Engineering and Planning – General. 5.5.1. MHP Owner/Operator shall ensure that any proposal for “Beyond-the-Meter” work prepared or received by the MHP Owner/Operator is based on a full knowledge of all conditions that would affect the cost and conduct of the conversion. The MHP Owner/Operator shall inform itself fully and convey to all potential Contractors and to PG&E the physical conditions at the work site, including as applicable, potential cultural sites, potential environmental issues, subsurface geology, borrow pit conditions and spoil disposal areas; the availability, location and extent of construction and storage area and other facilities or structures above and below ground; necessary safety precautions and safeguards; dimensions not shown on drawings; the extent of established lines and levels. MHP Owner/Operators who fail to disclose potential issues during the design phase risk removal from the program by PG&E.
Engineering and Planning – General. 5.5.1. MHP Owner/Operator shall ensure that any proposal for “Beyond-the-Meter” work prepared or received by the MHP Owner/Operator is based on a full knowledge of all conditions that would affect the cost and conduct of the 1 The Rules and Tariffs referred to in this schedule are part of PG&E’s Tariff Book. Copies are available at PG&E’s local offices and website at xxxx://xxx.xxx.xxx/tariffs.
Engineering and Planning – General. 5.5.1. MHP Owner/Operator shall ensure that any proposal for “Beyond-the-Meter” work prepared or received by the MHP Owner/Operator is based on a full knowledge of all conditions that would affect the cost and conduct of the rebuild. The MHP Owner/Operator shall inform itself fully and convey to all potential Contractors and to PG&E the physical conditions at the work site, including as applicable, subsurface geology, borrow pit conditions and spoil disposal areas; the availability, location and extent of construction and storage area and other facilities or structures above and below ground; necessary