Design Control a. Design activities are not normally within the Design-Builder's work scope. This element must be considered, however, if any design activity is contemplated. If no design activity is contemplated, the CQP should include a statement of non-applicability of this element.
Design Control. Seller's approval of the design and layout of all aspects of the Improvements to be constructed on the Resort Property.
Design Control. 5.2.1 The formulation of the product shall be the responsibility of the Project Manager. The Project manager shall work with Business Development and Field Technicians to ensure the trials of new product are conducted and documented per released procedures.
Design Control. Design outputs · Design review · Design verification · Design validation · Design transfer · Design change · Design history file
Design Control. 20 14. Tooling Ownership and Payment .................... 22 15.
Design Control. ACCIN is responsible for the finished medical device and the components provided by SUPPLIER. SUPPLIER shall make no change in any design feature without prior written approval of ACCIN Engineering and Quality Assurance. Changes in design will be communicated to SUPPLIER by ACCIN through the applicable drawing, procurement specification and/or purchase order. Supplier Agreement
Design Control. (a) Contractor shall document feasibility, outline and detailed designs as appropriate to the circumstances. All designs, drawing and calculations shall be checked and shall be traceable to information sources, assumptions choices made, designer and verifier.
Design Control. 4.1 HHI shall not make any changes in the specifications, design, manufacture or composition of any Products ordered hereunder without the prior written approval of Thomas.
Design Control. Seller shall implement in-house design control activities to be performed in accordance with Seller's documented processes and procedures where applicable. Design input requirements are identified and recorded. The documented design output shall contain or reference to acceptance criteria and product characteristics critical to the proper functioning of the CIH Transponder. Design validation activities, to the extent required will assure that the product meets requirements under specified operating environments. Certification of the successful completion of each monitored formal test process shall also be supported by the QA.
Design Control. Documented procedures and measures shall be established and maintained to control and verify the design of the product in order to ensure that the specified requirements are met. These measures shall include, as appropriate, design reviews, design verification, and control of design changes.