Design Fee. For the design services, including the Design Professional’s construction contract administration services, as described in Section 2, Parts 1 and 3 of the General Requirements, provided by Design Professional, Owner shall pay to Design Builder a Design Fee representing the gross profit relative to the design and construction contract administration services, in accordance with Section 4, Part 2 below.
Design Fee. The Design Fee component of the Design-Builder Fee shall in no event exceed the following amount: and No/100 DOLLARS ( $ .00)
Design Fee. The Contract Price includes a Design Fee of Insert Amount Dollars ($ ). The sole purpose of the Design Fee is to determine: (1) the compensation City is obligated to pay to Design-Builder under Article 15 of the General Conditions in the event the Agreement is terminated, for cause or convenience, prior to commencement of any physical construction at the Site; and (2) the amount that Design-Builder is entitled to pursuant to Article 10.3 of the General Conditions, to include in its Applications for Payment seeking progress payments for the design and construction portions of the Work.
Design Fee. The Port will retain an engineering firm to provide the design services necessary to connect the customer to the Port’s small diameter pressure sewer transmission line. The design fee will be paid by the customer based on actual costs; however, shall not exceed $5,000. The design fee shall be paid by the customer prior to proceeding with the construction phase.
Design Fee. If a developer wishes the District to design the system to be built, the developer shall pay to the District, in addition to the administrative fee, all expenses which the District incurs for its design services. At tender of this agreement, a deposit towards the design services shall be paid to the District. This deposit shall be $3,600.00, plus $4.25 per linear foot of water main to be installed, plus 10% of the estimated construction cost of all capital facilities other than water mains to be installed (e.g. pumps, reservoirs, xxxxx, and pressure reducing stations, etc.). This deposit shall be paid to the District on tender of this agreement. The amount of the deposit for design services is Prior to acceptance of the extension (see paragraph 14 of this agreement) the District will prepare an accounting of the total construction fee incurred. The difference between the total deposit and the construction fee shall be paid to the District prior to obtaining connection or service from the extension. If the total deposits exceed the construction fee, the District will reimburse the difference to the Developer.
Design Fee. We propose a Fixed Fee as follows based on the scope items described above. Houghton Beach Park Improvements Concept Design (10%) $37,662 TOTAL BASE FEE $37,662 Additional Consulting Services for the convenience of the City of Xxxxxxxx Surveying $25,080 Geotechnical Engineering $11,880 Environmental Consulting $41,744 TOTAL ADDITIONAL SERVICES FEE $78,704 Expenses $3,000 GRAND TOTAL $119,366 Xxxxx X. Xxxxxxxx, AIA Principal, Schemata Workshop Thank you again for inviting us to be part of these restroom replacement projects. Respectively Submitted, October 30, 2023 Xxxxx X. Xxxxxxxx, AIA Schemata Workshop, Inc. 0000 00xx Xxx Seattle, WA 98122 Civil Engineers Project: Houghton Beach Park Restroom Replacement AHBL No. 2230409.10/.20/.30/.40/.50 Subject: Revised Proposal for Civil and Structural Engineering, Land Use Planning, Landscape Architecture, and Land Surveying Services Dear Xxxxx: Thank you for the opportunity to submit this revised proposal for civil and structural engineering, land use planning, landscape architecture, and land surveying services for the Houghton Beach Park Restroom Replacement project. We understand that the project includes construction of a new restroom building at Houghton Beach Park located at 0000 Xxxx Xxxxxxxxxx Xxxxxxxxx xx Xxxxxxxx, Xxxxxxxxxx. Additionally, we understand that the site is already occupied with an existing restroom building, which will be demolished and removed as part of this project. The design will only progress to a 10% design submittal. Our scope of services is listed below. Civil Engineering – 2230409.10 Overarching assumptions guiding our scope include the following: • Improvements will include a new domestic water service for the site. • Existing sanitary sewer service may be reused for the site. • Existing utility mains surrounding the site have adequate capacity and will not require reconstruction of water, sewer, or storm main. • Road improvements to be limited to a pavement patch for connection of one water service and a half-street overlay limited to the patch location. • Site improvements will result in more than 5,000 square feet of new plus replaced impervious surface and will require a full stormwater review at the permitting phase. We understand the site is in a Level 1 flow control area and is a direct discharge area. Therefore, the project is flow control exempt. The project will be required to provide stormwater quality improvements if more than 5,000 square feet of new plus replaced imp...
Design Fee. For design services, the Design-Builder’s compensation shall not exceed $[ ] (the “Design Fee”).]
Design Fee. Licensee will pay to Licensor an additional fee of $100,000, due and payable on May 31, 2017 as payment for initial design services relating to the base development of the MJ App.
Design Fee. 1. At the stage of preliminary studies, 10% of the value set for design is paid after submitting the preliminary studies for the design and an initial estimate of the project cost to be approved by the First Party.
2. 40% of the fixed value of design, to be paid after the drawings are approved by (Etisalat - Civil Defense - Sharjah Electricity and Water Authority - Directorate Of Town Planning ﺔــــــــــــﻓﺎ� ﻦــــــــــــﻋ ﻻً وﺆــــــــــــﺴﻣ نﻮــــــــــــ��و مﺰـــــــــــــﺘﻠﻳ ﺎــــــــــــﻤﻛ ،ﺔﻴﻓﺎــــــــــــﺿإ بﺎــــــــــــﻌ�أ ﺔــــــــــــﻳأ نود ﻚــــــــــــﻟذ .نﺄﺸﻟا اﺬ�� ﺔﻘﻠﻌﺘﳌا ﺮﺋﺎﺴخ�او راﺮﺿﻷاو ىﺮﺧﻷا ﻒﻴﻟﺎ�ﺘﻟاو ﻒ�رﺎﺼﳌا ﻖﺋﺎـــــــــــﺛﻮﻟا ﺔـــــــــــﻓﺎ� ﺔﻣﻼـــــــــــﺳو ﺔﺤــــــــــــﺻ ﻦـــــــــــﻋ ﺔﻴﻟوﺆـــــــــــﺴﳌا ﻲ�ﺎـــــــــــﺜﻟا فﺮـــــــــــﻄﻟا ﻞـــــــــــﻤﺤﺘﻳ .5 ﻻو .ﮫــــــــــــﻠﺒﻗِ ﻦــــــــــــﻣ ﺎهﻤﻳﺪــــــــــــﻘﺗ وأ/و ﺎهداﺪــــــــــــﻋإ ﻢﺘــــــــــــﻳ ﻲـــــــــــــﺘﻟا تﺎــــــــــــﻧﺎﻴﺒﻟاو تﺎــــــــــــﻄﻄخ�او ﮫـــــــــﻗﺎﻔﺧإ ﻻو ،تﺎـــــــــﻄﻄخ�او ﻖﺋﺎـــــــــﺛﻮﻟا ﻚـــــــــﻠﺗ �ـــــــــ�ﻋ لوﻷا فﺮـــــــــﻄﻟا ﻖﻳﺪـــــــــﺼﺗ ﺮــــــــــﺒﺘﻌ� ﻦــــــــــﻣ ﻲ�ﺎــــــــــﺜﻟا فﺮـــــــــﻄﻟا ءﺎــــــــــﻔﻋإ ﺔـــــــــﺑﺎﺜﻤﺑ ،ﺎــــــــــ��ﻓ ��ــــــــــﺼﻘﺗ وأ ﺐـــــــــﻴﻋ يأ فﺎــــــــــﺸتﻛا �ـــــــــ� ﮫﺗﺎﻣاﺰـــــــــــﺘﻟاو ﮫــــــــــﻣﺎهﻣ ﻦــــــــــﻣ ﻚــــــــــﻟذ �ــــــــــ�ﻏ وأ ،ﺎــــــــــهﻠﻤﺤﺘﻳ ﻲـــــــــــﺘﻟا ﻢﻴﻤــــــــــﺼﺘﻟا تﺎﻴﻟوﺆــــــــــﺴﻣ .نﻮﻧﺎﻘﻟا وأ ﺪﻘﻌﻟا اﺬه ﺐﺟﻮﻤﺑ ﺎــــــــــــــــــــﻣ ﺔﻴﻟوﺆـــــــــــــــــــﺴﻣ لوﺎــــــــــــــــــــﻘﳌا ﻊـــــــــــــــــــﻣ ﻦﻣﺎـــــــــــــــــــﻀﺘﻟﺎﺑ ﻲ�ﺎــــــــــــــــــــﺜﻟا فﺮـــــــــــــــــــﻄﻟا ﻦﻤـــــــــــــــــــﻀﻳ .6 ﺐبـــــــــــــﺴ� ﺔــــــــــــﺘﺑﺎﺜﻟا تﺂــــــــــــﺸنﳌا �ــــــــــــ� ﻲــــــــــــئﺰﺟ وأ �ــــــــــــ�ﻛ مﺪــــــــــــ�� وأ ﺐــــــــــــﻴﻋ ﻦــــــــــــﻣ ثﺪــــــــــــﺤﻳ ةﺮــــــــــــــــــــﺸﻋ ةﺪــــــــــــــــــــﳌ ﻚــــــــــــــــــــﻟذو ،فاﺮــــــــــــــــــــﺷﻹا وأ ﻢﻴﻤــــــــــــــــــــﺼﺘﻟا �ــــــــــــــــــــ� لﺎــــــــــــــــــــﻤهإ وأ ﺄــــــــــــــــــــﻄﺧ ﻦـــــــــــــﻣ ﮫـــــــــــــﻴﻔﻌ� ﻻو ،ةﺄـــــــــــــﺸنﻤﻠﻟ ﻲئاﺪـــــــــــــﺘﺑﻻا مﻼﺘـــــــــــــﺳﻻا ﺦ�رﺎـــــــــــــﺗ ﻦـــــــــــــﻣ أﺪـــــــــــــﺒﺗ تاﻮﻨـــــــــــــﺳ ءﺎـــــــــــــــ��ﻧا وأ ﻲئﺎـــــــــــــــ��ﻟا وأ ﻲئاﺪـــــــــــــــﺘﺑﻻا مﻼﺘـــــــــــــــﺳﻻا ةدﺎهـــــــــــــــﺷ روﺪـــــــــــــــﺻ نﺎﻤـــــــــــــــﻀﻟا اﺬــــــــــــــه ZkÌâÜn€a ZH7I ·”â ܉j€a ً ،ﻊيرﺎـــــــــــــــﺸﳌا تﺎﻣﺪـــــــــــــــﺧ ﻞـــــــــــــــﺣاﺮﻣ ﻦـــــــــــــــﻣ ﺔـــــــــــــــﻠﺣﺮﻣ يأ...
Design Fee. Franchisor reserves the right to require that Master Franchisee obtain the design work for each Planet Beach location from Franchisor. Master Franchisee will pay Franchisor’s then-current Design Fee (“Design Fee”) (currently $2,500US) for the design work Franchisor provides for each location. Master Franchisee acknowledges and agrees that the amount of the Design Fee may increase over the Term of the Agreement. Franchisor agrees that changes to the Design Fee will be on a basis that, in its sole opinion, is consistent with modifications to the Design Fee charged to similarly situated franchisees, provided that the Design Fee may vary by region to account for any regional, legal, market or vendor differences.