Temporary Upgrade An employee in a temporary upgrade status shall have no right to grieve or arbitrate release from such temporary upgrade status.
Temporary Disconnection Temporary disconnection shall continue only for so long as reasonably necessary under Good Utility Practice.
Temporary Facilities a. The Contractor shall obtain permits for, install and maintain in safe condition all scaffolds, hoisting equipment, barricades, walkways, or other temporary structures that may be required to accomplish the work. Such structures shall be adequate for the intended use and capable of safely accepting all loads that may be imposed upon them. They shall be installed and maintained in accordance with all applicable codes and regulations.
Temporary Work 17.01 (a) Employees shall perform any temporary work which the Management directs with the understanding that when an employee is assigned to a job with a lesser rate of pay, he shall receive his regular rate of pay.
Temporary Services The steamfitters shall not do any other work and shall not be permitted to work more than one shift in a twenty- four hour day. When steamfitters are present during the regular working day, no temporary services steamfitter will be required. Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $41.80 Supplemental Benefit Rate per Hour: $42.76 Overtime Double time the regular rate after an 8 hour day. Double time the regular time rate for Saturday. Double time the regular rate for Sunday.
Temporary Roads As necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Purchaser shall employ such measures as out- sloping, drainage dips, and water-spreading ditches. After a Temporary Road has served Purchaser’s pur- pose, Purchaser shall give notice to Forest Service and shall remove bridges and culverts, eliminate ditches, out- slope roadbed, remove ruts and berms, effectively block the road to normal vehicular traffic where feasible under existing terrain conditions, and build cross ditches and water bars, as staked or otherwise marked on the ground by Forest Service. When bridges and culverts are re- moved, associated fills shall also be removed to the ex- tent necessary to permit normal maximum flow of water.
Temporary Safeguard Measures 1. A Contracting Party may adopt or maintain measures not conforming with its obligations under Article 2 relating to cross- border capital transactions and Article 15: