INTEGRATION OF PV POWER WITH GRID Sample Clauses

INTEGRATION OF PV POWER WITH GRID. The output power from SPV would be fed to the inverters which convert DC produced by SPV array to AC and feeds it into the main electricity grid after synchronization. In case of grid failure, or low or high voltage, the solar PV system shall be out of synchronization and shall be disconnected from the grid. 04 pole isolation of inverter output to the grid must be provided with appropriate size of cable .
AutoNDA by SimpleDocs
INTEGRATION OF PV POWER WITH GRID. 1.1.6.1. For better grid interaction and functioning of Project, the following arrangement shall be ensured by Power Producer:
INTEGRATION OF PV POWER WITH GRID. For better grid interaction and functioning of Project, the following arrangement shall be ensured by Power Producer: Project should have appropriate instruments installed at solar panel output, inverter and load to facilitate minute-wise recording and storage of monthly data (voltage, current, generation, consumption and grid injection) for twelve (12) Months of energy flow at various nodes. In case of network failure, or low or high voltage, Project shall go under islanding mode but not be out of synchronization so far as its operation with connected load is concerned. The supply from Project to the load points would be resumed, once the DG set comes into service, Project shall again be synchronised with DG supply and load requirement would be met to the extent of availability of power. 4 pole isolation of inverter output with respect to the grid/ DG power connection need to be provided. The Project commissioned under the [Insert Name of State] Policy for XXXXXXXXXXXXXX, 20XX. as amended from time to time, shall be provided with reverse protection relays in order to prevent reverse flow of active power into the Grid. The relay and devices used for such arrangement shall be of relevant standards. Data Acquisition System / Project Monitoring Data Acquisition System shall be provided for each of the solar PV Project. Data Logging Provision for Project control and monitoring, time and date stamped system data logs for analysis computer for data monitoring, metering and instrumentation for display of systems parameters and status indication to be provided. The following parameters should be accessible via the operating interface display in real time separately for Project: AC Voltage AC Output current. Output Power Power factor DC Input Voltage DC Input Current Time Active Time disabled Time Idle Power produced Protective function limits (Viz-AC Over voltage, AC Under voltage, Over frequency, Under frequency ground fault, PV starting voltage, PV stopping voltage. All major parameters available on the digital bus and logging facility for energy auditing through the internal microprocessor and read on the digital front panel at any time) and logging facility (the current values, previous values for up to a Year and the average values) should be made available for energy auditing through the internal microprocessor and should be read on the digital front panel. String and array DC Voltage, Current and Power, Inverter AC output voltage and current (All 3 phases a...
INTEGRATION OF PV POWER WITH GRID. (i) The output power from SPV would be fed to the inverters/PCU which converts DC produced by SPV array to AC and feeds it into the main electricity grid after synchronization. In case of grid failure, or low or high voltage, solar PV system shall be out of synchronization and shall be disconnected from the grid. 4 pole isolation of inverter output with respect to the grid connection need to be provided. Solar Generation Meter(s) and bidirectional energy meter, as per HERC Net Metering Regulations should also be installed in the campus/building of beneficiary.
INTEGRATION OF PV POWER WITH GRID. (i) In case of Power plant without battery bank (i.e. with string inverter), the existing uni- directional meter of the user shall be installed for gross metering of solar generation while a Bi-directional meter shall be installed for net-metering purpose

Related to INTEGRATION OF PV POWER WITH GRID

  • CERTIFICATION REGARDING CERTAIN FOREIGN-OWNED COMPANIES IN CONNECTION WITH CRITICAL INFRASTRUCTURE (Texas law as of September 1, 2021) By submitting a proposal to this Solicitation, you certify that you agree to the following required by Texas law as of September 1, 2021: Proposing Company is prohibited from entering into a contract or other agreement relating to critical infrastructure that would grant to the company direct or remote access to or control of critical infrastructure in this state, excluding access specifically allowed by the Proposing Company for product warranty and support purposes. Company, certifies that neither it nor its parent company nor any affiliate of company or its parent company, is (1) owned by or the majority of stock or other ownership interest of the company is held or controlled by individuals who are citizens of China, Iran, North Korea, Russia, or a designated country; (2) a company or other entity, including governmental entity, that is owned or controlled by citizens of or is directly controlled by the government of China, Iran, North Korea, Russia, or a designated country; or (3) headquartered in China, Iran, North Korea, Russia, or a designated country. For purposes of this contract, “critical infrastructure” means “a communication infrastructure system, cybersecurity system, electric grid, hazardous waste treatment system, or water treatment facility.” See Tex. Gov’t Code § 2274.0101(2) of SB 1226 (87th leg.). The company verifies and certifies that company will not grant direct or remote access to or control of critical infrastructure, except for product warranty and support purposes, to prohibited individuals, companies, or entities, including governmental entities, owned, controlled, or headquartered in China, Iran, North Korea, Russia, or a designated country, as determined by the Governor.

  • Integration/Entire Agreement of Parties This Agreement constitutes the entire agreement between the Parties and supersedes all prior discussions, negotiations, and agreements, whether oral or written. This Agreement may be amended or modified only by a written instrument executed by both Parties.

  • CERTIFICATION REGARDING BOYCOTTING CERTAIN ENERGY COMPANIES (Texas law as of September 1, 2021) By submitting a proposal to this Solicitation, you certify that you agree, when it is applicable, to the following required by Texas law as of September 1, 2021: If (a) company is not a sole proprietorship; (b) company has ten (10) or more full-time employees; and (c) this contract has a value of $100,000 or more that is to be paid wholly or partly from public funds, the following certification shall apply; otherwise, this certification is not required. Pursuant to Tex. Gov’t Code Ch. 2274 of SB 13 (87th session), the company hereby certifies and verifies that the company, or any wholly owned subsidiary, majority-owned subsidiary, parent company, or affiliate of these entities or business associations, if any, does not boycott energy companies and will not boycott energy companies during the term of the contract. For purposes of this contract, the term “company” shall mean an organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, or limited liability company, that exists to make a profit. The term “boycott energy company” shall mean “without an ordinary business purpose, refusing to deal with, terminating business activities with, or otherwise taking any action intended to penalize, inflict economic harm on, or limit commercial relations with a company because the company (a) engages in the exploration, production, utilization, transportation, sale, or manufacturing of fossil fuel-based energy and does not commit or pledge to meet environmental standards beyond applicable federal and state law, or (b) does business with a company described by paragraph (a).” See Tex. Gov’t Code § 809.001(1).

  • Foreign-Owned Companies in Connection with Critical Infrastructure If Texas Government Code, Section 2274.0102(a)(1) (relating to prohibition on contracts with certain foreign-owned companies in connection with critical infrastructure) is applicable to this Contract, pursuant to Government Code Section 2274.0102, Contractor certifies that neither it nor its parent company, nor any affiliate of Contractor or its parent company, is: (1) majority owned or controlled by citizens or governmental entities of China, Iran, North Korea, Russia, or any other country designated by the Governor under Government Code Section 2274.0103, or (2) headquartered in any of those countries.

  • OPERATION OF AGREEMENT This Agreement will be effective and binding immediately upon its execution, but, anything in this Agreement to the contrary notwithstanding, this Agreement will not be operative unless and until a Change in Control occurs. Upon the occurrence of a Change in Control at any time during the Term, without further action, this Agreement shall become immediately operative.

  • Implementation of Agreement Each Party must promptly execute all documents and do all such acts and things as is necessary or desirable to implement and give full effect to the provisions of this Agreement.

  • Integration and Amendment This Agreement represents the entire Agreement between the parties and there are no oral or collateral agreements or understandings. This Agreement may be amended only by an instrument in writing signed by the parties.

  • Provision of Interconnection Financial Security The Interconnection Customer is obligated to provide all necessary Interconnection Financial Security required under Section 11 of the GIDAP in a manner acceptable under Section 11 of the GIDAP. Failure by the Interconnection Customer to timely satisfy the GIDAP’s requirements for the provision of Interconnection Financial Security shall be deemed a breach of this Agreement and a condition of Default of this Agreement.

  • Provision of Interconnection Service Transmission Provider and Interconnected Transmission Owner agree to provide for the interconnection to the Transmission System in the PJM Region of Interconnection Customer’s Customer Facility identified in the Specifications in accordance with Part IV and Part VI of the Tariff, the Operating Agreement of PJM Interconnection, L.L.C. (“Operating Agreement”), and this ISA, as they may be amended from time to time.

  • Duration of Processing The Parties will Process Shared Personal Data during the Term of the underlying RRA to which this this Data Processing Addendum is applicable, but will abide by the terms of this Data Processing Addendum for the duration of the Processing if in excess of that term, and unless otherwise agreed upon in writing.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!