CONTROL CENTRE Sample Clauses

CONTROL CENTRE. 11.7.1 The Control Centre shall be constructed and equipped with basic equipment and software/hardware system as mentioned in Schedule VI by the Authority. The Authority shall also be responsible to operate and maintain the equipment installed by it at the Control Centre either on its own or through a Third Party; 11.7.2 The Authority shall also share real-time ITS feed with the Operator, to enable Operator to optimize its performance.
AutoNDA by SimpleDocs
CONTROL CENTRE. A telephone-operated call centre operated by STARTRACK VEHICLE TRACKING or its nominee 24 hours per day, 7 days per week for the purpose of monitoring signals emitted from Equipment.
CONTROL CENTRE. 4.1 General functions Data categories: Access data (IP address, time of access, etc.), e-mail address, name (if provided), place (if provided), submitted rating (text and stars), transaction number, product purchased (if provided). Trusted Shops provides the User with various information via the Control Centre that is either personal or based on the processing of personal data. This includes, in particular, the analytics data described in Section 3.2 of this Appendix for the sending and receipt of review invites, the management of submitted review in the form of commenting on reviews or reporting reviews, as well as the configuration options for the sending of re- view invites and the publication time of reviews. If the User wishes to establish links between the Trusted Shops systems and its own systems or systems man- aged by the User (in particular, CRM or ticket systems), the User shall be responsible in this respect for all obli- gations arising from the GDPR within the scope of its joint controllership with Trusted Shops. In particular, it must ensure that all necessary data protection agreements are in place when it makes use of a third-party pro- vider (e.g., for data processing), and that the necessary conditions for personal data transfers to a third country are met.
CONTROL CENTRE. A telephone-operated call centre operated by SELFTRACK or its nominee 24 hours per day, 7 days per week for the purpose of monitoring signals emitted from Equipment.
CONTROL CENTRE. Control Center to provide a snapshot of lighting status for a xxxx, zone, entire city

Related to CONTROL CENTRE

  • Control Area An electric power system or combination of electric power systems to which a common automatic generation control scheme is applied in order to: (1) match, at all times, the power output of the generators within the electric power system(s) and capacity and energy purchased from entities outside the electric power system(s), with the load within the electric power system(s); (2) maintain scheduled interchange with other Control Areas, within the limits of Good Utility Practice; (3) maintain the frequency of the electric power system(s) within reasonable limits in accordance with Good Utility Practice; and (4) provide sufficient generating capacity to maintain operating reserves in accordance with Good Utility Practice.

  • Security Systems The Service may not be compatible with security systems. You may be required to maintain a telephone connection through your local exchange carrier in order to use any alarm monitoring functions for any security system installed in your home or business. You are responsible for contacting the alarm monitoring company to test the compatibility of any alarm monitoring or security system with the Service.

  • Traffic Management 9.2.1 During the Operating Period, Developer shall be responsible for the general management of traffic on the Project. Developer shall manage traffic so as to preserve and protect safety of traffic on the Project and Related Transportation Facilities and, to the maximum extent practicable, to avoid disruption, interruption or other adverse effects on traffic flow, throughput or level of service on the Project and Related Transportation Facilities. Developer shall conduct traffic management in accordance with all applicable Technical Provisions, Technical Documents, Laws and Governmental Approvals, and in accordance with the Traffic Management Plan. 9.2.2 Developer shall prepare and submit to TxDOT and the Independent Engineer for TxDOT approval a Traffic Management Plan for managing traffic on the Project and Related Transportation Facilities after the commencement of traffic operations on any portion of the Project, addressing (a) orderly and safe movement and diversion of traffic on Related Transportation Facilities during Project construction, (b) orderly and safe movement of traffic on the Project and (c) orderly and safe diversion of traffic on the Project and Related Transportation Facilities necessary in connection with field maintenance and repair work or Renewal Work or in response to Incidents, Emergencies and lane closures. Developer shall prepare the Traffic Management Plan according to the schedule set forth in the Technical Provisions. The Traffic Management Plan shall comply with the Technical Provisions and Technical Documents concerning traffic management and traffic operations. Developer shall carry out all traffic management during the Term in accordance with the approved Traffic Management Plan. 9.2.3 Developer shall implement the Traffic Management Plan to promote safe and efficient operation of the Project and Related Transportation Facilities at all times during the course of any construction or operation of the Project and during the Utility Adjustment Work. 9.2.4 TxDOT shall have at all times, without obligation or liability to Developer, the right 9.2.4.1 Issue Directive Letters to Developer regarding traffic management 9.2.4.2 Provide on the Project, via message signs or other means consistent with Good Industry Practice, non-Discriminatory traveler and driver information, and other public information (e.g. amber alerts), provided that the means to disseminate such information does not materially interfere with the functioning of the ETCS.

  • Remote Terminal Unit Prior to the Initial Synchronization Date of the Large Generating Facility, a Remote Terminal Unit, or equivalent data collection and transfer equipment acceptable to the Parties, shall be installed by Developer, or by Connecting Transmission Owner at Developer’s expense, to gather accumulated and instantaneous data to be telemetered to the location(s) designated by Connecting Transmission Owner and NYISO through use of a dedicated point-to-point data circuit(s) as indicated in Article 8. 1. The communication protocol for the data circuit(s) shall be specified by Connecting Transmission Owner and NYISO. Instantaneous bi-directional analog real power and reactive power flow information must be telemetered directly to the location(s) specified by Connecting Transmission Owner and NYISO. Each Party will promptly advise the appropriate other Party if it detects or otherwise learns of any metering, telemetry or communications equipment errors or malfunctions that require the attention and/or correction by that other Party. The Party owning such equipment shall correct such error or malfunction as soon as reasonably feasible.

  • Relationship Management LAUSD expects Contractors and their Representatives to ensure that their business dealings with and/or on behalf of LAUSD are conducted in a manner that is above reproach.

  • Security System The site and the Work area may be protected by limited access security systems. An initial access code number will be issued to the Contractor by the County. Thereafter, all costs for changing the access code due to changes in personnel or required substitution of contracts shall be paid by the Contractor and may be deducted from payments due or to become due to the Contractor. Furthermore, any alarms originating from the Contractor’s operations shall also be paid by the Contractor and may be deducted from payments due or to become due to the Contractor.

  • Account Management 15.1 The Contractor is required to provide a dedicated Strategic Account Manager who will be the main point of contact for the Authority. The Strategic Account Manager will:  Attend quarterly, or as otherwise agreed, review meetings with the Authority, in person at the Authority’s premises or other locations as determined by the Authority  Attend regular catch-up meetings with the Authority, in person or by telephone/videoconference  Resolve any on-going operational issues which have not been resolved by the Contractor or Account Manager(s) and therefore require escalation  Ensure that the costs involved in delivering the Framework are as low as possible, whilst always meeting the required standards of service and quality. 15.2 The Contractor is also required to provide a dedicated Account Manager for every Framework Public Body using the Framework, if required by the Framework Public Body. The service to be provided will be agreed with each Framework Public Body and may include:  regular review meetings, which may be in person at the Framework Public Bodies’ premises, by video-conference, webinar or telephone  Regular catch-up meetings/telephone calls to discuss current and on-going issues  Work with the Framework Public Bodies Contract Manager to resolve any on-going operational issues  Work with the Framework Public Body ’s Contract Manager to pro-actively introduce initiatives to:  Create efficiencies in processes  Improve the environmental performance of the contract. 15.3 It is expected that end users will contact the Contractor in the first instance to resolve any operational issues. The Account Manager will act as a point of escalation to be contacted either by end users or by the Framework Public Body’s Contract Manager should there be issues that the Contractor needs to resolve. 15.4 Further details of the roles and responsibilities of the Contractor, Authority and Framework Public Bodies are provided in Schedule 4 – Management Arrangements

  • Infrastructure Infrastructure serves as the foundation and building blocks of an integrated IT solution. It is the hardware which supports Application Services (C.3.2) and IT Management Services (C.3.3); the software and services which enable that hardware to function; and the hardware, software, and services which allow for secure communication and interoperability between all business and application service components. Infrastructure services facilitate the development and maintenance of critical IT infrastructures required to support Federal government business operations. This section includes the technical framework components that make up integrated IT solutions. One or any combination of these components may be used to deliver IT solutions intended to perform a wide array of functions which allow agencies to deliver services to their customers (or users), whether internal or external, in an efficient and effective manner. Infrastructure includes hardware, software, licensing, technical support, and warranty services from third party sources, as well as technological refreshment and enhancements for that hardware and software. This section is aligned with the FEA/DoDEA Technical Reference Model (TRM) which describes these components using a vocabulary that is common throughout the entire Federal government. A detailed review of the TRM is provided in Section J, Attachment 5. Infrastructure includes complete life cycle support for all hardware, software, and services represented above, including planning, analysis, research and development, design, development, integration and testing, implementation, operations and maintenance, information assurance, and final disposition of these components. The services also include administration and help desk functions necessary to support the IT infrastructure (e.g., desktop support, network administration). Infrastructure components of an integrated IT solution can be categorized as follows:

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Science The content in the sequence of BSC 1010C and BSC 1011C is comparable to the standards for Biology 1 and therefore if both are completed may be used as preparation for the associated EOC.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!