Schematic Design Budget Estimate Sample Clauses

Schematic Design Budget Estimate. While the preliminary schematic design submission is under review by DCPS and the Department, the Design-Builder shall update the Approved Concept Design Estimate based on the preliminary schematic design submission (the “Schematic Design Budget Estimate”). The Schematic Design Budget Estimate shall be prepared in a format similar to the Approved Concept Design Estimate and shall show variances from the Approved Concept Design Estimate. The Schematic Design Budget Estimate shall be submitted within two (2) weeks of the submission of the initial schematic design submission and shall be updated to reflect any changes resulting from DGS’ and DCPS’ review of the initial schematic design and incorporated into the approved schematic design.
AutoNDA by SimpleDocs
Schematic Design Budget Estimate. While the preliminary schematic design submission is under review by DPR and the Department, the A/E shall prepare a detailed cost estimate of the schematic design. With regard to building systems (i.e. roofs, doors, HVAC, security, IT, etc.), the cost estimate shall be prepared on a “system” basis that identifies the key building systems or functions and allocates an estimated cost for each such system. The primary purpose of such cost estimate is to aid the Department and DPR in understanding the costs associated with key elements of the Project to better prioritize and manage the use of the funding allocated to this Project. The A/E will be required to break out the landscaping costs by Project element (e.g., pathways; playground; fountain; etc.) as directed by the Department. The cost estimate shall be submitted within two (2) weeks of the submission of the schematic design submission. The cost estimate shall be updated to reflect any changes resulting from DGS’ and DPR’s review of the schematic design and incorporated into the approved schematic design (such estimate, the “Approved Schematic Design Estimate”).
Schematic Design Budget Estimate. While the preliminary schematic design submission is under review by DPR and the Department, the A/E shall prepare a detailed cost estimate of the schematic design with a magnitude of error of Not to Exceed +/- 10% of the Project hard cost budget. With regard to building systems (i.e. mechanical, water treatment, electrical, etc.), the cost estimate shall be prepared on a “system” basis that identifies the key building systems or functions and allocates an estimated cost for each such system. The primary purpose of such cost estimate is to aid the Department and DPR in understanding the costs associated with key elements of the Project to better prioritize and manage the use of the funding allocated to this Project. The A/E will be required to break out the landscaping costs by Project element (e.g., pathways; playground; fountain; etc.) as directed by the Department. The cost estimate shall be submitted within two (2) weeks of the submission of the schematic design submission. The cost estimate shall be updated to reflect any changes resulting from DGS’ and DPR’s review of the schematic design and incorporated into the approved schematic design (such estimate, the “Approved Schematic Design Estimate”).

Related to Schematic Design Budget Estimate

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.

  • Ownership of Drawings and Specifications All Drawings, Specifications and copies thereof furnished by the A/E are to remain A/E’s property. These documents are not to be used on any other project, and with the exception of one contract set for each party to the Contract, are to be returned to the A/E, upon request, following completion of the Work.

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.