Acceptance Testing Plan definition

Acceptance Testing Plan for the Solution and Services shall be prepared by Contractor and submitted to State prior to execution of this Agreement, which agreement, as approved by State shall be incorporated into this Agreement. The Acceptance Testing Plan shall be based on full implementation of the Solution and Services and shall include testing procedures sufficient to demonstrate that (a) all functionality has been provided and performs in the applicable State Entity’s environment, in all material respects, in accordance with the Guaranteed Functionality; (b) the applications and deliverables meet the warranty requirements specified in this Agreement and the applicable Solution Order; (c) the applications and Deliverables will perform at acceptable levels required to support State’s implementation of the SVS and the operation of general and primary elections using such SVS; and (d) the applications and Deliverables will successfully complete an “election voting and processing” simulation. Testing procedures will include testing before, at, and after “go-live” as appropriate before the Solution “goes-live”, but the testing will continue after “go-live” as appropriate to verify that the applications and services meet applicable requirements in a full production mode. State representatives will have the right to be present during the Acceptance Test and review all test results. When the applications and Deliverables meet the requirements of the Acceptance Test, State will provide a written sign-off that Acceptance has occurred. If the applications and Deliverables fail to meet all material requirements of the Acceptance Test, Contractor will, at its sole expense, correct the deficiencies and the Acceptance Test will then be repeated. Acceptance will not relieve Contractor of responsibility for its warranties, support and maintenance obligations, or achieving the Performance Levels.
Acceptance Testing Plan means the plan of that name developed by the Contractor based on the principles set out at Schedule 7.
Acceptance Testing Plan means the plan set out in a detailed transition plan and, as of the Effective Date, the acceptance test plan supporting the Acceptance Criteria set forth in Schedule D-3.

Examples of Acceptance Testing Plan in a sentence

  • The Contractor shall prepare and submit a Construction, Procurement, and Acceptance Testing Plan for DOE approval (Table C.5-1.1, Deliverable 4.1) and update the Plan as required after initial submission.

  • GCC 19.1 Chapters in the Project Plan shall address the following subject: [ for example, specify: (a) Project Organization and Management Plan; (b) Delivery and Installation Plan (c) Training Plan (d) Pre-commissioning and Operational Acceptance Testing Plan (e) Warranty Service Plan (f) Task, Time, and Resource Schedules (g) Post-Warranty Service Plan (if applicable) (h) Technical Support Plan (if applicable) (i) etc.

  • In accordance with the Installation Plan and the requirements for the Acceptance Testing Plan, all Equipment shall be inspected as follows: (i) following arrival of the initial deliveries at the central warehouse designated by State and (ii) for the same deliveries, when forwarded to the State Site (or any subsequent delivery made directly to the State Site(s)).

  • Vendor agrees to support MSFA’s User Acceptance Testing (UAT) to prove that the proposed solution fully meets the requirements of this RFP/Attachment A.So that MSFA can assess Vendor’s ability to conduct UAT, Vendor must submit with his proposal a preliminary User Acceptance Testing Plan.

  • The Contractor shall provide Acceptance Testing Plan (ATP) and Checklist within 30 calendar days of contract execution.

  • As a part of this proposal, each Vendor must provide their Acceptance Testing Plan, which details their testing methodology during acceptance testing and detail what criteria they generally have used in the past to signify acceptance at other installations similar to the WSDOT’s proposed system.

  • The average background is 0.0050 ± 0.0018 F14C, which is a little higher than the AixMICADAS performance (0.0028 ± 0.0018 F14C), but lower than the all the other published data shown in Table 1.

  • For greater certainty, the City is not bound or obligated to perform the Acceptance Testing as defined in the Acceptance Testing Plan, but may perform other verification and testing that it deems reasonable and necessary to verify and assess the applicable Deliverable.

  • TCS shall provide all cooperation and assistance reasonably required or requested by Xxxxxxx in connection with Xxxxxxx’x evaluation or testing of the Deliverables provided in the Transition Acceptance Testing Plan.

  • Contractor shall provide a written Acceptance Testing Plan for State approval within 90 days of contract award.

Related to Acceptance Testing Plan

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Test Plan means a plan for the Testing of the or Deliverables and other agreed criteria related to the achievement of Milestones as described further in paragraph 4 of Call Off Schedule 4;

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Training Plan means the plan that outlines what training and assessment will be conducted off-the-job and what will be conducted on-the-job and how the Registered Training Organisation will assist in ensuring the integrity of both aspects of the training and assessment process.

  • Work Plan means a plan that describes each individual activity to be conducted to complete eligible activities and the associated costs of each individual activity.

  • Program Plan means the tobacco settlement program plan dated February 14, 2001, including exhibits to the program plan, submitted by the authority to the legislative council and the executive council, to provide the state with a secure and stable source of funding for the purposes designated by section 12E.3A and other provisions of this chapter.

  • Utilization review plan or "plan" means a written procedure for performing review.

  • Application Review Start Date means the later date of either the date on which the District issues its written notice that the Applicant has submitted a completed Application or the date on which the Comptroller issues its written notice that the Applicant has submitted a completed Application and as further identified in Section 2.3.A of this Agreement.

  • Project Plan means the document to be developed by the Contractor and approved by WTL, based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalised Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by WTL. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • service delivery and budget implementation plan means a detailed plan approved by the mayor of a municipality in terms of section 53(1) (c) (ii) for implementing the municipality’s delivery of municipal services and its annual budget.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • Annual Work Plan means each work plan approved by the Association under Section I.C of Schedule 2 to this Agreement for inclusion in the Project.

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • Master subcontracting plan means a subcontracting plan that contains all the required elements of an individual subcontracting plan, except goals, and may be incorporated into individual subcontracting plans, provided the master subcontracting plan has been approved.

  • Scope of Work means the description of Services and Deliverables specified in the Contract and as may be amended.

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.