Water pump Sample Clauses

Water pump. The size and capacity of the water pump must be sufficient to provide a discharge of not less than twenty (20) gallons per minute when pumping through fifty
AutoNDA by SimpleDocs
Water pump. A detailed listings of the fixtures is given in annex 1 hereof and is considered part of the Contract.
Water pump. 2.1.6.1 Constant displacement tubular-type pump driven by an in-line hydraulic motor delivers 2.1.6.2 Hydraulic controls are mounted at the operator’s station
Water pump. 6-10 WHEELS/TIRES ..............................................................
Water pump. Class 1, Class 5, Class 7 vehicles will not have a water pump if a water tank is not required. − A water pump will be installed in the superstructure pump location, conforming to the ISO EN norm and having EN 1028-1 + A1 and CE certificates, which will be driven by PTO, with normal and high pressure stages. If the power of the PTO is insufficient, it will be driven by intermediate gearbox. The PTO chassis to be used will be a product deemed appropriate by the manufacturer and this issue will be documented during the inspection phase. Bidding companies will submit the manufacturer company’s catalogs or brochures containing technical values related to PTO at the bidding stage. − Pump's fans, diffuser and body will be made of seawater resistant alloy material, and the pump shaft will be made of stainless steel. Water tightness of the pump will be provided. − Water pump will have an automatic self-suction with at least 1 low and 1 high pressure stage. − The low-pressure stage will have a geographic suction depth of 3 meters and at least 3000 liters/minute in normal weather conditions at minimum 10 bar pressure, and the high pressure stage will have a water treatment capacity of at least 250 liters / minute at 35 to 40 bar pressure under the same suction and weather conditions. Water pump manufacturer’s catalogs or brochures containing technical values shall be provided. − Cancelling of the high-pressure water connection of the high-pressure part of the pump should be possible when not needed. Water pump will be equipped with: − 1 water inlet with 4 "diameter union and cover − There will be 4 normal pressure couplings (water outlets), 2 of which will be 2” type and 2 of them will be 2.5” storz type. − There will be at least one 1” type high pressure water outlet. − There will be a foam mixing system on the pump that can suck from external sources, which shall be equipped with an adjustable foam proportioner at the rate of 3% to 8%. − In cold weather and when the vehicle is moving, the hot water in the engine cooling system will be passed through the hot water pocket on the pump by means of a suitable installation and system, and returned to the engine cooling system to prevent freezing of the water in the pump. In order for this system to be deactivated when necessary, a suitable valve mechanism will be installed in a place that can be accessed manually. − Pump vacuum and first suction system will perform fully automatically. First suction will be provided wi...

Related to Water pump

  • Wastewater investments in the construction, material enhancement, or renewal of infrastructure that supports wastewater and storm water collection, treatment, and management systems. Note: Investments in health infrastructure (e.g., hospitals, long-term care facilities, convalescent centres, and senior centres) are not eligible. Eligible Expenditures will be limited to the following: 1. Infrastructure investments – expenditures associated with acquiring, planning, designing, constructing, or renovating a tangible capital asset and any related debt financing charges specifically identified with that asset. 2. Capacity-building costs – for projects eligible under the capacity-building category only, expenditures associated with the development and implementation of: • Capital investment plans, integrated community sustainability plans, integrated regional plans, housing needs assessments, or asset management plans; • Studies, strategies, systems, software, third-party assessments, plans, or training related to asset management; • Studies, strategies, systems, or plans related to housing or land use; • Studies, strategies, or plans related to the long-term management of infrastructure; and • Other initiatives that strengthen the Recipient’s ability to improve local and regional planning. 3. Joint communications and signage costs – expenditures directly associated with joint federal communication activities and with federal project signage.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following: A. Company is required to submit a Notice of Intent to use the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity. Authority and Company both acknowledge that close cooperation is necessary to ensure compliance with any stormwater discharge permit terms and conditions, as well as to ensure safety and to minimize the cost of compliance. Company acknowledges further that it may be necessary to undertake actions to minimize the exposure of stormwater to “significant materials” (as such term may be defined by applicable stormwater rules and regulations) generated, stored, handled, or otherwise used by Company by implementing and maintaining “best management practices” (BMPs) (as such term may be defined in applicable stormwater rules and regulations). Company will establish a BMP plan for the Premises and submit a copy to Authority. B. Company will be knowledgeable of any stormwater discharge permit requirements applicable to Company and with which Company will be obligated to comply. The submittal of a Notice of Intent will be made by Company to the FDEP, and a copy will be submitted to Authority. Company is required to comply with the following requirements including, but not limited to, certification of non-stormwater discharges; collection of stormwater samples; preparation of a Stormwater Pollution Prevention Plan or similar plans; implementation of BMPs; and maintenance and submittal of necessary records. In complying with such requirements, Company will observe applicable deadlines set by the regulatory agency that has jurisdiction over the permit. Company agrees to undertake, at its sole expense, those stormwater permit requirements for which it has received written notice from the regulatory agency and that apply to the Premises, and Company agrees that it will hold harmless and indemnify Authority for any violations or non-compliance with any such permit requirements.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • WATERBEDS The Tenant: (check one)

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!