Power Curve test Sample Clauses

Power Curve test. Prior to starting any measurement test the IE conducting the measurement test shall prepare and deliver a written test plan to the Parties that (i) identifies the TWT(s) and the final position for the reference met mast(s), including the corresponding free sector and site calibration requirements, and (ii) describes the type and characteristics of the measurement equipment and verification methodology that will be employed by the IE during and in connection with the Power Curve Test. The Power Curve test for each of the TWTs will be performed according to [Ref.1] only cup anemometers are allowed as main Reference Wind Speed Sensors. The Owner shall communicate the Supplier at 8 weeks in advance the date scheduled for the installation of the measurement sensors on the wind turbines and commencement of the measurement campaign. The Supplier must ensure the availability of the TWTs for power performance purposes on the scheduled date and will previously carry out all the actions and verifications that he may consider necessary prior to the commencement of the measurements, taking always into consideration that the status of the TWT will be representative of all the rest of wind turbines, and that any action must be also implemented in the rest of wind turbines, except in the case of blades cleaning. Special care shall be taken to ensure that the software control version implemented during the test is the same that the one in the rest of turbines and that the one in normal operation during the operation of the wind farm. The TWTs will not be subjected to any type of external limitation (limitation of active or reactive power, or other limitations) during the power curve measurement campaign. The Owner shall share with the Supplier the preliminary raw data of the campaign (at least two weeks of data) and optionally an interim report issued by the IE. The Supplier will review the data and confirm correctness of installation and recorded signals no later than 15 days from the date of the data sending. Should any problem be detected, it will be investigated and solved, and the campaign re-set. In order to compare the Measured Power Curve to the Warranted Power Curve in similar conditions, data will be filtered in accordance of the Validity Range of the Warranted Power Curve and no additional filters should be applied. If a Site Calibration has been conducted, first apply the calibration expressions and then apply all the Validity Range filtering in the estimated q...
AutoNDA by SimpleDocs

Related to Power Curve test

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Acceptance/Performance Test 4.7.1 Prior to synchronization of the Power Project, the SPD shall be required to get the Project certified for the requisite acceptance/performance test as may be laid down by Central Electricity Authority or an agency identified by the central government to carry out testing and certification for the solar power projects.

  • ACCEPTANCE TESTS 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract.

  • Subprojects 1. The Borrower shall make Grants to Beneficiaries (Small Farmers, Municipalities and Organizations) for Subprojects (Farmers’ Business Initiatives, Infrastructure Subprojects and Environmental Subprojects) in accordance with eligibility criteria and procedures acceptable to the Bank as further detailed in the Project Operational Manual.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • Final Completion Date Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by September 30, 2022.

  • Positive Test results for Antibiotics AFTER Milk is collected and has caused the TANKER TO RETURN A POSITIVE RESULT . UPON CUSTOMER RISK ASSESSMENT , MILK IS ACCEPTED. Supplier will not be paid for this Milk as it has tested positive for antibiotics and is deemed to be in breach of ACM Food Safety Program (see part 6.1 for details) and Milk Quality Standards (see Table 3.1). For all positive samples (vat or Tanker) Milk collection will be suspended until a negative sample is achieved. Any subsequent positive vat samples taken during this process will not be paid for. Only after a negative sample is achieved, will ACM schedule Milk for collection. Supplier will be required to complete a CAR (Corrective Action Report) which is a requirement of ACM’s Food Safety Program. Refer to section 4.3 Management of Non‐Conformance ‐ Incident Report in the ACM Food Safety Program manual.

  • Completion of Evaluation Cycle 1. The summative evaluation rating shall be based upon a preponderance of the evidence, assessed in a holistic manner, that is aligned to the Ohio Educator Standards. Only evidence gathered during the walkthroughs and formal observations that are conducted for the current school year may be used.

  • Final Completion The full and final completion of all Work in accordance with the Contract Documents.

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is an NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram with the exception of the English Language Proficiency Assessments for California (“ELPAC”) to be completed by the LEA, and as appropriate to the student, and mandated by XXX xxxxxxxx to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.