Scope of Phase One Cluster Study Sample Clauses

Scope of Phase One Cluster Study. The Phase One Cluster Study shall evaluate the impact of all proposed Interconnection Requests in the applicable Cluster on the reliability of the Transmission System. The Phase One Cluster Study will consider the Base Cases as well as all Generating Facilities (and with respect to (iii) and (iv) below, any identified Network Upgrades associated with such senior queued interconnection) that, on the date the Cluster Request Window closes: (i) are existing and directly interconnected to the Transmission System; (ii) are existing and interconnected to Affected Systems and may have an impact on the Interconnection Request; (iii) have a pending senior queued Interconnection Request or are in a senior queued Cluster to interconnect to the Transmission System; and (iv) have executed an LGIA. For purposes of determining necessary Interconnection Facilities and Network Upgrades, the Phase One Cluster Study shall consider the Interconnection Service level requested by each Interconnection Customer in the Cluster, unless one or more Interconnection Customer’s full Generating Facility Capacity is required to be studied due to safety or reliability concerns. The Phase One Cluster Study shall consist of a short circuit analysis, a power flow analysis, and a preliminary analysis of the necessary Interconnection Facilities and Network Upgrades, the results of which will be documented in a Phase One Cluster Study Report, or associated Cluster Re-Study Report, as applicable for each Cluster Area. Transmission Provider will determine the Point of Interconnection at its sole discretion to improve: the reliability benefits, cost and/or benefits of the interconnection for the Cluster Area. In the event that Transmission Provider determines that a requested Point of Interconnection is not feasible or may need to be relocated, Transmission Provider will make Reasonable Efforts to consult with the impacted Interconnection Customer, so long as these meetings will not delay the issuance of the Phase One Cluster Study Report. For purposes of identifying Network Upgrades and other facilities caused by requests for Network Resource Interconnection Service, Transmission Provider shall assume all Interconnection Requests in the applicable Phase One Cluster Study have requested Energy Resource Interconnection Service, to establish a baseline of shared Network Upgrades. Transmission Provider will include the assessment for Network Resource Interconnection Service as part of the Phase Two C...
AutoNDA by SimpleDocs

Related to Scope of Phase One Cluster Study

  • Clinical Trials The studies, tests and preclinical and clinical trials conducted by or on behalf of, or sponsored by, the Company, or in which the Company has participated, that are described in the Registration Statement, the Time of Sale Disclosure Package or the Prospectus, or the results of which are referred to in the Registration Statement, the Time of Sale Disclosure Package or the Prospectus, were and, if still pending, are being conducted in all material respects in accordance with protocols, procedures and controls pursuant to, where applicable, accepted professional and scientific standards for products or product candidates comparable to those being developed by the Company and all applicable statutes, rules and regulations of the FDA, the EMEA, Health Canada and other comparable drug and medical device (including diagnostic product) regulatory agencies outside of the United States to which they are subject; the descriptions of the results of such studies, tests and trials contained in the Registration Statement, the Time of Sale Disclosure Package or the Prospectus do not contain any misstatement of a material fact or omit a material fact necessary to make such statements not misleading; the Company has no knowledge of any studies, tests or trials not described in the Disclosure Package and the Prospectus the results of which reasonably call into question in any material respect the results of the studies, tests and trials described in the Registration Statement, the Time of Sale Disclosure Package or Prospectus; and the Company has not received any notices or other correspondence from the FDA, EMEA, Health Canada or any other foreign, state or local governmental body exercising comparable authority or any Institutional Review Board or comparable authority requiring or threatening the termination, suspension or material modification of any studies, tests or preclinical or clinical trials conducted by or on behalf of, or sponsored by, the Company or in which the Company has participated, and, to the Company’s knowledge, there are no reasonable grounds for the same. Except as disclosed in the Registration Statement, the Time of Sale Disclosure Package and the Prospectus, there has not been any violation of law or regulation by the Company in its respective product development efforts, submissions or reports to any regulatory authority that could reasonably be expected to require investigation, corrective action or enforcement action.

  • Tests and Preclinical and Clinical Trials The preclinical studies and clinical trials conducted by or, to the Company’s knowledge, on behalf of the Company, that are described in the Registration Statement, the Pricing Disclosure Package and the Prospectus, as applicable, and are intended to be submitted to the U.S. Food and Drug Administration (the “FDA”) or other comparable government entities, were and, if still ongoing, are being conducted in all material respects in accordance with experimental protocols, procedures and controls pursuant to accepted professional scientific standards and all Authorizations and Applicable Laws, including, without limitation, current Good Clinical Practices and Good Laboratory Practices and any applicable rules and regulations of the jurisdiction in which such trials and studies are being conducted; the descriptions of the results of such studies and trials contained in the Registration Statement, the Pricing Disclosure Package and the Prospectus are, to the Company’s knowledge, accurate and complete in all material respects and fairly present the data derived from such studies and trials; except to the extent disclosed in the Registration Statement, the Pricing Disclosure Package and the Prospectus, the Company is not aware of any studies or trials, the results of which the Company believes reasonably call into question the study or trial results described or referred to in the Registration Statement, the Pricing Disclosure Package and the Prospectus when viewed in the context in which such results are described and the clinical stage of development; and, except to the extent disclosed in the Registration Statement, the Pricing Disclosure Package or the Prospectus, the Company has not received any written notices or written correspondence from the FDA or any governmental entity requiring the termination or suspension of any preclinical studies or clinical trials conducted by or on behalf of the Company, other than ordinary course communications with respect to modifications in connection with the design and implementation of such trials, copies of which communications have been made available to you.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Clinical Studies The animal and other preclinical studies and clinical trials conducted by the Company or on behalf of the Company were, and, if still pending are, to the Company’s knowledge, being conducted in all material respects in compliance with all Applicable Laws and in accordance with experimental protocols, procedures and controls generally used by qualified experts in the preclinical study and clinical trials of new drugs and biologics as applied to comparable products to those being developed by the Company; the descriptions of the results of such preclinical studies and clinical trials contained in the Registration Statement and the Prospectus are accurate and complete in all material respects, and, except as set forth in the Registration Statement and the Prospectus, the Company has no knowledge of any other clinical trials or preclinical studies, the results of which reasonably call into question the clinical trial or preclinical study results described or referred to in the Registration Statement and the Prospectus when viewed in the context in which such results are described; and the Company has not received any written notices or correspondence from the FDA, the EMA, or any other domestic or foreign governmental agency requiring the termination, suspension or modification of any preclinical studies or clinical trials conducted by or on behalf of the Company that are described in the Registration Statement and the Prospectus or the results of which are referred to in the Registration Statement and the Prospectus.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • Clinical 1.1 Provides comprehensive evidence based nursing care and individual case management to a specific group of patients/clients including assessment, intervention and evaluation. 1.2 Undertakes clinical shifts at the direction of senior staff and the Nursing Director including participation on the on-call/after-hours/weekend roster if required. 1.3 Responsible and accountable for patient safety and quality of care through planning, coordinating, performing, facilitating, and evaluating the delivery of patient care relating to a particular group of patients, clients or staff in the practice setting. 1.4 Monitors, reviews and reports upon the standard of nursing practice to ensure that colleagues are working within the scope of nursing practice, following appropriate clinical pathways, policies, procedures and adopting a risk management approach in patient care delivery. 1.5 Participates in xxxx rounds/case conferences as appropriate. 1.6 Educates patients/carers in post discharge management and organises discharge summaries/referrals to other services, as appropriate. 1.7 Supports and liaises with patients, carers, colleagues, medical, nursing, allied health, support staff, external agencies and the private sector to provide coordinated multidisciplinary care. 1.8 Completes clinical documentation and undertakes other administrative/management tasks as required. 1.9 Participates in departmental and other meetings as required to meet organisational and service objectives. 1.10 Develops and seeks to implement change utilising expert clinical knowledge through research and evidence based best practice. 1.11 Monitors and maintains availability of consumable stock. 1.12 Complies with and demonstrates a positive commitment to Regulations, Acts and Policies relevant to nursing including the Code of Ethics for Nurses in Australia, the Code of Conduct for Nurses in Australia, the National Competency Standards for the Registered Nurse and the Poisons Act 2014 and Medicines and Poisons Regulations 2016. 1.13 Promotes and participates in team building and decision making. 1.14 Responsible for the clinical supervision of nurses at Level 1 and/or Enrolled Nurses/ Assistants in Nursing under their supervision.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Concession Area, including its abandonment.

  • Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!