Estimated Cost of Project Completion Sample Clauses

Estimated Cost of Project Completion. The cost of implementation of Task 1 and Task 2 is estimated to be $88,425. Individual task cost estimates are provided in Table 1. Task 1a Magnesium Hydroxide Pump $7,739 Housing Enclosure $2,498 SCADA Control Integration $13,930 Parts and Fittings $100 Task 1b pH Sensor $1,500 Delivery Pump $714 SCADA Control Integration $8713 Parts and Fittings $500 Task 1b Caustic Tank $14,840 Delivery Pumps $10,891 Concrete Pad $7,000 SCADA Control Integration $14,000 Parts and Fittings $1,000 7. Water body, beneficial use and/or pollutant addressed by this project: This project is expected to improve the secondary/biological treatment process and improve downstream processes (clarification, filtration, and disinfection), resulting in water quality improvements to Deer Creek.
AutoNDA by SimpleDocs
Estimated Cost of Project Completion. The anticipated cost of the Lift Station 5 Force Main Improvements Project is $165,900, which includes $35,726 of suspended liability. The table below shows the proposed improvements and expenses expected with each installation. Cost does not include surface restoration or other related work expenses. Proposed Improvements as Itemized Expenses: Description Units Quantity Unit Cost Line Total 7. Water body, beneficial use and/or pollutant addressed: If the Lift Station 5 Force Main Improvements Project is successful, the increased resiliency of the pressurized system will prevent further SSO events, protecting Bunch Creek, and nearby small businesses and residents from exposure/contamination from untreated sewage.
Estimated Cost of Project Completion. The anticipated cost of the Smart Cover Installation Project is $71,960, which includes $55,357.50 of suspended liability. Itemized Expenses: Smart Cover System: Includes controls, power packs, antennas, and mounting brackets. 12 $4,350 $52,200 Smart Cover Active Site Management - Annual Fee, First Year 12 $435 $5,220 Installation of Each Smart Cover 12 $420 $5,040 Staff Support, Testing, Training, Standard Operating Procedures Development $9,500
Estimated Cost of Project Completion. The cost of Installation of the new sewer line replacement project is estimated to be $325,750 The project is expected to reduce excessive wastewater flows to the treatment plant from I&I and reduce the amount of water pumped to the retention pond. Therefore, this project will reduce the rate that the water from the retention pond is fed to the treatment plant. R1‐2022‐0022 COMPLIANCE PROJECT‌‌‌‌‌ Deliverables July 15, 2022, Milestone & Deliverable - Final Plans and Specifications. July 31, 2022, Deliverable June 17, 2022 – Place project out to Bid August 31, 2022, Deliverable August 17, 2022 – Bid opening, select contractor September 30, 2022, Milestone– Begin Construction October 31, 2022, Milestone– End Construction
Estimated Cost of Project Completion. The total estimated cost of this project is $233,500. Individual component cost estimates are provided in Table 1 below. Task 1 – Investigation and additional monitoring Alpha Laboratory monitoring costs $5,000 Yuba City Laboratory monitoring costs $500 Task 2Chemical treatment $50,000 Task 3 – Upgrade tertiary filters Install 5-micron filter media $34,000 Yuba City Laboratory monitoring costs $4,000 Task 4 – Develop operating procedures and source control measures Conduct industrial user FOG inspections $5,000 Develop FOG source control program 35,000 Develop operating procedures $100,000
Estimated Cost of Project Completion. The total cost of the Compliance Project is estimated to be $323,000. Due to the uncertainty associated with estimating construction costs at a planning level, the engineer’s opinion of cost included below is an estimate and includes a 20% contingency. Individual task cost estimates are provided in the table below. 1 Mobilization (12%) LS 1 $23,000 $23,000 2 4- to 6-inch Pipe Burst LF 335 $100 $34,000 3 Dig and Replace LF 40 $100 $4,000 4 6-inch cast-in- place pipe (CIPP) LF 265 $60 $16,000 5 Clean and closed circuit television (CCTV) LF 265 $15 $4,000 6 Post Inspection LF 265 $5 $1,000 7 Traffic Control LS 1 $10,000 $10,000 Item‌ Description Units Quanti ty Unit Cost Total Cost 8 Erosion and Sediment Control LS 1 $10,000 $10,000 9 Lateral Replacement (less than 6 feet deep) EA 12 $7,200 $86,000 10 Manholes EA 2 $10,000 $20,000 Subtotal: $208,000 Contingency (20%): $42,000 TOTAL CONSTRUCTION: $250,000 Facilities Design (10%): $25,000 Construction Services (15%): $38,000 Administration and Legal (4%): $10,000 TOTAL PROJECT: $323,000 The proposed Compliance Project will reduce infiltration and inflow (I/I) entering the SSCS. Reducing I/I reduces peak wet weather flows entering the WWTF which will result in greater treatment effectiveness. Improving treatment effectiveness by reducing peak wet weather flows will help eliminate discharge violations to the Eel River (receiving water). Projected improvements to the effectiveness of the WWTF will be supplemented by construction of a new WWTF and rehabilitation/repair of a larger portion of the SSCS as described in the Discharger’s CWSRF projects.
Estimated Cost of Project Completion. The goals of the Compliance Project are to prevent future ammonia and total coliform organism violations, as previously described. The Compliance Project, in total, is expected to cost in excess of $60,000; $54,000 of MMPs associated with this Order will be used to fund the Project. Phase I has an estimated budget of $20,000 and Phase II has an estimated budget of $40,000. More than one contractor will be doing the work, as it is expected to be completed in phases. Project construction of the ammonia probe is expected to be completed no later than January 2019, while construction and integration of the fourth blower will be completed by December 2020. The Project will lead to a reduction of ammonia and total coliform discharged to Salt Creek, which is tributary to the Sacramento River.
AutoNDA by SimpleDocs
Estimated Cost of Project Completion. The anticipated cost of the Denitrification Pilot Study is $25,000, which includes $24,000 of suspended liability. Itemized Expenses:
Estimated Cost of Project Completion. The total cost of the WWTP modifications and optimization is estimated to be $177,973. Individual task cost estimates are provided in the table below.
Estimated Cost of Project Completion. The total estimated cost of the Ammonia/Nitrate Reduction Project is $23,757. Individual component cost estimates are provided in Table 1 below. Acquire Aeration Basin Maintenance Pontoon $16,000 Refurbish and Add Diffuser Tubes $7,757 7. Water body, beneficial use and/or pollutant addressed: The Ammonia/Nitrate Reduction Project should reduce effluent ammonia exceedances, with resulting water quality improvements in Salt Creek.