Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.
Tests and Inspections § 15.5.1 Tests, inspections and approvals of portions of the Work shall be made as required by the Design-Build Documents and by applicable laws, statutes, ordinances, codes, rules and regulations or lawful orders of public authorities. Unless otherwise provided, the Design-Builder shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Design-Builder shall give the Owner timely notice of when and where tests and inspections are to be made so that the Owner may be present for such procedures. The Owner shall bear costs of (1) tests, inspections or approvals that do not become requirements until after bids are received or negotiations concluded, and (2) tests, inspections or approvals where building codes or applicable laws or regulations prohibit the Owner from delegating their cost to the Design-Builder. § 15.5.2 If the Owner determines that portions of the Work require additional testing, inspection or approval not included under Section 15.5.1, the Owner will instruct the Design-Builder to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Design-Builder shall give timely notice to the Owner of when and where tests and inspections are to be made so that the Owner may be present for such procedures. Such costs, except as provided in Section 15.5.3, shall be at the Owner’s expense. § 15.5.3 If such procedures for testing, inspection or approval under Sections 15.5.1 and 15.5.2 reveal failure of the portions of the Work to comply with requirements established by the Design-Build Documents, all costs made necessary by such failure shall be at the Design-Builder’s expense. § 15.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Design-Build Documents, be secured by the Design-Builder and promptly delivered to the Owner. § 15.5.5 If the Owner is to observe tests, inspections or approvals required by the Design-Build Documents, the Owner will do so promptly and, where practicable, at the normal place of testing. § 15.5.6 Tests or inspections conducted pursuant to the Design-Build Documents shall be made promptly to avoid unreasonable delay in the Work.
Audit and Inspection 9.1 The Recipient, without charge, will permit any officer or officers of the Commissioner, external auditing bodies (i.
Audit and Inspection Rights Alberta Innovates shall be entitled at any time and from time to time during the Term and the Retention Period, upon reasonable prior Notice to the Applicant, to have its authorized agents attend at the Applicant's premises or at the location where the Project is being carried out, to: (a) audit or examine the Records ("Audit"); and/or (b) inspect the premises and assets pertaining to the Project ("Inspection"); to assess whether the Applicant has been and is complying with this Investment Agreement. The costs of any Audit or Inspection shall be paid by Alberta Innovates unless such Audit or Inspection reveals a Default or a failure by the Applicant to maintain proper Records or comply with this Investment Agreement, in which case the costs shall be paid by the Applicant. The Applicant shall provide Alberta Innovates’ authorized agents with all such assistance as may be reasonably required during such Audit or Inspection, Including making and providing Alberta Innovates with copies of any Records as requested by Alberta Innovates. For clarity, such right of Audit and Inspection shall be limited to the purpose of ascertaining whether this Investment Agreement has been complied with, and Alberta Innovates will not have any general right to obtain custody or copies of the records of the Applicant except as contemplated by this Section.
Contracting Information Requirements Contractor represents and warrants that it will comply with the requirements of Section 552.372(a) of the Texas Government Code. Except as provided by Section 552.374(c) of the Texas Government Code, the requirements of Subchapter J (Additional Provisions Related to Contracting Information), Chapter 552 of the Government Code, may apply to the Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.
Information Requirements The Company covenants that, if at any time before the end of the Effectiveness Period the Company is not subject to the reporting requirements of the Exchange Act, it will cooperate with any Holder and take such further reasonable action as any Holder may reasonably request in writing (including, without limitation, making such reasonable representations as any such Holder may reasonably request), all to the extent required from time to time to enable such Holder to sell Registrable Securities without registration under the Securities Act within the limitation of the exemptions provided by Rule 144 and Rule 144A under the Securities Act and customarily taken in connection with sales pursuant to such exemptions. Upon the written request of any Holder, the Company shall deliver to such Holder a written statement as to whether it has complied with such filing requirements, unless such a statement has been included in the Company’s most recent report filed pursuant to Section 13 or Section 15(d) of Exchange Act. Notwithstanding the foregoing, nothing in this Section 7 shall be deemed to require the Company to register any of its securities (other than the Common Stock) under any section of the Exchange Act.
Visits and Inspections Permit representatives of the Administrative Agent or any Lender, from time to time upon reasonable prior notice to visit and inspect its properties; inspect and make extracts from its books, records and files, including, but not limited to, management letters prepared by independent accountants; and discuss with its principal officers, and its independent accountants, its business, assets, liabilities, financial condition, results of operations and business prospects.
Installation requirements We (if we install the System) or our contractor (if we procure a contractor to install the System) must:
Audits and Inspections At any time during normal business hours and as often as the City may deem necessary, Service Provider shall make available to the City for the City’s examination all of Service Provider’s records and documents with respect to all matters covered by this Agreement and, furthermore, Service Provider will permit the City to audit, examine and make copies, excerpts or transcripts from such records, and to make audits of all contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement.
Design Requirements The DG Facility shall be installed in compliance with Wisconsin Administrative Code Chapter PSC 119.