DESIGN-BUILDER’S OBLIGATIONS Sample Clauses

DESIGN-BUILDER’S OBLIGATIONS. 4. The System requires a broadband connection with the Internet (e.g., at a minimum, T1, cable modem, or DSL) for effective use. Design-Builder must furnish its own hardware and software, including, but not limited to, personal computers, peripheral software, virus protection software and high-speed document scanners. All written communication and document transmittal from Design-Builder to the Commission will occur via the System. In the event that hand signatures and/or stamps are required for a document, unless otherwise directed by the Authorized Commission Representative, the transmittal of such document shall be made simultaneously via the System and hard copy; hard copy shall be transmitted as required by the Contract Documents. Signed and/or stamped documents must then be scanned and uploaded to the System. 5. Design-Builder shall be solely responsible for its use of the System, as well as use of the System by its Subcontractors and Suppliers.
AutoNDA by SimpleDocs
DESIGN-BUILDER’S OBLIGATIONS. Design-Builder can and must perform, or cause to be performed, the Work in strict accordance with the provisions and requirements of this Contract. c. Except for the contents of this Contract, no representation, statement or promise, oral or written, or of any kind whatsoever, by the Commission, its officials, agents, representatives or employees, has induced the Design-Builder to submit a bid or has been relied upon by the Design-Builder, including any reference to (i) the meaning, correctness, suitability or completeness of any provisions or requirements of this Contract; (ii) the nature, existence, or location of materials, structures, obstructions, utilities or conditions, surface or subsurface, which may be encountered at or on the Site; (iii) the nature, quantity, quality or size of any materials, equipment, labor and other facilities needed for the performance of this Contract; (iv) the general conditions which may in any way affect this Contract or its performance; (v) the compensation provisions of the Contract; or (vi) any other matter. d. The Design-Builder was given ample opportunity and time to review the Contract Documents prior to submittal of its bid. e. The Design-Builder acknowledges and understands that the Commission materially relied upon the Design- Builder’s bid in its selection of the Design-Builder to perform the Work. f. Design-Builder’s submittal of its bid establishes that the Design-Builder, in preparing and submitting its bid on which this Contract is based, has complied with and given full consideration to the following bidding requirements: (1) The Design-Builder did obtain for bidding purposes copies of the complete Contract Documents as identified in the advertisement for bids and all addenda issued by the Commission and has become familiar with the same and all Contract requirements and conditions described therein. (2) The Design-Builder has clarified to its satisfaction and complete understanding and acceptance any doubt as to the true meaning and intent of any part or parts of the specifications and plans or other portions of the Contract Documents. (3) The Design-Builder waives any claim for relief because of alleged mistakes or omissions in its bid and that the Design-Builder will be held strictly to its bid as presented. 2. The Design-Builder has the capability and financial resources to perform all of the provisions and requirements of this Contract. 3. The Design-Builder must perform all of its obligations under t...
DESIGN-BUILDER’S OBLIGATIONS. (1) The Design-Builder understands and agrees that time is of the essence in closing out the Work of this Contract. Upon Substantial Completion of the Work, the Punch List will be transmitted to the Design-Builder from the Commission. The Design-Builder agrees to begin performance of Punch List Work immediately after receipt of the Punch List. (2) Failure of the Design-Builder or its Subcontractors to begin the Punch List Work within 3 business Days after receipt of the Punch List will be construed as failure to prosecute the Work of the Contract. (3) Punch List Work will be continuously prosecuted once begun and completed within the period set forth in the Punch List by the Commission Representative. The Commission Representative shall establish the period for completion of the Punch List Work after consultation with the Design-Builder. The period established by the Commission Representative will be based on the Commission Representative’s reasonable, good faith estimate of the time necessary for the Design-Builder to complete the Punch List Work. b. Final Completion and Acceptance of the Work (1) When the Design-Builder deems the Work, including all Punch List Work, to be complete, the Design-Builder must notify the Commission Representative in writing that the Work will be ready for an inspection and/or test on a date specified by the Design-Builder. Such notice is to be given at least 5 Days in advance of said date. If the Commission Representative concurs that the Work will be ready for inspection or testing on the date given, , the Commission will make such inspection within a reasonable period of time. The scheduling of the inspection to determine whether the Work is complete does not relieve the Design-Builder of its responsibilities under the Contract Documents. The Design-Builder must cooperate in all respects in the scheduling and performance of the inspection. Upon inspection, the Commission will determine if Final Completion and Acceptance of the Work has been achieved and will issue a written notice to the Design- Builder confirming the Final Completion and Acceptance of the Work. (2) No action of the Commission, the Commission Representative, the Architect, or their respective Executive Directors, board members, officers, employees, or agents is to be construed as accepting Work done or material furnished in the performance of this Contract, which Work or materials are not in accordance with those specified and required by the Contract. The ...
DESIGN-BUILDER’S OBLIGATIONS. (1) The Design-Builder understands and agrees that time is of the essence in closing out the Work of this Contract. Upon Substantial Completion of the Work, the Punch List will be transmitted to the Design-Builder from the Commission. The Design-Builder agrees to begin performance of Punch List Work immediately after receipt of the Punch List. (2) Failure of the Design-Builder or its Subcontractors to begin the Punch List Work within 3 business Days after receipt of the Punch List will be construed as failure to prosecute the Work of the Contract. (3) Punch List Work will be continuously prosecuted once begun and completed within the period set forth in the Punch List by the Commission Representative. The Commission Representative shall establish the period for completion of the Punch List Work after consultation with the Design-Builder. The period established by the Commission Representative will be based on the Commission Representative’s reasonable, good faith estimate of the time necessary for the Design-Builder to complete the Punch List Work.
DESIGN-BUILDER’S OBLIGATIONS 

Related to DESIGN-BUILDER’S OBLIGATIONS

  • Owner’s Obligations 5.1 The Owners shall pay all sums due to the Managers punctually in accordance with the terms of this Agreement. 5.2 Where the Managers are providing Technical Management in accordance with sub-clause 3.2, the Owners shall: (i) procure that all officers and ratings supplied by them or on their behalf comply with the requirements of STCW 95; (ii) instruct such officers and ratings to obey all reasonable orders of the Managers in connection with the operation of the Managers’ safety management system. 5.3 Where the Managers are not providing Technical Management in accordance with sub-clause 3.2, the Owners shall procure that the requirements of the law of the flag of the Vessel are satisfied and that they, or such other entity as may be appointed by them and identified to the Managers, shall be deemed to be the “Company” as defined by the ISM Code assuming the responsibility for the operation of the Vessel and taking over the duties and responsibilities imposed by the ISM Code when applicable.

  • HIRER’S OBLIGATIONS 10.1 The Hirer must comply with and shall procure that its officers, agents, employees and Delegates comply with: (a) all applicable laws, statutes and regulations from time to time in force in relation to the hire and use of the Facilities and attendance at the Venue; (b) any health and safety regulations, and security and other reasonable requirements that apply to the Venue and/or the Room and have been communicated to the Hirer; (c) any instructions from any member of wallacespace staff in the event of a fire or other emergency or in respect of any other security or health and safety matters. 10.2 The Hirer shall not hold itself out to be connected to wallacespace, nor, without the prior written consent of wallacespace, use the wallacespace name or logos on any promotional or other materials. 10.3 The Hirer will not affix any poster, notice, placard, sign or other item to any part of the Venue or Room nor erect any display or stand unless wallacespace’s prior written agreement has been obtained. 10.4 The Hirer will be responsible for keeping proper order and for ensuring that all Delegates behave in an appropriate manner. This includes the treatment of wallacespace staff with respect, not causing damage to the Venue or Equipment, not introducing any malicious or technologically harmful material to wallacespace’s tech systems and not using the tech systems for any unlawful purpose. wallacespace reserves the right to exclude any Delegate from the Venue who does not behave in such a manner. 10.5 Externally purchased or produced food and drink may not be brought into the Venue for consumption. In particular, other than that supplied by wallacespace, wines, spirits or other beverages are not permitted to be brought into the Venue for consumption unless prior written consent has been given by wallacespace and wallacespace’s “corkage” charges from time to time shall be added to, and payable with, the Price. 10.6 The Hirer shall indemnify wallacespace from and against all claims, demands, actions, costs, expenses, damages, penalties or proceedings arising out of or connected with any loss or theft of or damage to any property of any person at the Venue, damage to the Venue or Facilities, or any death or injury of any person at the Venue as a result of any act or omission of the Hirer or its officers, employees, agents or Delegates or any other person on the Venue with the actual or implied authority of any of them. 10.7 The Hirer shall maintain in force, with a reputable insurance company, public liability and any other insurance at an amount not less than £2,000,000 to cover the liabilities that may arise under or in connection with the Agreement and shall produce to wallacespace on request both the insurance certificate giving details of cover and the receipt for the current year's premium in respect of each insurance.

  • Provider’s Obligations 9.1 The Provider shall: 9.1.1 Ensure or procure the Availability of the DER and perform the Flexibility Services in compliance with this Agreement and all Applicable Laws, Statutory Requirements and Good Industry Practice; 9.1.2 own and/or manage the DER during the Term and shall ensure that all technical, communication and data provision requirements set out in Schedule 4 and Schedule 6 are complied with at all times; 9.1.3 provide the Flexibility Services in accordance with all UK health, safety and environment legislation and approved codes of practice; 9.1.4 remedy any defect of the Flexibility Services with Good Industry Practice and to the satisfaction of the Company; 9.1.5 act diligently and in good faith in all of its dealings with the Company; 9.1.6 ensure that it is available at all times on reasonable notice to provide such assistance or information as the Company may reasonably require in connection with the Flexibility Services; 9.1.7 disclose the existence of any agreement or arrangement the Provider may have in respect of the DER that provides Flexibility Services under this Agreement that could reasonably impact Availability of the DER or the ability of the Provider to perform its obligations under this Agreement; 9.1.8 at the request of the Company, make available to the Company information in relation to the metering equipment at the DER, including but not limited to a manufacturers test certificate, single line diagram, and technical information from the manufacturer of the meter, which sets out the typical errors of the meter; 9.1.9 permit and grant (or procure) free and unrestricted rights of access to and over and egress from the Site to the Company and/or its agents or sub-contractors (upon reasonable notice) as the Company may reasonably require in order to inspect and test the DER, or to install, maintain, replace or remove communication equipment belonging to the Company in relation to the provision of flexibility services.

  • Managers’ Obligations 4.1 The Managers undertake to use their best endeavours to provide the agreed Management Services as agents for and on behalf of the Owners in accordance with sound ship management practice and to protect and promote the interests of the Owners in all matters relating to the provision of services hereunder. Provided, however, that the Managers in the performance of their management responsibilities under this Agreement shall be entitled to have regard to their overall responsibility in relation to all vessels as may from time to time be entrusted to their management and in particular, but without prejudice to the generality of the foregoing, the Managers shall be entitled to allocate available supplies, manpower and services in such manner as in the prevailing circumstances the Managers in their absolute discretion consider to be fair and reasonable. 4.2 Where the Managers are providing Technical Management in accordance with sub-clause 3.2, they shall procure that the requirements of the law of the flag of the Vessel are satisfied and they shall in particular be deemed to be the “Company” as defined by the ISM Code, assuming the responsibility for the operation of the Vessel and taking over the duties and responsibilities imposed by the ISM Code when applicable.

  • Customer’s Obligations 7.1 The Customer shall: (a) comply with: (i) the terms of the Connection Procedures when connecting Authorised Users to the Services; (ii) such other reasonable procedures relating to the use of the Smart Hubs and/or the Services as Xxxxxxxx shall notify to the Customer from time to time; (b) provide Xxxxxxxx with: (i) all necessary co-operation in relation to these terms and conditions; and (ii) all necessary access to such information as may be required by Xxxxxxxx; in order to provide the Services, including but not limited to Customer Data, security access information and configuration services; (c) comply with all applicable laws and regulations with respect to its activities under the Agreement; (d) not use or permit the use of the Services to transmit data that infringes any applicable laws, regulations or third party rights; (e) ensure that the Authorised Users use the Services, the Software and the Documentation in accordance with these terms and conditions and shall be responsible for any Authorised User’s breach of these terms and conditions; (f) obtain and shall maintain all necessary licences, consents, and permissions necessary for Xxxxxxxx, its contractors and agents to perform their obligations under the Agreement, including without limitation the Services; (g) ensure that its network and systems comply with the relevant specifications provided by Xxxxxxxx from time to time. In particular, the Customer shall promptly install and implement any updates, upgrades, modifications and enhancements to the Software provided to it under the Agreement and acknowledges that any failure to do so could lead to security risks in its use of the Services; (h) comply with such reasonable instructions that may be given to it by Xxxxxxxx which are necessary for reasons of: (i) health and safety; (ii) quality of the Services; (iii) an emergency; or (iv) ensuring compliance by Xxxxxxxx and/or the SIM Card Provider with relevant and applicable EU and/or UK legislation or regulations; (i) take reasonable steps to ensure that any end users agree to allow the installation and use of equipment required for the receipt of the Services at their site(s) and prepare and provide a suitable place, conditions and connection points required for such equipment and electricity at such site(s) in accordance with Xxxxxxxx’x reasonable instructions, if any; (j) follow any reasonable instructions given to it by Xxxxxxxx (including testing with the latest commercially available virus detection software) to ensure that any software used with or in connection with the Services is not infected by any or any other types of disruptive, destructive or nuisance programs; (k) report faults or requests for support only to Xxxxxxxx’x support team at the number or email address provided from time to time for such purpose, providing such information as Xxxxxxxx shall reasonably require to assist it in remedying such faults or providing support in accordance with these terms and conditions; (l) be solely responsible for maintaining the security of any equipment connected to the Services; and (m) be solely responsible for procuring and maintaining its network connections and telecommunications links from its systems to the Services, and all problems, conditions, delays, delivery failures and all other loss or damage arising from or relating to the Customer's network connections or telecommunications links or caused by the internet. 7.2 The Customer acknowledges that Xxxxxxxx shall provide some elements of the Services (including, for the avoidance of doubt, the provision of SIM Cards) under standard terms provided by relevant third parties. The Customer agrees to be bound by such terms and to ensure that the Authorised Users are bound under similar obligations. In particular, the Customer agrees to: (a) comply with the SIM Card End-User Terms (as the same may be amended from time to time by Xxxxxxxx giving no less than 30 days’ notice to the Customer); (b) comply with the Cloud Service End-User Terms (as the same may be amended from time to time by Xxxxxxxx giving no less than 30 days’ notice to the Customer); and (c) indemnify Xxxxxxxx against all such additional fees, costs and charges as Xxxxxxxx may incur from a relevant third party by reason of the Customer’s termination of the Agreement or early cancellation of a SIM Card (including, for the avoidance of doubt, any cancellation charges or compensation payable by Xxxxxxxx to the relevant third party).

  • SUPPLIER’S OBLIGATIONS 4.2.1 The Supplier shall be responsible for implementing all the necessary resources for the performance of its obligations under the Contract, with the exception of those specifically mentionedin the Contractas beingunder the responsibility of the Purchaser. The Supplier shall haveall of thematerials andtoolsneededfor theperformanceof the Contractandshall allocate qualified staff in sufficient numbers to perform the Contract within the contractual deadline. The Supplier shall ensureappropriatepersonneltraining andqualification andsubmitanyproof relating to such qualification upon Purchaser’s request. Within seven (7) days, at the latest, of the Contract coming into force, the Supplier shall appoint a staff member as aprojectmanager and shall inform the Purchaser accordingly. The project manager shall plan, coordinate and monitor all the Supply’sneedsin compliancewith the Contractandthe Good Industry Practices andshall be the Supplier’s contact person for the Purchaser. 4.2.2 The Supplier shall request from the Purchaser in a timely manner, any approvals and instructions needed for the correct performance of the Contract. If applicable, the Purchaser shall grant access to the site where the Supply is to be performed (the “Site”) and /or make available to the Supplier the materials and/or perform the works identified in the Contract. 4.2.3 The Supplier shall promptly remedy or shall ensure that its subcontractors promptly remedy any defects relating to the Supply noted during the abovementioned visits as well as any defect notified to it by the Purchaser concerning its performance. 4.2.4 The Supplier shall ensure that the Supply provided are fit for the purposes that may reasonablybeinferred from the Contractandinaccordancewith the timetableforperformance defined in the Contract. In any event the Supplier commitshimself toachieveperformance and results stipulated in the Contract. The performance deadlinesmay only be extended or reduced through an amendment to the Contract, in accordance with the provisions of Article 5.1. The Supply shall be delivered in a state of full completion with the complete Documentation associated therewith as well as all instructions, recommendations and other indications necessary in order for them to be used correctly and under the appropriate safety conditions. “Documentation” shall mean any operation and maintenance manuals, drawings, calculations, technical data, logic diagrams, progress reports, quality documentation, conformity certificates, test reports, bill of lading, certificates of origin, export control classification list number as per any applicable export regulation - such as (i) the European Council Regulation 428/2009 (as amended), (ii) the U.S. Export Administration Regulations (“EAR”), (iii) percentage of U.S. origin content, (iv) U.S. Export Control Classification Number (“ECCN”), (v) U.S. Munitions List category (“USML”),(vi) (if applicable) export authorizations and licenses, and/or (vii) Harmonized Tariff Code - and any such other documents required under the Contract and/or applicable laws. The Supplier shall also furnish such programme of design, manufacture and delivery as the Purchaser may reasonably require. If so required by the Purchaser, the Supplier shall submit any such Documentation to the Purchaser with sufficient time for review and approval. Where the Documentation provided by the Supplier is not compliant with Purchaser’s contractual requirements, the Supplier must make the necessary modifications, and indemnify the Purchaser for any costs, liabilities or penalties incurred by the Purchaser due to the delays or non-compliance in Documentation delivered by the Supplier and shall not be entitled to an adjustment of the delivery schedule in case of any revision.

  • Service Provider’s Obligations 3.1 The Service Provider shall perform its obligations under this Agreement in a reasonable and timely manner in accordance with the provisions of this Agreement. 3.2 The Service Provider shall provide the Client with such information and advice in connection with the Services and the provision thereof as the Client may, from time to time, reasonably require both before and during the provision of the Services. 3.3 The Service Provider shall use reasonable endeavours to keep the Client informed of any special requirements (including, but not limited to, legislative requirements) applicable to the rendering of the Services. To the extent necessary and appropriate, the Service Provider shall promptly take steps to comply with any such requirements. These steps shall not otherwise alter this Agreement in any way, subject to each Party’s right to request a meeting to review such changes.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!