Design Framework Sample Clauses

Design Framework. The Development Manager acknowledges that it has received the Predesign Report and shall, forthwith following the Effective Date, establish, supervise, administer and manage a Project design consultation team to further the design consultation process and enhance the design criteria, concept, outline specifications, and concept drawings for the Project as may be necessary or desirable (collectively, and as amended from time to time, the “Design Framework”), presented in the form of a revised design report, completed at the pre-design stage and updated during schematic design, design development, contract documentation and procurement stages, using commercially reasonable efforts to take into account any reports submitted to the Project Committee by The City in respect of the results of any and all community engagement programs previously conducted in respect of the Community Rink or the Event Centre. Such Project design consultation team shall meet regularly and shall diligently and expeditiously establish such Design Framework as soon as reasonably possible following the Effective Date. The Development Manager will coordinate, schedule and conduct design consultation meetings, which will include design presentation meetings, the provision of verbal and/or written feedback by the design consultation team, engagement, design workshops and other design matters. The Design Framework, design reports and any amendments thereto from time to time, shall be subject to the Approval of the Project Committee. Notwithstanding any other provision of this Agreement, the Design Framework shall, to the extent practicable, be based upon the Previous Design Development Report, with such changes as may be Approved by the Project Committee (including, for certainty, in respect of, inter alia: the increased size of the Lands; the relocation of utilities; the addition of an indoor gathering space; an increase in the size of the parking garage from 200 to 500 spaces; the addition of the Community Rink and LEED certification).
AutoNDA by SimpleDocs

Related to Design Framework

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • Design Criteria and Standards All Projects/Services shall be performed in accordance with instructions, criteria and standards set forth by the Director.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Design Standards Most recent edition of the “Owner’s Design Standards,” including any partial updates as may be directed by the Owner.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • Design Criteria A/E shall prepare all work in accordance with the latest version of applicable County’s procedures, specifications, manuals, guidelines, standard drawings, and standard specifications. A/E shall prepare each Plans, Specifications, and Estimates (PS&E) package in a form suitable for letting through County’s construction contract bidding and awarding process.

  • Design XXX XXX XXXXX Plan and Aligned Budget

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. • All Basic Services set forth in the Agreement. • All Basic Services set forth in the Agreement. • All Basic Services set forth in the Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!