Drainage Plans Sample Clauses

Drainage Plans. The SUBCONSULTANT shall prepare drainage plans that included enclosed underground detention and water quality facilities in addition to the work identified in the original agreement. Connections to the existing drainage system will be made at two locations and extend further west than originally anticipated.
AutoNDA by SimpleDocs
Drainage Plans. A complete set of drainage plans including hydraulic and hydrologic calculations shall be incorporated in all road improvement plans.
Drainage Plans. The Consultant will prepare drainage plan sheets, notes, and details. The plans will consist of the following sheets necessary to convey the intent and scope of the Project for the purposes of construction. Drainage plans will consist of: Drainage Map, Drainage Structure Sheet(s) (Per Structure), Miscellaneous Drainage Detail Sheets, Lateral Ditch Plan/Profile, Lateral Ditch Cross Sections, Retention/Detention Pond Detail Sheet(s), Retention Pond Cross Sections, Erosion Control Plan Sheet(s), and Stormwater Pollution Prevention Plan (SWPPP) Sheet(s). The Drainage Plans will be submitted at 30%, 60%, 90%, 100%, and Bid Plans submittals.

Related to Drainage Plans

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Meal Plans Residents living in Residence Facility are required to purchase a College meal plan. Information regarding the meal plan options can be found at xxx.xxx.xxx/xxxxxxx.

  • Improvement Plans A professional improvement plan is a clearly articulated assistance program for a teacher whose student growth measure dimension of the evaluation is below the expected level of student growth. For the purposes of this agreement, improvement plans shall be based on the individual student growth measure level, and not for overall subjects or classes taught.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Construction Plans Tenant shall prepare final plans and specifications for the Tenant Improvements that (a) are consistent with and are logical evolutions of the Approved Schematic Plans and (b) incorporate any other Tenant-requested (and Landlord-approved) Changes (as defined below). As soon as such final plans and specifications ("Construction Plans") are completed, Tenant shall deliver the same to Landlord for Landlord's approval, which approval shall not be unreasonably withheld, conditioned or delayed. All such Construction Plans shall be submitted by Tenant to Landlord in electronic .pdf, CADD and full-size hard copy formats, and shall be approved or disapproved by Landlord within ten (10) business days after delivery to Landlord. Landlord's failure to respond within such ten (10) business day period shall be deemed approval by Landlord. If the Construction Plans are disapproved by Landlord, then Landlord shall notify Tenant in writing of its objections to such Construction Plans, and the parties shall confer and negotiate in good faith to reach agreement on the Construction Plans. Promptly after the Construction Plans are approved by Landlord and Tenant, two (2) copies of such Construction Plans shall be initialed and dated by Landlord and Tenant, and Tenant shall promptly submit such Construction Plans to all appropriate Governmental Authorities for approval. The Construction Plans so approved, and all change orders approved (to the extent required) by Landlord, are referred to herein as the "Approved Plans."

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following: A. Company is required to submit a Notice of Intent to use the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity. Authority and Company both acknowledge that close cooperation is necessary to ensure compliance with any stormwater discharge permit terms and conditions, as well as to ensure safety and to minimize the cost of compliance. Company acknowledges further that it may be necessary to undertake actions to minimize the exposure of stormwater to “significant materials” (as such term may be defined by applicable stormwater rules and regulations) generated, stored, handled, or otherwise used by Company by implementing and maintaining “best management practices” (BMPs) (as such term may be defined in applicable stormwater rules and regulations). Company will establish a BMP plan for the Premises and submit a copy to Authority. B. Company will be knowledgeable of any stormwater discharge permit requirements applicable to Company and with which Company will be obligated to comply. The submittal of a Notice of Intent will be made by Company to the FDEP, and a copy will be submitted to Authority. Company is required to comply with the following requirements including, but not limited to, certification of non-stormwater discharges; collection of stormwater samples; preparation of a Stormwater Pollution Prevention Plan or similar plans; implementation of BMPs; and maintenance and submittal of necessary records. In complying with such requirements, Company will observe applicable deadlines set by the regulatory agency that has jurisdiction over the permit. Company agrees to undertake, at its sole expense, those stormwater permit requirements for which it has received written notice from the regulatory agency and that apply to the Premises, and Company agrees that it will hold harmless and indemnify Authority for any violations or non-compliance with any such permit requirements.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Lesson Plans The parties agree that instruction requires thoughtful preparation. The development of lesson plans by and for the teacher is a professional responsibility. However, a teacher’s planning and preparation may be different based on personal style, professional needs, student needs and experience in the classroom. Plans are to be used as a guide to fulfill the state standards and District’s instructional objectives for student achievement. Plans should include strategies and accommodations for students with disabilities, and English Language Learners, if needed. Remediation and enrichment and the type of progress monitoring should be included, if needed. As such, administrators shall not require that lesson plans be in a particular format. Administrators also shall not require the posting or storage of lesson plans in a particular place or manner. A principal or principal’s designee may request teachers to submit a copy of their lesson plans at the end of the teaching week or at the end of a particular unit. The teacher’s plans are to be used as a guide in order to fulfill the county’s instructional objectives and to assist the teacher in conducting a planned instructional program. Current lesson plans shall be available in the classroom for inspection at all times. Teachers shall not be routinely required to submit a copy of their lesson plans to the site administrator unless required by Article 6.9-2. 6.9-1 In the event a teacher is absent, it shall be the teacher’s responsibility to have lesson plans at the school prior to the start of the pupil day to cover the period of absence not to exceed the balance of the week in which the absence occurred. 6.9-2 If the principal or their designee, through documented classroom observation, determines that a teacher is having difficulty with classroom instruction or is not meeting instructional objectives, the principal shall hold a conference with the teacher having difficulty. The principal may require lesson plans to be turned in at the start of each week if the teacher is in one of the following categories: a) Category I teacher as defined in Article 15: or b) The teacher is on an Instructional Assistance Conference (IAC) or on a Professional Development Plan (PDP); or c) The teacher holds an average rating of Needs Improvement or Unsatisfactory on their last overall summative evaluation; or d) Educational Emergency as outlined in Article XXXI – Board’s Rights per Section 1012.28(8), Florida Statutes.

  • Wastewater investments in the construction, material enhancement, or renewal of infrastructure that supports wastewater and storm water collection, treatment, and management systems. Note: Investments in health infrastructure (e.g., hospitals, long-term care facilities, convalescent centres, and senior centres) are not eligible. Eligible Expenditures will be limited to the following: 1. Infrastructure investments – expenditures associated with acquiring, planning, designing, constructing, or renovating a tangible capital asset and any related debt financing charges specifically identified with that asset. 2. Capacity-building costs – for projects eligible under the capacity-building category only, expenditures associated with the development and implementation of: • Capital investment plans, integrated community sustainability plans, integrated regional plans, housing needs assessments, or asset management plans; • Studies, strategies, systems, software, third-party assessments, plans, or training related to asset management; • Studies, strategies, systems, or plans related to housing or land use; • Studies, strategies, or plans related to the long-term management of infrastructure; and • Other initiatives that strengthen the Recipient’s ability to improve local and regional planning. 3. Joint communications and signage costs – expenditures directly associated with joint federal communication activities and with federal project signage.