Power System Control. Install one (1) RTU at the Small Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Small Generating Facility and plant auxiliary load, and transmit the information received thereby to the Participating TO’s Grid Control Center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Participating TO shall own, operate and maintain the RTU as part of the Participating TO’s Interconnection Facilities.
Power System Control. One (1) RTU at the Small Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Small Generating Facility and plant auxiliary load, and transmit the information received thereby to the Participating TO’s Grid Control Center.
Power System Control. One (1) RTU at the Q628 66 kV Substation to monitor typical substation elements such as MW, MVAR, terminal voltage and circuit breaker status and transmit the information to the Participating TO’s Grid Control Center.
Power System Control. One (1) RTU at the Q628 66 kV Substation to monitor typical substation elements such as MW, MVAR, terminal voltage and circuit breaker status and transmit the information to the Participating TO’s Grid Control Center. 7. Telecommunication: a. Approximately 54.9. miles of new fiber optic cable b. Approximately 2.4 miles of underground fiber optic cable inside 5-inch conduit and appropriate number of 4 feet by 6 feet by 7 feet manholes c. All required light-wave, channel and related terminal equipment at Antelope, Cal Cement, Corum, Del Sur, Lancaster, Neenach and Shuttle 66 kV Substations 8. Real Properties, Transmission Project Licensing, and Environmental Health and Safety. Investigate easements and/or acquisition of land, licensing and permits, and all required environmental activities for the installation of the Participating TO’s Reliability Network Upgrades and associated telecommunication equipment.
Power System Control. Install one (1) RTU at the Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution Provider’s Grid Control Center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider shall own, operate and maintain the RTU as part of the Distribution Provider’s Interconnection Facilities. Notwithstanding the foregoing, at the Distribution Provider’s election, an alternative to installing an RTU locally at the Generating Facility may be implemented in accordance with specifications provided by the Distribution Provider to comply with the real-time telemetering requirements set forth in the Interconnection Handbook.
Power System Control. One (1) RTU at the Q628 66 kV Substation to monitor typical substation elements such as MW, MVAR, terminal voltage and circuit breaker status and transmit the information to the Participating TO’s Grid Control Center. 7. Telecommunication: a. Approximately 54.9. miles of new fiber optic cable b. Approximately 2.4 miles of underground fiber optic cable inside 5-inch conduit and appropriate number of 4 feet by 6 feet by 7 feet manholes c. All required light-wave, channel and related terminal equipment at Antelope, Cal Cement, Corum, Del Sur, Lancaster, Neenach and Shuttle 66 kV Substations
Power System Control. The IC will make use of the already Installed one (1) Remote Terminal Unit (“RTU”) at the Project to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Small Generating Facility and plant auxiliary load, and transmit the information received thereby to the Participating TO’s Grid Control Center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership of the Project, the Participating TO shall own, operate and maintain the RTU as part of the Participating TO’s Interconnection Facilities. SMALL GENERATOR INTERCONNECTION AGREEMENT
Power System Control. Install new RTUs at Xxxx Substation and the Cool Water Generating Station to allow the installation of additional point required to monitor the new 220kV line positions and support the new SPS.
Power System Control. Install one (1) RTUs at the Large Generating Facility to transmit generator unit xxxxx XX and MVAR, plant auxiliary load, generator status, generator circuit breaker status, generator terminal voltage, and project net MW and MVAR. One RTU will be required for Phase 1 and Phase 2, and one RTU will be required for each of Phase 3 and Phase 4 of the Large Generation Facility. Notwithstanding that the RTURTUs will be located on Interconnection Customer’s side of the Point of Change of Ownership, Participating TO shall own, operate and maintain the RTURTUs as part of the Participating TO’s Interconnection Facilities.
Power System Control a. Install one (1) RTU at Flowind Substation to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution Provider’s grid control center.