Microproject descriptions Sample Clauses

Microproject descriptions. Human Behavior is a matter of Time! – Modeling Events Interactions through Temporal Processes Date Start: 2022-09-01 Date finish: 2022-12-31 Duration: 4 months Partners: 1. Xxxxxxxxx Nazionale delle Ricerche (CNR), Xxxxxxxx Xxxxx (2 PM) 2. INESC TEC (2 PM) 3. Università di Pisa (UNIPI) (1 PM)
AutoNDA by SimpleDocs
Microproject descriptions. Human-machine collaboration for content analysis in context of Ukrainian war Date Start: 2022-06-01 1. Umeå University (UMU), Xxxx Xxxxxxxx,xxxx.xxxxxxxx@xxx.xx (6 PM) 2. Xxxxxxxxx Nazionale delle Ricerche (CNR), Xxxxxxx Xxxxxx, xxxxxxx.xxxxxx@xxxx.xxx.xx 3. Università di Bologna (UNIBO), Xxxxxx Xxxxxxx, x.xxxxxxx@xxxxx.xx
Microproject descriptions. Neural Mechanism in Human Brain Activity During Weight Lifting Date Start: 2021-05-03 1. TUBITAK BILGEM 2. DFKI Kaiserslautern In this project, it was investigated whether EEG (electroencephalography) signal can be used for detecting the motion as well as the variable weights a person is lifting. To do this, an experimental paradigm has been designed and EEG data have been acquired during performing biceps flexion-extension motions for different weight categories: lifting with no weight (empty), medium, and heavy lifting. Features in EEG data generating difference for each lifted weight of category have been investigated. EEG data via different two EEG headsets have been collected from various participants while they lift different categories of load, namely empty, medium and heavy, in this project. Then, EEG data have been analyzed to realize if different category of weights result in difference in EEG data by applying different deep learning methods together with different machine learning methods. According to the obtained results, it can be said that that EEG signals can be successfully used as a method to predict different loads during dynamic bicep curl motion. Therefore, this result could result more researches to develop rehabilitation systems robust to dynamic changes in weight. Moreover, information regarding weight change could contribute to a better estimation of fatigue condition to be used in sports and training applications. Finally, it has been evaluated that the approach to predict different categories of lifted weight could be used in further optimizations in industrial applications for which usage of exoskeleton can be given as an example. Presentation at the IEEE-EMBS International Conference on Biomedical and Health Informatics jointly organised with the IEEE-EMBS International conference on Wearable and Implantable Body Sensor Networks organized in Ioannina, Greece between 27-30 September 2022. Publication with the title “Prediction of Lifted Weight Category Using EEG Equipped Headgear" in 2022 IEEE-EMBS International Conference on Biomedical and Health Informatics Conference Proceedings. The temporal and biological factors of our vulnerability to disinformation Date Start: 2022-04-01 1. XXXX Xxxx Xxxxxxx xxxxxxxxx-xxxx@xxxx.xx, Xxxxxxxxx Xxxxxxxxxx (ETHZ) Xxxxxxxxx.xxxxxxxxxx@xxxx.xxxx.xx 2. FBK, Xxxxxxxx Xxxxxxxx xxxxxxxxx@xxx.xx Despite all efforts to mitigate mis- and disinformation, they continue to be a substantial problem. This...
Microproject descriptions. Matching the right people! Creating a functional demonstrator for online matching of people and expertise for innovation Date Start: 2022-06-01 Date finish: 2022-12-31 Duration: 6 months Results:
Microproject descriptions. The description of the MP “Matching the right people! Creating a functional demonstrator for online matching of people and expertise for innovation” can be found in Section 6.2.

Related to Microproject descriptions

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Site Description {Buyer Comment: Provide a legal description of the Site, including the Site map.}

  • Product Description The lead products covered by this Settlement Agreement are limited to following Amazon Identification Number (ASIN) B0932PW2FY with the description, "YALANLE 63/37 Solder Tin Lead Rosin Core Solder Wire For Electrical Soldering and DIY 0.22lbs (0.8mm/100g)," which was offered for sale by the Settling Entity on xxxxxx.xxx, hereinafter the “Product” or “Products.”

  • Service Descriptions Credit Card processing services: Global Direct’s actions to the appropriate card associations and/or issuers (e.g., Visa, MasterCard, Diners, Discover); settlement; dispute resolution with cardholders’ banks; and transaction-related reporting, statements and products. Debit/ATM Processing Services: Global Direct has connected to the following debit card networks (“Networks”): Accel, AFFN, Interlink, MAC, Maestro, NYCE, Pulse, Star, and Tyme. Global Direct will provide Merchant with the ability to access the Networks that Global Direct has connected to for the purpose of authorizing debit card transactions at the point of sale from cards issued by the members of the respective Networks. Global Direct will provide connection to such Networks, terminal applications, settlement and reporting activities. EBT Transaction Processing Services: Global Direct offers electronic interfaces to Electronic Benefits Transfer (“EBT”) networks for the processing of cash payments or credits to or for the benefit of benefit recipients (“Recipients”). Global Direct will provide settlement and switching services for various Point of Sale transactions initiated through Merchant for the authorization of the issuance of the United States Department of Agriculture, Food and Nutrition Services (“FNS”) food stamp benefits (“FS Benefits”) and/or government delivered cash assistance benefits (“Cash Benefits, ”with FS Benefits, “Benefits”) to Recipients through the use of a state-issued card (“EBT Card”). With respect to Visa and MasterCard products, Merchant agrees to pay and Merchant's account(s) will be charged pursuant to Section 5 of this Agreement for any additional fees incurred as a result of Merchant's subsequent acceptance of transactions with any Visa or MasterCard product that it has not elected to accept.

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout 76A Single Lane / Level 1 76 0.00 Ending 0.70

  • Service Description 2.1 General

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • Overtime Description For Paid Holidays: Holiday pay for all holidays shall be prorated based two hours per day for each day worked in the holiday week, not to exceed 8 hours of holiday pay. For Thanksgiving week, the prorated share shall be 5 1/3 hours of holiday pay for each day worked in Thanksgiving week. Overtime Time and one half the regular rate after an 8 hour day. Time and one half the regular rate for Saturday. Double time the regular rate for Sunday.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!