MANUFACTURER'S INSTRUCTIONS Sample Clauses

MANUFACTURER'S INSTRUCTIONS. .1 Unless otherwise indicated in specifications, install or erect products in accordance with manufacturer's instructions. Do not rely on labels or enclosures provided with products. Obtain written instructions directly from manufacturers.
AutoNDA by SimpleDocs
MANUFACTURER'S INSTRUCTIONS. 1 Compliance: comply with manufacturer's written recommendations or specifications, including product technical bulletins, handling, storage and installation instructions, and datasheet.
MANUFACTURER'S INSTRUCTIONS. Unless otherwise provided in the Contract Documents, the Contractor shall apply, install, erect, connect, use, clean, condition, and operate manufactured articles, materials, and equipment in accordance with the various manufacturers' instructions including those in the instruction manuals required in Paragraph 12.7 and other instructions required in Paragraph 12.8. The Contractor shall compare the requirements of the various manufacturers' instructions with the requirements of the Contract Documents, shall promptly notify RMWD in writing of any difference between such requirements, and shall not proceed with any of the Work affected by such differences until an interpretation or clarification is issued pursuant to Paragraph 3.2. The Contractor shall bear all costs for any error in the Work resulting from his failure to so compare the various requirements and notify RMWD of any such differences.
MANUFACTURER'S INSTRUCTIONS. In addition to the instructions submitted under Paragraph 12.7, the Contractor shall submit manufacturers' instructions to the extent specified or requested by RMWD for his determination of their adequacy and approval. When approved, the Contractor shall distribute copies to all those involved with the instructions.
MANUFACTURER'S INSTRUCTIONS. .1 Unless otherwise specified, comply with manufacturer's latest printed instructions for materials and installation methods.
MANUFACTURER'S INSTRUCTIONS. The Design-Build Firm shall: Comply with manufacturer’s requirements for the handling, delivery, storage, and installation of all materials, and equipment. Where required by the Contract Documents, Design-Build Firm shall submit manufacturer’s printed instructions for delivery, storage, assembly, and installation. Comply with the manufacturer’s applicable instructions and recommendations for the performance of the Work, to the extent that these instructions and recommendations are more explicit or more stringent than requirements indicated in the Contract Documents including the Contract Documents. Inspect each item of material or equipment immediately prior to installation and reject damaged and defective items. Provide attachment and connection devices and methods for securing the Work; secure Work true to line plumb and level, and within recognized industry standards; allow for expansion and building movement; provide uniform joint width in exposed Work; arrange joints in exposed Work to obtain the best visual effect and refer questionable visual effect choices to the Consultant for final decision when applicable to the Work. Recheck measurements and dimensions of the Work, as an integral step in starting each portion of the Work. Install each unit or section of Work during favorable weather conditions, which shall ensure the best possible results in coordination with the entire Project(s) and isolate each unit of Work from incompatible Work as necessary to prevent potential interference among each section and/or deterioration of equipment. Coordinate enclosure of the Work, which requires inspections and tests so as to minimize the necessity of uncovering Work for that purpose. When required by the Contract Documents or the manufacturer, a qualified representative shall be present to observe field conditions, conditions of surface and installation, quality of workmanship, and applications. Manufacturer’s representative shall provide the Design-Build Firm and the Project Manager a written report of field observations.
MANUFACTURER'S INSTRUCTIONS. A. When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Engineer.
AutoNDA by SimpleDocs
MANUFACTURER'S INSTRUCTIONS. A. Where Project Documents require that the installation of work shall comply with the manufacturer's printed instructions, obtain and distribute copies of those instructions to all parties involved in the installation, including two copies to the Consultant.
MANUFACTURER'S INSTRUCTIONS. The Contractor shall check and bring to the attention of NHSBT representative any requirements of the relevant equipment manufacturers instructions were the maintenance tasks / intervals are different to the maintenance tasks / intervals as set out in the NHSBT schedules. In situations where manufacturing instructions / recommendations exceed the tasks or frequencies as stated in the tender document, the recommendations of such manufacturer’s instructions and / or GMP shall be brought to the attention of the NHSBT Representative.
MANUFACTURER'S INSTRUCTIONS. A. When work is specified to comply with manufacturers' instructions, submit copies as specified in Section 013300 - SUBMITTAL REQUIREMENTS, distribute copies to persons involved, and maintain one set in field office.
Time is Money Join Law Insider Premium to draft better contracts faster.