Compliance Criteria Clause Samples
Compliance Criteria. Authorization latter from OEM (applies for NON OEM bidders)
Compliance Criteria. Criteria Yes/No
Compliance Criteria. The following GSS (International) Compliance Criteria and SSSA Beneficiation Compliance Criteria and Relative Performance Criteria will apply to both a Sightholder and an Accredited Buyer in respect of supply from SSSA.
Compliance Criteria. 1. Workshop facility must have ISO 9001 certificate, AEMT & EASA membership certificate.
2. Workshop should comply with IEEE, IEC, ISO, ANSI & EASA standards related to AC generators repair and overhaul, as illustrated in “Acceptance criteria”
a. For the repair and rewinding of AC generators, follow IEEE-STD-1068-2015 standards.
b. For testing winding insulation resistance, follow IEEE-STD-43-2000(R2006) standards.
c. For repair of rotating electrical apparatus, follow, IEC 60034, EASA-STD-AR100-2020 standards.
d. For winding Surge test, follow IEEE-STD-522-2004 standards
e. For rotor dynamic balancing, balance on Grade 2.5 or higher, As per ISO 21940-11 standards.
f. For generator winding insulation class, follow original insulation class as per NEMA & IEC-60034-1 standards.
g. Copper used in rewinding should be accompanied with original quality certificate from manufacturer.
Compliance Criteria. 1. The workshop facility must have ISO 9001 certificate, AEMT & EASA membership certificate.
2. The workshop facility must have IECex certification for Exd&E motor overhaul and repair.
3. The workshop shall comply with IEEE, IEC, ISO, ANSI & EASA standards related to AC motors repair and overhaul, as illustrated in "Acceptance criteria."
a. For the repair and rewinding of AC motors, follow IEEE-STD-1068-2015 standards.
b. To test winding insulation resistance, follow IEEE-STD-43-2000(R2006) standards.
c. For the repair of the rotating electrical apparatus, follow the IEC 60034 and EASA-STD-AR100-2020 standards.
d. For winding Surge test, follow IEEE-STD-522-2004 standards
e. For rotor dynamic balancing, balance on Grade 2.5 or higher, As per ISO 21940- 11 standards.
f. For the Motors winding insulation class, follow the original insulation class as per NEMA & IEC-60034-1 standards.
g. Copper used in rewinding should be accompanied by an original quality certificate from the manufacturer.
h. Genuine "SKF, TIMKEN & FAG, NSK” are only accepted brands for supplied bearings and seals with original quality certificates from the manufacturer.
4. The vendor shall comply with the standards of SOW and be able to perform all additional work mentioned in SOW if required, as well as provide the required OEM parts.
5. A detailed repair procedure for each motor must be provided according to the OEM procedure ▪ NOV TDS Motor: 3ASP00073 pinion and break hub installation. ▪ Canrig TDS Motor: GE B20 TD Motor Checks and Pinion Installation Procedure – Canrig. ▪ Tesco TDS, procedure. If the procedures are not available from the bidder, Abraj can supply them during the tendering process. If any missing data, proper measurements of the received motor Pinion/Hub should be taken, and it should be reinstalled exactly as it was when the motor was originally received.
Compliance Criteria. The following GSS (International) Compliance Criteria and GSS (Botswana) Beneficiation Compliance Criteria and Relative Performance Criteria will apply to both a Sightholder and an Accredited Buyer in respect of supply from GSS (Botswana).
Compliance Criteria. No. Criteria Yes/No 1 Full Compliance proposed design 2 Onsite Training during commissioning and operation
Compliance Criteria. To initially qualify for the QPC, an RR/Agent needs only to satisfy (as evidenced by District Agent and Regional Agent endorsement of USPA&IRA Form 286) the following professional standards:
a. Maintain a professional office other than in the RR/Agent's home.
b. Prominently display a "USPA&IRA" logo sign at or near the office and/or on a main access road to the military installation(s) serviced.
c. List "USPA&IRA" in the white pages (only) of the local phone directory.
d. Not later than the end of the quarter during which the RR/Agent attends Phase V School, employ and utilize a professional Administrative Assistant at least 40 hours per week. (Note: A Client Contact Specialist may be utilized up to 20 hours per week toward satisfaction of this requirement.)
e. Obtain prior approval from the Regional (or Home) Office of any written sales proposal and of all sales made, and provide the original of every fully or partially completed Confidential Check List and Program Worksheet to the office providing that approval.
f. Maintain adequate client files and otherwise fully cooperate with, and participate in, the USPA&IRA client service system.
g. Make proper and timely delivery of all insurance policies.
Compliance Criteria. To avoid a transfer of funds under the interim final rule, a State must meet the following basic elements:
Compliance Criteria. 1. Workshop facility must have IECex certification for Exd motors overhaul and repair
2. Workshop facility must have ISO 9001 certificate, AEMT & EASA membership certificate.
3. Workshop should comply with IEEE, IEC, ISO, ANSI & EASA standards related to AC motors repair and overhaul, as illustrated in “Acceptance criteria”
a. For EX motors overhaul & repair, follow IEC 60079-19:2019 standards.
b. For the repair and rewinding of AC motors, follow IEEE-STD-1068-2015 standards.
c. For testing winding insulation resistance, follow IEEE-STD-43-2000(R2006) standards.
d. For repair of rotating electrical apparatus, follow, IEC 60034, EASA-STD-AR100-2020 standards.
e. For winding Surge test, follow IEEE-STD-522-2004 standards
f. For rotor dynamic balancing, balance on Grade 2.5 or higher, As per ISO 21940-11 standards.
g. For Motors winding insulation class, follow original insulation class as per NEMA & IEC-60034-1 standards.
h. Copper used in rewinding should be accompanied with original quality certificate from manufacturer.
i. Genuine “SKF, TIMKEN & FAG” are only accepted brands for supplied bearings and seals with original quality certificate from manufacturer
4. Abraj team to visit and audit workshop with the disqualification rights if major nonconformities found during the audit (audit during the tendering process)
