Quality Control Manager Sample Clauses

Quality Control Manager. Prior to initiation of construction, Contractor shall designate in writing a Quality Control Manager who shall be responsible for coordinating Contractor's Quality Control Program. The individual so designated shall be the interface with the Project Manager on matters relating to submittals, inspection, scheduling, unacceptable Work product, and corrective actions. Metro reserves the right to accept or reject the Quality Control Manager designated by Contractor.
AutoNDA by SimpleDocs
Quality Control Manager. The Contractor shall utilize a full time QC Manager for this Contract.
Quality Control Manager. A qualified and experienced Quality Control Manager who, with respect to a Construction Work Package: oversees and manages the quality control for the Work; administers the Contractor’s quality control program; is licensed in Virginia as a professional engineer; signs and seals all updates and tasks completed under the Contractor’s Quality Control Plan; reviews the proposed quality control program of each Subcontractor and Supplier, makes appropriate recommendations, and enforces the quality control requirements of the Contract Documents; and conducts a review of the quality control program and documentation at the Contractor’s progress meetings with Subcontractors and Suppliers.
Quality Control Manager. Contractor shall assign a QC manager before the start of the affected work. The QC manager shall receive, review, and approve all correspondence, submittals, and reports relating to the QC of materials before they are submitted to County’s Contract Administrator. The QC manager shall be the sole individual responsible for: 1. Signing the QC plan 2. Implementing the QC plan 3. Maintaining the QC records The QC manager shall be Contractor’s employee or shall be hired by a subcontractor providing only QC services. The QC manager shall not be employed or compensated by a subcontractor or by any other persons or entities hired by subcontractors who will provide services or material for the project.
Quality Control Manager. (QCM) The Contractor shall provide a QCM who shall have full authority and responsibility for assuring performance objectives and standards identified in this contract are met. The QCM may be the same person as the project manager. The QCM or alternate shall be available on-site within one hour after the Government's request.
Quality Control Manager. The Quality Control Manager will be responsible for ensuring the company provides quality products and services. They shall have a minimum of seven (7) years of relevant experience in the quality control field, including five (5) years of experience as a Quality Control Manager. They should have a bachelor’s degree in engineering or related field from an accredited university or college. The Quality Control manager is considered a key position and shall be identified to the Government, along with a current resume, upon notification of the base contract award. Project Manager Project Managers shall be responsible for planning and executing major portions of the assigned projects. Prepares and maintains the project scope, schedule, and budget. They shall serve as the primary point of contact for the customer on assigned projects. They shall be responsible for overseeing all work and will take corrective action as necessary to ensure success of assigned projects. They shall manage staffing, budget, prioritization, and other personnel matters related to the assigned project. They may serve as technical lead for assigned projects. They should have experience with Government or industry processes, procedures, standards, methodologies, and tools as relative to the assignment. They should have a minimum of five (5) years of experience in the project management field plus demonstrated experience in the project’s functional area. They should have a bachelor’s degree from an accredited university or college and should have PMP certification. The project manager position is a key position for each individual task order; identification of the project manager for each individual task order will be required during the task order award process.
Quality Control Manager. Typical seven to ten (7 - 10) years’ relevant experience in the quality control field, including five
AutoNDA by SimpleDocs

Related to Quality Control Manager

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time. B. Controlled Affiliate agrees to comply with all applicable federal, state and local laws. C. Controlled Affiliate agrees that it will provide on an annual basis (or more often if reasonably required by Plan or by BCBSA) a report or reports to Plan and BCBSA demonstrating Controlled Affiliate’s compliance with the requirements of this Agreement including but not limited to the quality control provisions of this paragraph and the attached Exhibit A. D. Controlled Affiliate agrees that Plan and/or BCBSA may, from time-to-time, upon reasonable notice, review and inspect the manner and method of Controlled Affiliate’s rendering of service and use of the Licensed Marks and Name. E. As used herein, a Controlled Affiliate is defined as an entity organized and operated in such a manner, that it meets the following requirements: (1) A Plan or Plans authorized to use the Licensed Marks in the Service Area of the Controlled Affiliate pursuant to separate License Agreement(s) with BCBSA, other than such Controlled Affiliate’s License Agreement(s), (the “Controlling Plan(s)”), must have the legal authority directly or indirectly through wholly-owned subsidiaries to select members of the Controlled Affiliate’s governing body having not less than 50% voting control thereof and to: (a) prevent any change in the articles of incorporation, bylaws or other establishing or governing documents of the Controlled Affiliate with which the Controlling Plan(s) do(es) not concur; (b) exercise control over the policy and operations of the Controlled Affiliate at least equal to that exercised by persons or entities (jointly or individually) other than the Controlling Plan(s); and Notwithstanding anything to the contrary in (a) through (b) hereof, the Controlled Affiliate’s establishing or governing documents must also require written approval by the Controlling Plan(s) before the Controlled Affiliate can: (i) change its legal and/or trade names; (ii) change the geographic area in which it operates; (iii) change any of the type(s) of businesses in which it engages; (iv) create, or become liable for by way of guarantee, any indebtedness, other than indebtedness arising in the ordinary course of business; (v) sell any assets, except for sales in the ordinary course of business or sales of equipment no longer useful or being replaced; (vi) make any loans or advances except in the ordinary course of business; (vii) enter into any arrangement or agreement with any party directly or indirectly affiliated with any of the owners or persons or entities with the authority to select or appoint members or board members of the Controlled Affiliate, other than the Plan or Plans (excluding owners of stock holdings of under 5% in a publicly traded Controlled Affiliate); (viii) conduct any business other than under the Licensed Marks and Name; (ix) take any action that any Controlling Plan or BCBSA reasonably believes will adversely affect the Licensed Marks and Name. In addition, a Plan or Plans directly or indirectly through wholly owned subsidiaries shall own at least 50% of any for-profit Controlled Affiliate. (2) A Plan or Plans authorized to use the Licensed Marks in the Service Area of the Controlled Affiliate pursuant to separate License Agreement(s) with BCBSA, other than such Controlled Affiliate’s License Agreement(s), (the “Controlling Plan(s)”), have the legal authority directly or indirectly through wholly-owned subsidiaries to select members of the Controlled Affiliate’s governing body having more than 50% voting control thereof and to: (a) prevent any change in the articles of incorporation, bylaws or other establishing or governing documents of the Controlled Affiliate with which the Controlling Plan(s) do(es) not concur; (b) exercise control over the policy and operations of the Controlled Affiliate. In addition, a Plan or Plans directly or indirectly through wholly-owned subsidiaries shall own more than 50% of any for-profit Controlled Affiliate.

  • Quality Control Program Engineer shall have a quality control program in place that ensures that all deliverable work is of high quality. Engineer shall submit a plan detailing its program to the Inspection Branch of the TxDOT Bridge Division for review and approval prior to beginning work. State may review or audit the programs.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Data Integrity Control Personal Data will remain intact, complete and current during processing activities.

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos. b. Each party agrees to use, and to cause its Permitted Sublicensees to use, the other party’s trademarks only in good faith and in a dignified manner consistent with such party’s use of the trademarks. Upon written notice to the breaching party, the breaching party has 30 days of the date of the written notice to cure the breach or the license will be terminated.

  • Compliance Control Services (1) Support reporting to regulatory bodies and support financial statement preparation by making the Fund's accounting records available to the Trust, the Securities and Exchange Commission (the “SEC”), and the independent accountants. (2) Maintain accounting records according to the 1940 Act and regulations provided thereunder. (3) Perform its duties hereunder in compliance with all applicable laws and regulations and provide any sub-certifications reasonably requested by the Trust in connection with any certification required of the Trust pursuant to the Xxxxxxxx-Xxxxx Act of 2002 (the “SOX Act”) or any rules or regulations promulgated by the SEC thereunder, provided the same shall not be deemed to change USBFS’s standard of care as set forth herein. (4) Cooperate with the Trust’s independent accountants and take all reasonable action in the performance of its obligations under this Agreement to ensure that the necessary information is made available to such accountants for the expression of their opinion on the Fund’s financial statements without any qualification as to the scope of their examination.

  • Quality Control Procedures The Seller shall have an internal quality control program that verifies, on a regular basis, the existence and accuracy of the legal documents, credit documents, property appraisals, and underwriting decisions. The program shall include evaluating and monitoring the overall quality of the Seller's loan production and the servicing activities of the Seller. The program is to ensure that the Mortgage Loans are originated and serviced in accordance with Accepted Servicing Standards and the Underwriting Guidelines; guard against dishonest, fraudulent, or negligent acts; and guard against errors and omissions by officers, employees, or other authorized persons.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Input Control The possibility to subsequently verify and determine whether, and by whom, personal data was entered into, changed or removed from data processing systems must be ensured. • Definition of entry authorisation • Logging of logins

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!