Pre-Activity Surveys Sample Clauses

Pre-Activity Surveys. The Designated Biologist shall conduct pre-activity surveys within the Project area and a 500-foot buffer surrounding these areas 14-21 days prior to initiating Project activities. The surveys shall be conducted to identify and map for avoidance of nesting birds and special-status species with the potential to occur on the site, including those identified in the Project impacts section of this Agreement, and any habitat, dens, xxxxxxx, nests, standing water, etc. capable of supporting a special-status species. The Designated Biologist shall ensure that the methods used to locate, identify, map, avoid, and buffer individuals or habitat are appropriate and effective, including the assurance that the surveyor has attained 100% visual coverage of the entirety of the potential impact areas, and an appropriate buffer surrounding those areas. If any special-status species (or sign of presence) is identified within or adjacent to the Project area, Permittee shall immediately (within 24 hours) notify CDFW and submit, no less than one week prior to initiation of Project activities, species-specific avoidance measures that when implemented, will fully avoid impacts to the special-status species. If full avoidance cannot be avoided, Permittee shall postpone the Project, and contact CDFW to discuss an appropriate path forward.
AutoNDA by SimpleDocs
Pre-Activity Surveys. Pre-activity surveys for potential rare, listed, or other special status species shall be conducted by a qualified biologist within 14 days prior to the start of work at any site. Surveys shall be conducted within the work area and all access routes to avoid and minimize take, confirm previous observations, identify any areas occupied by listed or other sensitive status species, and clearly mark all resources to be avoided by Project activities. A Pre-Activity Survey Report shall be submitted to CDFW within seven days of completing surveys. If any State- or federally listed threatened, endangered, or candidate species are found or could be impacted by the Project, Permittee shall notify CDFW of the discovery immediately and work shall not begin or continue until CDFW provides written authorization. An amended Agreement and/or a State Incidental Take Permit pursuant to Fish and Game Code section 2081, subdivision (b), and a new CEQA analysis may be necessary before the Project can begin.

Related to Pre-Activity Surveys

  • Education and Specialized Knowledge Preferably secondary school graduation; a good working knowledge of the Motor Vehicle Act and Regulations; a good knowledge of safety rules and regulations as they pertain to the driving and/or operation of the vehicles, equipment and machinery involved; preferably graduation from a defensive driving course and/or a recognized training program in the driving and operation of commercial type vehicle or heavy equipment.

  • Additional Information for Product Development Projects Outcome of product development efforts, such copyrights and license agreements. • Units sold or projected to be sold in California and outside of California. • Total annual sales or projected annual sales (in dollars) of products developed under the Agreement. • Investment dollars/follow-on private funding as a result of Energy Commission funding. • Patent numbers and applications, along with dates and brief descriptions.  Additional Information for Product Demonstrations: • Outcome of demonstrations and status of technology. • Number of similar installations. • Jobs created/retained as a result of the Agreement.

  • Schedule for Completing Agreement Closeout Activities Provide All Draft and Final Written Products on a CD-ROM or USB memory stick, organized by the tasks in the Agreement. Products: • Final Meeting Agreement Summary (if applicable) • Schedule for Completing Agreement Closeout Activities • All Draft and Final Written Products

  • Action Item Task MSU Status Comments I.1 The University will employ and empower a Clery Act compliance professional (CCP). The CCP must report to a Vice President (VP) or equivalent. The CCP must not be employed in or under the sole authority of the Office of the General Counsel (OGC). Implemented The Office of Audit, Risk and Compliance (OARC) hired a qualified candidate who began work in February 2020.

  • Familiarity with Project Contractor represents that it has: (a) visited and examined the Site(s), (b) taken into account local conditions and observed conditions that affect the Project, the Work, or the cost thereof, (c) investigated the labor situation related to the Project, (d) examined the superintendence of the Project, the Work, the time of completion, and other relevant matters, and (e) has taken these into consideration in submitting his bid.

  • CONTRACT SALES ACTIVITY REPORT Each calendar quarter, Vendor must provide a contract sales activity report (Report) to the Sourcewell Contract Administrator assigned to this Contract. A Report must be provided regardless of the number or amount of sales during that quarter (i.e., if there are no sales, Vendor must submit a report indicating no sales were made). The Report must contain the following fields: • Customer Name (e.g., City of Staples Highway Department); • Customer Physical Street Address; • Customer City; • Customer State/Province; • Customer Zip Code; • Customer Contact Name; • Customer Contact Email Address; • Customer Contact Telephone Number; • Sourcewell Assigned Entity/Participating Entity Number; • Item Purchased Description; • Item Purchased Price; • Sourcewell Administrative Fee Applied; and • Date Purchase was invoiced/sale was recognized as revenue by Vendor.

  • School Improvement Plans The School shall develop and implement a School Improvement Plan as required by section 1002.33(9)(n), Florida Statutes and applicable State Board of Education Rules or applicable federal law.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Reasonable Suspicion Testing The Employer may, but does not have a legal duty to, request or require an employee to undergo drug and alcohol testing if the Employer or any supervisor of the employee has a reasonable suspicion (a belief based on specific facts and rational inferences drawn from those facts) related to the performance of the job that the employee:

Time is Money Join Law Insider Premium to draft better contracts faster.