Objective Evidence of Milestone Completion Sample Clauses

Objective Evidence of Milestone Completion. At the time of completion, BNI will transmit a list of the document numbers to the DOE Federal Project Manager for the listed document types. Completion will be indicated by the completion of the work packages in engineering progress and performance reports that support the physical design complete, and will be verified by the documents being available in Project Document Control. BNI will provide Control Account Manager’s email notification of milestone completion to the Area Project Manager, Functional Manager, and DOE Federal Project Manager; documents are available for review in Project Document Control. Document type codes for the documents below are described in 24590-WTP-DNT- PADC-02-001, Rev 10, Table 6-5. • All disciplines: - Material requisitions for quote for PT Facility related equipment specifications - Datasheets - Discipline design criteria documents - Supporting calculations - Design proposal drawings - System descriptions to support committed system design • Mechanical and Process: - M6 - Piping and instrumentation diagrams and associated lists - M5 - Process flow diagrams - M8 - Ventilation and instrumentation diagrams and associated lists - Sampling and analysis requirement documents • Plant Design: - P1 - General arrangement drawings - P3 - Isometrics - P6C - Pipe stress and support interim calculations - P1 - Equipment location diagrams • Civil/Structural/Architectural: - A1, A2, and A3 - Architectural plans, elevations, and sections - DB - Concrete drawings - SS - Structural steel drawings - DG - Rebar drawings • Electrical: - E0 - Multipurpose - general drawings - E1 - One lines / single lines - E2 - Underground / embedded conduit plans / plot plans / layouts - E2-E53T - Aboveground raceway and exposed conduit layout - E4 - Electrical layouts / hazard topography - E4 - Electrical layouts - E5 - Control / logic - E6 - Schematics / elem / block diagrams / riser diagrams - E7 - Connection / wiring diagrams - E8 - Electrical load list / panel schedules - E9 - Details / sections - EC - 480V motor control center schedules - Set route report identifying released cables and raceway • Controls and Instrumentation: - J2 - Instrument location drawings - J1 - System block diagrams - J9D - Physical controls and instrumentation design documents (cabinet/rack general arrangement data sheets) • Mechanical Handling: - M7 - Mechanical handling diagrams - M1 - Mechanical sequence diagrams Exceptions • Plant Design: - 3D model will not be available as a...
AutoNDA by SimpleDocs
Objective Evidence of Milestone Completion. At the time of completion, BNI will transmit a list of the drawing numbers to the DOE Federal Project Manager for the drawing type codes listed: - J1 - system block diagram - 3PS - safety system requirements specification - M6 - piping and instrument diagrams (control data from software functional specifications will be incorporated into piping and instrumentation diagrams) Contract Fee Milestones PTF-06 Facility Activity ID Description PTF 1GP47CFM06 Receipt of all Plant Service Air System Pipe Racks Milestone Definition Receive and accept all PSA system pipe racks at the Marshalling Yard, to include the following: PSA-RK-00018 PSA-RK-00028 PSA-RK-00014 PSA-RK-00003 PSA-RK-00037 PSA-RK-00020 PSA-RK-00033 PSA-RK-00016 PSA-RK-00005 PSA-RK-00039 PSA-RK-00021 PSA-RK-00035 PSA-RK-00023 PSA-RK-00006 PSA-RK-00052 PSA-RK-00022 PSA-RK-00036 PSA-RK-00024 PSA-RK-00008 PSA-RK-00053 PSA-RK-00031 PSA-RK-00047 PSA-RK-00027 PSA-RK-00009 PSA-RK-00054 PSA-RK-00032 PSA-RK-00048 PSA-RK-00038 PSA-RK-00010 PSA-RK-00055 PSA-RK-00025 PSA-RK-00049 PSA-RK-00001 PSA-RK-00011 PSA-RK-00056 PSA-RK-00026 PSA-RK-00050 PSA-RK-00002 PSA-RK-00012 N/A N/A Key Predecessors Activity ID Description Activity ID Description 9ZP47257B1 PT QC/MRR – Release 1 – 56+ Racks – Rooms 311/322 Q- MA-PH02-08 9ZP47257E1 PT-MY QC&MRR-Release 4 – 77+ Racks-Rooms 415/423/423A Q-MA-PH02-03 9ZP47257C1 PT-MY QC&MRR-Release 6 – 77+ Rooms 431 A/B 422A/402 Q-MA-PH02-06 9ZP47257G1 PT-MY QC&MRR-Release 3 – 77+ Racks – Rooms 426/410/425 Q-MA-PH02-12 9ZP47257D1 PT-MY QC&MRR-Release 5 – 77+ Racks-Rooms 423A/B Q- MA-PH02-04 9ZP47257H1 PT-MY QC&MRR-Release 2 – 77+ Racks-Room 410 Q-MA- PH02-11 Ref. original ID# 9FP472093X Inclusions Exclusions Objective Evidence of Milestone Completion Completion of this milestone will include a screen shot from the Bechtel Procurement System demonstrating that the material receiving report number has been issued for the specific shipment and the material receiving report has been completed and issued by Project Document Control. Contract Fee Milestones Facility Activity ID Description PTF 1GPZZCFM07 Electrical Design Complete Milestone Definition Complete the Pretreatment electrical design. All deliverables mentioned are for the committed stage of design and include the supporting calculations and evaluations: Single line diagrams Cable tray and raceway drawings Cable and wire routing Schematics Lighting drawings Grounding drawings Cathodic protection design Lightning protection drawings C...
Objective Evidence of Milestone Completion. At the time of completion, BNI will transmit a list of the drawing numbers to the DOE Federal Project Manager for the drawing type codes listed: • E0 - Multipurpose - general drawings • E1 - One lines / single lines • E2 - Underground / embedded conduit plans / plot plans / layouts • E2-E53T – Above ground raceway and exposed conduit layout • E4 - Electrical layouts / hazard topography • E4 - Electrical layouts • E5 - Control / logic • E6 - Schematics / elem / block diagrams / riser diagrams • E7 - Connection / wiring diagrams • E8 - Electrical load list / panel schedules • E9 - Details / sections • EC - 480V motor control center schedules • Setroute report identifying released cables and raceway Contract Fee Milestones Facility Activity ID Description PTF 1GP30CFM08 Set Remaining Pretreatment Vessels at Elevation 0 Ft Milestone Definition Set the remaining in-cell vessels (listed below) in place in their final location. UFP-VSL-0001A UFP-VSL-0002A HLP-VSL-00022 HLP-VSL-0027B PWD-VSL-00044 UFP-VSL-0001B UFP-VSL-0002B HLP-VSL-00028 HLP-VSL-0027A PVP-SCB-0002 PVP-VSL-00001 Inclusions Installation and inspection acceptance of the vessels listed above, verifying the vessels are in the correct final location and orientation; vessels will be in their final operational condition and will not require repair, modification, or upgrades.

Related to Objective Evidence of Milestone Completion

  • Project/Milestones Taxpayer is a multinational defense contractor specializing in the development and manufacture of intelligence, surveillance, and reconnaissance and detection systems. Taxpayer has certified in its application that absent award of the CCTC, its project may occur in another state; and, it may terminate all or a portion of its employees in California or relocate all or a portion of its employees in California to another state. In consideration for the Credit, Taxpayer agrees to hire full-time employees and invest in manufacturing and computer equipment, furniture and fixtures, and tenant improvements as part of its expansion in Anaheim, California (collectively, the “Project”). Further, Taxpayer agrees to satisfy the milestones as described in Exhibit A (“Milestones”) and must maintain Milestones for a minimum of three (3) taxable years thereafter. In the event Taxpayer employs more than the number of full-time employees, determined on an annual full-time equivalent basis, than required in Exhibit A, for purposes of satisfying the “Minimum Annual Wage of California Full-time Employees Hired” and the “Cumulative Average Annual Wage of California Full-time Employees Hired,” Taxpayer may use the wages of any of the full-time employees hired within the required time period. For purposes of calculating the “Minimum Annual Wage of California Full-time Employees Hired” and the “Cumulative Average Annual Wage of California Full-time Employees Hired,” the wage of any full-time employee that is not employed by Taxpayer for the entire taxable year shall be annualized. In addition, the wage of any full-time employee hired to fill a vacated position in which a full-time employee was employed during Taxpayer’s Base Year shall be disregarded.

  • Milestone A principal event specified in the Contract Documents including the Material Completion and Occupancy Date and other events relating to an intermediate completion date or time.

  • Milestone schedule Please state the status and progress of each Milestone and identify any completed Milestone(s) for the previous calendar quarter.

  • Targets and Milestones You may choose to develop specific additional targets and milestones which assess your performance in ITT over time – particularly if ITT trainees make up a significant proportion of your overall student body. Alternatively, you may have targets and milestones in your existing 2012-13 access agreement which you now also wish to apply to undergraduate and/or postgraduate ITT trainees. These targets may be statistical – based on how representative your entrants are and/or your retention performance – and might include annual or interim milestones to help you monitor whether you are making progress. You may wish to include criteria around the numbers of trainees in receipt of a full or partial maintenance grant, as financial data will need to be collected to determine bursary support and the data will also be accessible through the Student Loans Company for HEBSS subscribers. You may also wish to consider the TDA guidance at Annex C which gives information on specific groups that are Annex A underrepresented in the teaching profession. In this section, please state whether you intend to develop additional targets and milestones, or the extent to which you intend to use targets and milestones in your existing agreement which you now wish to extend to apply to undergraduate and/or postgraduate ITT trainees. Where you have new or amended milestones and targets, you should set these out in your Excel template (Annex B) at Table 6. Existing targets will apply.

  • Table 7b - Other milestones and targets Reference Number Select stage of the lifecycle Please select target type from the drop-down menu Description (500 characters maximum) Is this a collaborative target? Baseline year Baseline data Yearly milestones (numeric where possible, however you may use text) Commentary on your milestones/targets or textual description where numerical description is not appropriate (500 characters maximum)

  • Milestones Subject to the provisions of the SGIP, the Parties shall agree on milestones for which each Party is responsible and list them in Attachment 4 of this Agreement. A Party’s obligations under this provision may be extended by agreement. If a Party anticipates that it will be unable to meet a milestone for any reason other than a Force Majeure event, it shall immediately notify the other Parties of the reason(s) for not meeting the milestone and (1) propose the earliest reasonable alternate date by which it can attain this and future milestones, and (2) requesting appropriate amendments to Attachment 4. The Party affected by the failure to meet a milestone shall not unreasonably withhold agreement to such an amendment unless it will suffer significant uncompensated economic or operational harm from the delay, (1) attainment of the same milestone has previously been delayed, or (2) it has reason to believe that the delay in meeting the milestone is intentional or unwarranted notwithstanding the circumstances explained by the Party proposing the amendment.

  • TIME OF COMPLETION The Owner shall issue a Notice to Proceed identifying the date for commencement of the Work. The commencement date shall be 10 or more days after the date the notice is issued. The Contractor shall achieve substantial completion of the Work within _____________________ (____) calendar days after the commencement date, as such completion date may be extended by approved Change Orders. The time set forth for completion of the Work is an essential element of the Contract.

  • SCHEDULE AND MILESTONES The planned major milestones for the activities for this Annex defined in the "Responsibilities" Article are as follows: