Travel Demand Model Development Sample Clauses

Travel Demand Model Development. Xxxxxx-Xxxx will review the Southern California Associations of Governments Regional Travel Demand Model (SCAG RTDM) to determine the feasibility of establishing VMT baselines. If required, we will enhance the sub-area of the SCAG model representing the City of Westlake Village with additional network, traffic analysis zone (TAZ) splits, and land use information (anticipated to be updated to reflect buildout of the General Plan) as provided by the City to generate segment level volumes. We will conduct new 24-hour counts at eight locations and perform limited model validation tests for baseline (existing) conditions to establish that the model is accurate. Deliverables • Subarea City of Westlake Village TDM Base Year • Subarea City of Westlake Village TDM Future Year • Limited Validation Statistics Summary Memorandum • Baseline and Future Segment Raw Volumes
AutoNDA by SimpleDocs
Travel Demand Model Development. The Engineer shall meet with the MPO and the State to assess model development needs. The result of this meeting will be a model development plan for MPO and the State’s approval.
Travel Demand Model Development. The most recent version of SERPM 7 will be used for traffic demand modeling. The Consultant shall perform a subarea validation of the base year model to verify the model reasonably reflects traffic volumes and travel patterns in the area. The subarea must include all roadways that are anticipated to be impacted by the lane elimination and diversion. The Consultant shall review traffic modeling assumptions and inputs. Appropriate subarea modifications to socio-economic data and highway and transit network parameters (area type, facility type, speed, capacity, centroid connectors, turn penalties, routes, stops, headway, mode, operator, etc.) will be performed. The validation will be performed in accordance with the Project Traffic Forecasting Handbook. Moreover, the results of the subarea validation will be compared against the validation thresholds documented in the Project Traffic Forecasting Handbook. All modifications to the zonal data, network structure, and model parameters will be documented and carried forward to 2040 future year models. The Consultant will review and update the 2040 horizon year Cost Feasible SERPM networks to verify that all new committed or planned projects (that impact surrounding travel patterns) are reflected in the modeling analysis. All changes to the model will be documented. The Build model will be developed by incorporating the Build alternative improvements into the No Build model. The model assignments will be reviewed for reasonableness and checked against counts and future land use changes.

Related to Travel Demand Model Development

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Program Development NWESD agrees that priority in the development of new applications services by XXXXX shall be in accordance with the expressed direction of the XXXXX Board of Directors operating under their bylaws.

  • Program Budget A) Contractor will expend funds received for operation of its program and services according to Contractor’s annual operating budget. The portions of said budget, which reflect services performed or money paid to Contractor pursuant to this Agreement shall be subject to the approval of the Human Services Agency. B) In the event Contractor determines a reasonable business necessity to transfer funding between personnel and operating expenses specified in the budget submitted to the Human Services Agency the following will apply: 1. Contractor will notify the Human Services Agency of transfers that in the aggregate are between ten percent (10%) and twenty percent (20%) of the maximum contract amount. 2. Contractor will further notify the Human Services Agency of transfers that in the aggregate equal or exceed twenty percent (20%) of the maximum contract amount. In the event the Director of the Human Services Agency or her designee determines said transfer of twenty percent (20%) or more is inconsistent with the goals and objectives of the County Alcohol and Drug Services, she may require a re-negotiation of the Agreement.

  • Additional Information for Product Development Projects Outcome of product development efforts, such copyrights and license agreements. • Units sold or projected to be sold in California and outside of California. • Total annual sales or projected annual sales (in dollars) of products developed under the Agreement. • Investment dollars/follow-on private funding as a result of Energy Commission funding. • Patent numbers and applications, along with dates and brief descriptions.  Additional Information for Product Demonstrations: • Outcome of demonstrations and status of technology. • Number of similar installations. • Jobs created/retained as a result of the Agreement.

  • Business Plan The Lenders shall have received a satisfactory detailed business plan of the Borrowers for fiscal years 1996 - 2002 and a satisfactory written analysis of the business and prospects of the Borrowers for the period from the Closing Date through the final maturity of the Term Loans.

  • Development Plans 4.3.1 For each Licensed Indication and corresponding Licensed Product in the Field, Licensee will prepare and deliver to Licensor a development plan and budget (each a “Development Plan”). The initial Development Plans for each Licensed Indication will be delivered within […***…] after the Grant Date for such Licensed Indication.

  • Annual Work Plan and Budget 1. The Recipient shall, not later than November 30th of each year, prepare and furnish to the Association an annual work plan and budget (“Annual Work Plan and Budget”) for the Project for the subsequent year, said Annual Work Plan and Budget of such scope and detail as the Association shall have reasonably requested.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Marketing Plan The MCP shall submit an annual marketing plan to ODM that includes all planned activities for promoting membership in or increasing awareness of the MCP. The marketing plan submission shall include an attestation by the MCP that the plan is accurate is not intended to mislead, confuse or defraud the eligible individuals or ODM.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

Time is Money Join Law Insider Premium to draft better contracts faster.