Demolition of Existing Structures Sample Clauses

Demolition of Existing Structures. (1) The Contractor shall be provided the site areas free of legal encumbrances to access, fencing and the undertaking of the Works. The Works shall include the demolition of all structures necessary for the construction of the station, subway and ancillary structures required by the Agreement. The structures to be demolished include buildings, boundary walls, water sumps, water xxxxx, bus stops etc. (2) The Contractor shall be responsible for obtaining the necessary permits and approvals for undertaking the demolition works. These will require the Contractor to undertake a structural inspection of all structures and prepare a demolition method statement. This report should detail the protective hoarding works required prior to the commencement of demolition, the sequence of demolition and any temporary strengthening/protective works required to be added to the structures during the demolition. The Contractor should pay particular attention to the demolition of cantilever structures. (3) The Contractor shall ensure that all utilities, drainage and sewerage are properly disconnected before commencing demolition. (4) Foundations and underground structures of the existing structures should be broken down to 2m below ground level, and voids under this level are to be filled with suitable compacted material.
AutoNDA by SimpleDocs
Demolition of Existing Structures. The contractor shall be required to take special precaution and care in connection with demolition of existing structures. The procedure for doing such work, including need of and plans for temporary falsework, shall first be approved by Railroad Engineer before work is performed, but such approval shall not relieve the contractor from liability. Before submission of plans to the Railroad Engineer for approval, the Engineer will first review such plans.
Demolition of Existing Structures. By signing this Agreement, the Township agrees that upon proper application by Developer the Township shall approve the demolition of the existing residential structures designated for removal on the final PUD Plan and the removal of all appurtenances to those structures.
Demolition of Existing Structures. Contractor shall submit demolition plans to the Engineer for review and approval. Engineer will forward such plans to CCP as identified in the project agreement for CCP to review and approve. Demolition performed over or near CCP track will require proper protective shielding or other measures (as identified on the plans) as maybe required by CCP, and Contractor shall be required provide signed plans, signed by a Professional Engineer licensed in the State of Iowa, and schedule for review and approval by CCP. Such protective shielding or measures shall be designed for immediate removal by Contractor whenever instructed to do so by CCP. Demolition shall not be undertaken until CCP has advised Engineer of its approval of the plans and schedule, and Contractor has received the Engineer’s and CCP’s written approval of such demolition plans and schedule. All such reviews and approvals or rejections will be completed by the Engineer and CCP within 45 calendar days of receipt from Contractor.
Demolition of Existing Structures. As of the Commencement Date, Developer has completed the demolition of all structures on Parcel A. Developer agrees that it shall cause the demolition of the existing structures on Parcels B and C and shall properly dispose of all resulting debris by no later than the respective following dates; or such later date(s) as the parties shall mutually agree upon in writing: Structures on Parcel B: January 1, 2023 Structures on Parcel C: January 1, 2028 Developer shall complete the demolition and disposal in accordance with all local, State, and federal laws and requirements. Provided however, that if Developer does not demolish an existing structure before redevelopment of the Development Property, then the Developer shall be required to maintain those structures and the lots on which the structures are maintained in a condition consistent with all City ordinances and shall immediately take any corrective action upon the request of City Staff. Upon the completion of the demolition of all structures on a particular Parcel, Developer shall provide invoices, receipts, and other documentation related to the demolition that in the City’s sole discretion satisfactorily evidences the costs incurred by Developer in such demolition. Such documentation shall be used in computing the Aggregate Amount of the Economic Development Grants pursuant to Section 8.3. The Developer shall submit this documentation by no later than the October 15th immediately following the completion of the demolition of all buildings on a particular Parcel as part of the Developer’s Annual Certification (submitted pursuant to Section 6.7) in that year.
Demolition of Existing Structures. Etc. All structures, equipment, and other items owned by Arizona State University which are scheduled for removal shall remain the property of the University. The manner of dismantling, moving, storing or disposal shall be as directed by ASU's representative with the cost being borne by the Contractor.
Demolition of Existing Structures. As a condition to Close of Escrow, Seller will, at Seller’s sole expense and in compliance with all applicable laws and regulations (including without limitation all state, federal and local rules, regulations and laws relating to demolition of structures containing lead-based paint and asbestos): (i) demolish and remove all existing structures and improvements located on the Property, including without limitation all underground concrete building foundations, but excluding the three (3) concrete forging hammer foundations and two (2) smaller ring roller and unused press foundations previously installed by Seller located in the areas depicted in Exhibit C; provided however, Seller shall be obligated to remove and dispose of all concrete from ground level down to eight (8) feet below ground level, (ii) dispose of all debris, materials and contaminated soil in accordance with all applicable laws, and (iii) cap off all utilities. [under review]
AutoNDA by SimpleDocs
Demolition of Existing Structures. All services associated with the demolition of the existing building(s) on the site.
Demolition of Existing Structures. Notwithstanding anything to the contrary in Condition of Approval #27, the parties hereby agree that within six (6) months of the Closing Date the Developer shall demolition all vacant building(s) and cap any utilities and return the site to a "pre-development condition" on the Dealership Development Parcel.
Demolition of Existing Structures. Within sixty days following the approval of the final plans, Tenant will, at its own cost and risk, demolish, remove, and dispose of all existing buildings and structures that may be on the Land, which buildings and structures are hereby granted to Tenant on such removal, and prepare the Land for construction of the Building contemplated herein. Tenant shall give Landlord a minimum of ten days' written notice of the date when it will commence removal of such buildings and structures.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!