agreement and acting for and on behalf of the Developer Contractor: The Contractor employed by the Developer in accordance with the provisions of the Agreement QMO: Council’s Quality Monitoring Official, as defined in the Agreement It is the duty of the Developer to ensure that all Works and the construction site are kept in a safe condition for pedestrians and vehicular traffic, particularly when such Works are executed adjacent or within a municipal road reserve. The procedures that are relevant to work within a municipal road reserve, the temporary encroachment onto a lane, temporary closure of a lane or road during construction, and the relevant traffic accommodation measures that need to be taken by the Developer, are contained herein the document entitled: Standard Traffic Accommodation Manual (STAM), which is part of and attached to the Agreement. These measures must be strictly complied with at all times. The STAM provides the procedures for submission, approvals and extensions of the Traffic Accommodation (TA) written applications, plans and notices. The STAM shall be read in conjunction with the Local Authorities Act, 1992 (Act 23 of 1992), Part IX: Streets and Public Places. The Developer shall ensure that the Contractor organizes his work in such a way to reduce the inconvenience to traffic to a minimum, and no public road or s...
AutoNDA by SimpleDocs

Related to As build Data and drawings

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin. b) The Supplier shall be entitled to disclaim responsibility for any design, data, drawing, specification or other document, or any modification thereof provided or designed by or on behalf of the Procuring Entity, by giving a notice of such disclaimer to the Procuring Entity. c) Wherever references are made in the Contract to codes and standards in accordance with which it shall be executed, the edition or the revised version of such codes and standards shall be those specified in the Schedule of Requirements. During Contract execution, any changes in any such codes and standards shall be applied only after approval by the Procuring Entity and shall be treated in accordance with GCC Clause 33.

  • As-Built Drawings Within thirty (30) Days of the successful completion of the Acceptance Test, Seller shall provide for Company review a set of the proposed as‑built drawings for the Company-Owned Interconnection Facilities constructed by Seller (and/or its Contractors). Within thirty (30) Days of Company's receipt of the proposed as‑built drawings, Company shall provide Seller with either (i) its comments on the proposed as‑built drawings or (ii) notice of acceptance of the proposed as‑built drawings as final as‑built drawings. If Company provides comments on the proposed as‑built drawings, Seller shall incorporate such comments into a final set of as‑built drawings and provide such final as‑built drawings to Company within twenty (20) Days of Seller's receipt of Company's comments.

  • Design and Drawings (i) Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. In the event, the Contractor requires any relaxation in design standards due to restricted Right of Way in any section, the alternative design criteria for such section shall be provided for review and approval of the Authority’s Engineer. (ii) The Contractor shall appoint a proof check consultant (the “Proof Consultant”) after proposing to the Authority a panel of three (3) names of qualified and experienced firms from whom the Authority may choose one (1) to be the Proof Consultant. Provided, however, that if the panel is not acceptable to the Authority and the reasons for the same are furnished to the Contractor, the Contractor shall propose to the Authority a revised panel of three (3) names from the firms empanelled as proof consultants by the [Ministry of Road Transport and Highways] for obtaining the consent of the Authority. The Contractor shall also obtain the consent of the Authority for two (2) key personnel of the Proof Consultant who shall have adequate experience and qualifications in highways and bridges respectively. The Authority shall, within 15 (fifteen) days of receiving a proposal from the Contractor hereunder, convey its decision, with reasons, to the Contractor, and if no such decision is conveyed within the said period, the Contractor may proceed with engaging of the Proof Consultant. (iii) The Proof Consultant shall: (a) evolve a systems approach with the Design Director so as to minimise the time required for final designs and construction drawings; and (b) proof check the detailed calculations, drawings and designs, which have been approved by the Design Director. (iv) In respect of the Contractor’s obligations with respect to the design and Drawings of the Project Highway as set forth in Schedule-I, the following shall apply: (a) The Contractor shall prepare and submit, with reasonable promptness and in such sequence as is consistent with the Project Completion Schedule, three (3) copies each of the design and Drawings, duly certified by the Proof Consultant, to the Authority’s Engineer for its approval. Provided, however, that in respect of Major Xxxxxxx and Structures, the Authority’s Engineer may require additional drawings for approval in accordance with Good Industry Practice. (b) by submitting the Drawings for review and approval to the Authority’s Engineer, the Contractor shall be deemed to have represented that it has determined and verified that the design and engineering, including field construction criteria related thereto, are in conformity with the Scope of the Project, the Specifications and Standards and the Applicable Laws; (c) within 15 (fifteen) days of the receipt of the Drawings, the Authority’s Engineer shall review the same and convey its approval/observations to the Contractor with particular reference to their conformity or otherwise with the Scope of the Project and the Specifications and Standards. Provided, however that in case of a major bridge or structure, the aforesaid period of 15 (fifteen) days may be extended up to 30 (thirty) days; (d) if the aforesaid observations of the Authority’s Engineer indicate that the Drawings are not in conformity with the Scope of the Project or the Specifications and Standards, such Drawings shall be revised by the Contractor in conformity with the provisions of this Agreement and resubmitted to the Authority’s Engineer for review and approval. The Authority’s Engineer shall give its observations, if any, within 10 (ten) days of receipt of the revised Drawings. In the event the Contractor fails to revise and resubmit such Drawings to the Authority’s Engineer for review/approval as aforesaid, the Authority’s Engineer may withhold the payment for the affected works in accordance with the provisions of Clause 19.5 (iv). If the Contractor disputes any decision, direction or determination of the Authority’s Engineer hereunder, the Dispute shall be resolved in accordance with the Dispute Resolution Procedure; (e) no review/approval and/or observation of the Authority’s Engineer and/or its failure to review/approval and/or convey its observations on any Drawings shall relieve the Contractor of its obligations and liabilities under this Agreement in any manner nor shall the Authority’s Engineer or the Authority be liable for the same in any manner; and if errors, omissions, ambiguities, inconsistencies, inadequacies or other Defects are found in the Drawings, they and the construction works shall be corrected at the Contractor's cost, notwithstanding any approval under this Article 10; (f) the Contractor shall be responsible for delays in submitting the Drawing as set forth in Schedule-I caused by reason of delays in surveys and field investigations, and shall not be entitled to seek any relief in that regard from the Authority; and (g) the Contractor warrants that its designers, including any third parties engaged by it, shall have the required experience and capability in accordance with Good Industry Practice and it shall indemnify the Authority against any damage, expense, liability, loss or claim, which the Authority might incur, sustain or be subject to arising from any breach of the Contractor’s design responsibility and/or warranty set out in this Clause. (h) the Contractor shall ensure that all the designs and drawings shall be approved from the Authority’s Engineer within 90 days (ninety) from the Appointed Date. (v) Any cost or delay in construction arising from review/approval by the Authority’s Engineer shall be borne by the Contractor. (vi) Works shall be executed in accordance with the Drawings provided by the Contractor in accordance with the provisions of this Clause 10.2 and the approval of the Authority’s Engineer thereon as communicated pursuant to the provisions of sub- Clause (c) & (d) of Clause 10.2 (iv). Such Drawings shall not be amended or altered without prior written notice to the Authority’s Engineer. If a Party becomes aware of an error or defect of a technical nature in the design or Drawings, that Party shall promptly give notice to the other Party of such error or defect. (vii) Within 90 (ninety) days of the Project Completion Date, the Contractor shall furnish to the Authority and the Authority’s Engineer a complete set of as- built Drawings, in 2 (two) hard copies and in micro film form or in such other medium as may be acceptable to the Authority, reflecting the Project Highway as actually designed, engineered and constructed, including an as-built survey illustrating the layout of the Project Highway and setback lines, if any, of the buildings and structures forming part of Project Facilities.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. 4.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate a material, product or system for some portion of the Work. 4.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 4.12.4 The Contractor shall review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the work of the State or any separate contractor, all Shop Drawings, Product Data and Samples required by the Contract Documents. 4.12.5 By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he / she has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he / she has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 4.12.6 The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data or Samples under Subparagraph 2.2.7 of these General Conditions unless the Contractor has specifically informed the Architect and the State in writing of such deviation at the time of sub- mission and the Architect and the State has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Architect's approval thereof. 4.12.7 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Architect on previous submittals. 4.12.8 No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Architect as provided in Subparagraph 2.2.7 of these General Conditions. All such portions of the Work shall be in accordance with approved submittals.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Interconnection Customer Drawings Within one hundred twenty (120) days after the date of Initial Operation, unless the Interconnection Parties agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Transmission Provider and the Interconnected Transmission Owner final, “as-built” drawings, information and documents regarding the Customer Interconnection Facilities, including, as and to the extent applicable: a one-line diagram, a site plan showing the Customer Facility and the Customer Interconnection Facilities, plan and elevation drawings showing the layout of the Customer Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Customer Facility to the step-up transformers and the Customer Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Customer Facility. As applicable, the Interconnection Customer shall provide Transmission Provider and the Interconnected Transmission Owner specifications for the excitation system, automatic voltage regulator, Customer Facility control and protection settings, transformer tap settings, and communications.

  • Communications Equipment (a) Subject to the provisions of this Section 3.5, Tenant shall have the non-exclusive right, at its sole cost and expense and for Tenant’s use, to install, maintain and operate upon the roof of the Building one (1) or a reasonable and necessary additional number of transmitters and/or receiver antennas or dishes approved by Landlord, which approval shall not be unreasonably withheld or delayed (collectively, the “Communications Equipment”) for use by Tenant in the conduct of its business; provided that such Communications Equipment may not materially compromise the aesthetics or appearance of the Building nor shall Landlord be required to incur any expense in accommodating the Communications Equipment. The Communications Equipment must be (i) designed, installed and operated in compliance with all Legal Requirements, and (ii) installed and operated so as not to adversely affect or impact structural, mechanical, electrical, elevator, or other systems serving the Building or customary telephone service for the Building and so as not to cause injury to persons or property, and without limitation of the foregoing, so as not to void or impair any applicable roof warranty. Upon the expiration or termination of this Lease, Tenant shall remove the Communications Equipment and repair any damage to the Building caused by the installation, maintenance, use or removal of the Communications Equipment. (b) Landlord hereby grants to Tenant the right to install (at Tenant’s sole cost and expense) any additional equipment required to operate the Communications Equipment and to connect the Communications Equipment to Tenant’s other machinery and equipment located in the Leased Premises (e.g., conduits and cables) in the shafts, ducts, chases and utility closets located in the core of the building (“Additional Equipment”), which Additional Equipment shall be deemed a part of the Communications Equipment for all purposes of this Section 3.5; provided that (i) the use of such space in the Building core by Tenant (except customary chases for cabling) may not materially adversely affect the marketability of the remaining space on any floor of the Building, and (ii) to the extent any such Additional Equipment occupies space (other than space in customary chases for the Building) that would have otherwise been Net Rentable Area on a floor of the Building, such space shall be included within the Net Rentable Area of the Leased Premises and Tenant shall be obligated to pay Annual Basic Rent and Additional Rent with respect to such space as if such space was included in the Leased Premises. Tenant’s use of such space in the Building core shall be subject to the provisions of this Lease relating to Tenant’s use of Common Areas of the Building. (c) Subject to the Building Rules and other reasonable rules relating to Building security and safety that may be promulgated by Landlord pertaining to access by tenants to the roof of the Building and provided Tenant does not unreasonably disturb any other tenants of the Building, Tenant and Tenant’s contractors shall have reasonable access to the Communications Equipment and the Additional Equipment for purposes of operating, servicing, repairing or otherwise maintaining said equipment. (d) Nothing contained in this Section 3.5 shall be deemed to prohibit or restrict any other individual or entity, including Landlord or any other tenant of the Building, from installing communications equipment on the roof of the Building or to use the roof for any other purpose. (e) In connection with its installation, repair, maintenance and removal of any Communications Equipment and Additional Equipment, Tenant, at Tenant’s sole cost and expense, shall comply with all applicable Building Rules and Legal Requirements and repair any damage to the Building caused by such installation, repair, maintenance or removal. In the event that the placement of Tenant’s Communications Equipment or Additional Equipment interferes with Landlord’s performance of any repair or maintenance to the Common Areas, including the roofs of the Buildings, any costs incurred by Landlord to temporarily or permanently relocate and reinstall Tenant’s Communications Equipment or Additional Equipment shall be included in the cost of such repair or maintenance as a Operating Expense. (f) Tenant’s Communications Equipment and Additional Equipment existing as of the Commencement Date are hereby deemed to be approved by Landlord. Any changes to the existing Communications Equipment and/or Additional Equipment by Tenant shall first be approved by Landlord, which approval will not be unreasonably withheld or delayed. (g) If Landlord shall place on the roof of any Building communications equipment of its own, or shall grant to any third party the right to locate and maintain any such equipment, all such equipment shall be located, designed and operated so as not to interfere with signals to and from Tenant’s Communications Equipment and Additional Equipment, the installation of which, in accordance with this Section 3.5, predates the installation of such other equipment. Similarly, any Communications Equipment and Additional Equipment hereafter installed by Tenant shall be located and designed so as not to interfere with signals to and from such other equipment belonging to Landlord or to third parties, that may have previously been installed. The party responsible for the communications equipment which interferes with equipment previously installed by others shall be required, at its or their expense, to take all measures necessary to eliminate the source of interference caused by such party’s equipment.

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.