Safety and Quality Control. Carefully adhere to UGC Article 7 Safety, Article 8 regarding Quality Control and Article 9 regarding
AutoNDA by SimpleDocs
Safety and Quality Control. CM shall carefully adhere to the requirements of the Contract Documents for safety and quality control, including UGC Article 7 Safety, Article 8 regarding Quality Control and Article 9 regarding
Safety and Quality Control. The following sections provide the Consultant’s safety program and a detailed explanation of the Quality Assurance and Control Program to be implemented for this project. Quality and Schedule Control Consultant will conduct independent performance audits of the TSP, PM2.5 and PM10 monitors as well as meteorological parameters in accordance with EPA Quality Assurance Handbook series, Volumes I, II, and IV. Performance audits are independent checks that will be made by independent personnel from the Consultant’s Quality Assurance (QA) Department. The audits will be performed to evaluate the accuracy of data produced by the field measurement system against the NIST-traceable audit system. Performance audits will be a quantitative appraisal of quality. Performance audits will be independent of, and in addition to, the routine quality control checks performed on the monitors. Independence will be achieved by maintaining the Consultant’s Quality Assurance (QA) Coordinator for the monitoring project as a separate, independent entity within the Consultant’s project operating organization. All auditing work will be performed under the QA Coordinator’s supervision using trained personnel different from those conducting the routine network measurements and using test equipment and calibration standards other than those usedfor routine calibration and QC checks of the monitors. A systems audit is an on-site inspection and evaluation of the monitoring network field activities, documentation and field measurement system (monitoring system condition, operational procedures, etc.) for each monitor. Whereas performance audits are a quantitative appraisal, system audits will be a qualitative appraisal of the monitoring program. Consultant will conduct a systemaudit concurrently with each internal performance (accuracy) audit. The results of the audit will give a better overall picture of the conditions and operations of the monitoring network and provide a reflection of the quality of the sample data. The Consultant’s management plan for the Authority’s air quality monitoring program will be designed to satisfy all project requirements regarding quality and on-schedule performance. Consultant will maintain strong management controls in the operation of air monitoring network.

Related to Safety and Quality Control

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Power Quality Neither the facilities of Developer nor the facilities of Connecting Transmission Owner shall cause excessive voltage flicker nor introduce excessive distortion to the sinusoidal voltage or current waves as defined by ANSI Standard C84.1-1989, in accordance with IEEE Standard 519, or any applicable superseding electric industry standard. In the event of a conflict between ANSI Standard C84.1-1989, or any applicable superseding electric industry standard, ANSI Standard C84.1-1989, or the applicable superseding electric industry standard, shall control.

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Air Quality To the extent applicable, Consultant must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Consultant shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel-powered engine. Consultant shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Consultant, its subconsultants, or others for whom Consultant is responsible under its indemnity obligations provided for in this Agreement.