Storage of Materials and Equipment. Borrower will cause all equipment, supplies and materials acquired or furnished in connection with the construction of each Home but not affixed to or incorporated into the Project to be stored on the Lot or at other locations reasonably approved by Lender in writing, in each case under adequate safeguard to minimize the possibility of loss, theft, damage or commingling with other property. Upon request of Lender, Borrower will furnish an inventory of all such equipment, supplies and materials stored off-site, specifying the location thereof. Borrower agrees that it will take all reasonable steps required by Lender in order to perfect a security interest in such equipment, supplies and materials.
Storage of Materials and Equipment. 1. Materials and equipment shall not be stored where they will interfere with Railroad operations, nor on the rights-of-way of the Railroad without first having obtained permission from the Railroad Engineer, and such permission will be with the understanding that the Railroad will not be liable for damage to such material and equipment from any cause and that the Railroad Engineer may move or require the Contractor to move, at the Contractor’s expense, such material and equipment.
2. All grading or construction machinery that is left parked near the track unattended by a watchman shall be effectively immobilized so that it cannot be moved by unauthorized persons. The Contractor shall protect, defend, indemnify and save Railroad, and any associated, controlled or affiliated corporation, harmless from and against all losses, costs, expenses, claim or liability for loss or damage to property or the loss of life or personal injury, arising out of or incident to the Contractor’s failure to immobilize grading or construction machinery.
Storage of Materials and Equipment. 7.8.1 The contractor shall not store or stockpile construction materials or equipment closer than 25 feet to the centerline of the nearest railroad track or on the Railroad’s property not covered by construction easement, contractor’s permit, lease or agreement. Additionally, the contractor shall not store or leave materials or equipment within 250 feet of the edge of any highway/rail at-grade crossings. Further, both sides of a main track shall remain unobstructed for a distance of 10 feet from the exterior edge of the track at all times to allow for stopped train inspection.
7.8.2 Machines or vehicles shall not be left unattended with the engine running. Parked machines or equipment shall be in gear with brakes set and with blade, pan or bucket lowered to the ground if so equipped. All grading or construction machinery that is left parked near the track unattended shall be effectively immobilized so that unauthorized persons cannot move such equipment.
Storage of Materials and Equipment. Materials and equipment shall be safely stored by the Owner to ensure the preservation of their quality and fitness for the Work. Stored equipment and materials shall be placed so as to facilitate inspection. The Owner shall be responsible for all loss or damage that may occur to all materials and equipment until final acceptance of the Work by the Association.
Storage of Materials and Equipment. Construction Manager shall accept receipt of all materials and equipment, provide storage and protection for materials and equipment as provided in Article 4.14.4 of the General Conditions. 12790989.5 - 25 -
Storage of Materials and Equipment. The Contractor shall store materials and equipment so as to assure the preservation of their quality and fitness for the work. The Contractor may use approved portions of the project limits for storage purposes and for placing its plant and equipment, but any additional space required therefor must be provided by the Contractor at its own expense. The arrangement of storage facilities shall be orderly and convenient and shall not obstruct movement on the site, the work of others or the construction operations. The Contractor shall not use private property for storage purposes without the written permission of the property’s owner or lessee, and the Contractor shall make that documentation available to the Contract Administrator and Inspector upon his or her request. The Contractor shall restore all storage sites to their original condition at its own expense. This shall not apply to the stripping and storing of topsoil or to other materials salvaged from the work. The Contractor shall provide adequate weather protection for any such material so stored. The Contractor shall safely store all flammable, toxic or explosive materials in conformance with the applicable safety requirements of State and federal regulations, the safety standards of the National Fire Protection Association, and any directive of the State Fire Xxxxxxxx. SILENCE OF SPECIFICATIONS The apparent silence of these Specifications and Technical Specifications as to any detail, or the apparent omission from them of a detailed description concerning any point, shall be regarded as meaning that the Contractor shall only use material and workmanship of acceptable quality.
Storage of Materials and Equipment. The Construction Manager shall accept receipt of materials and equipment purchased by the Owner, provide storage and protection for materials and equipment until turned over to the separate contractors for installation.
Storage of Materials and Equipment. 50.1 The Service Provider must only store on the Site, plant and materials required for the Services.
50.2 The Service Provider must not, without the prior approval of the Contract Manager, store any dangerous materials, explosives, corrosive or inflammable substances on the Site.
50.3 The Service Provider must provide the Contract Manager with a list of all substances referred to in clause 50.2, brought onto the Site by the Service Provider, together with the respective material safety data sheets.
50.4 The Service Provider assumes full risk for any goods, articles, tools, equipment or any property, belonging to the Service Provider or its employees, left on Site for safe-keeping.
Storage of Materials and Equipment. 7.1 Limited storage space for materials and equipment will be available near project site.
7.2 Storage areas shall be subject to approval of Owner.
7.3 Store materials and equipment in manner which will preserve their quality and fitness.
Storage of Materials and Equipment. Agency and Contractor shall not store their materials or equipment on CSXT’s property or where they may potentially interfere with CSXT’s operations, unless Agency or Contractor has received CSXT Representative’s prior written permission. Agency and Contractor understand and agree that CSXT will not be liable for any damage to such materials and equipment from any cause and that CSXT may move, or require Agency or Contractor to move, such material and equipment at Agency’s or Contractor’s sole expense. To minimize the possibility of damage to the railroad tracks resulting from the unauthorized use of equipment, all grading or other construction equipment that is left parked near the tracks unattended by watchmen shall be immobilized to the extent feasible so that it cannot be moved by unauthorized persons.