Design Funding Sample Clauses

Design Funding. If funding from PDC for design of the Phase 2 Greenway pursuant to this Section has not been identified and encumbered at the time ZRZ desires to design the Phase 2 Greenway Design Triggering Project, then ZRZ may, in its sole and absolute discretion, design the entire Phase 2 Greenway consistent with the above terms in this section including mutual agreement on final design. In such event, ZRZ shall be reimbursed by PDC for PDC’s share of such costs as per Section 7.3.3 below, from cash or cash equivalent, subject to the preconditions that (i) PDC and ZRZ shall agree in writing to the terms and timeline for reimbursement by PDC to ZRZ in advance of any costs being incurred, and (ii) PDC is not obligated to reimburse ZRZ for any costs incurred prior to both Parties’ execution of a written agreement on the terms and timeline of reimbursement.
AutoNDA by SimpleDocs
Design Funding. The County shall appropriate funding for the Schematic Design preparation, based on a percentage of anticipated costs, related to the estimated design and permitting costs outlined in the previously completed Joint Master Plan, in the attached document titled 2019.03.25 CC#3 Estimate-Option 11-Split. This percentage is to be 40.75% of the total Schematic Design fee. The County’s portion of the Schematic Design Fee shall be due regardless of whether the County proceeds with the Project. The total anticipated cost for the Schematic Design phase is $375,000 for which the County will be responsible for up to $152,812.50 (40.75%). County portion included in prior and current Fiscal Year CIP (FY20).
Design Funding. The Town shall appropriate funding for the Schematic Design preparation, based on a percentage of anticipated costs, related to the estimated design and permitting costs outlined in the previously completed Joint Master Plan, in the attached document titled 2019.03.25 CC#3 Estimate-Option 11-Split. This percentage is to be 59.25% of the total Schematic Design fee. The Town’s portion of the Schematic Design Fee shall be due regardless of whether the Town proceeds with the Project. The total anticipated cost for the Schematic Design phase is $375,000 for which the Town will be responsible for up to $222,187.50 (59.25%). Town portion was appropriated in its 2019 annual budget. The Town shall make payment to the County for the Town’s $222,187.50 share of the project cost within 60 days of notice from the County that the contract with the consultant has been signed.
Design Funding. The County shall appropriate funding for the Joint Master Plan preparation in an amount not to exceed $50,000.00.
Design Funding. The Town shall appropriate funding for the Joint Master Plan preparation in an amount not to exceed $20,000.00.

Related to Design Funding

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. Bidding Phase • All Basic Services set forth in the Agreement. Construction Phase • All Basic Services set forth in the Agreement. Post-Construction • All Basic Services set forth in the Agreement.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Design-Builder The person or entity responsible for the proper completion of the activities described in the Contract Documents and who executes the Contract.

  • Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!