Construction Phase Plan means a plan drawn up under regulations 12 or 15;
Construction Phase Plan means a document recording the health and safety arrangements, site rules and any special measures for construction work;
More Definitions of Construction Phase Plan
Construction Phase Plan delete the words “regulation 23” and replace with “regulation 4(5)”. Consultant Team: the Architect, contract administrator, quantity surveyor, CDM coordinator/principal designer, mechanical and electrical engineer and structural engineer together with any other consultants engaged by the Employer in relation to the Works and notified to the Contractor from time to time.
Construction Phase Plan means the construction phase plan prepared by the Principal Contractor as required by the CDM Regulations, including all updates and revisions made or required by the CDM Regulations.
Construction Phase Plan means the plan referred to in regulation 2 of the CDM Regulations, including any updates and revisions.
Construction Phase Plan has the meaning prescribed in the CDM Regulations Contract means any contract between the Customer and its Contractor Contractor means any person to whom a Contract for the whole or any part of the design and/or construction of the Works is let and for whom the Customer is the employer Control Period means the period following an XXX access charges review over which the financial framework determined by XXX at such access charges review as being required by Network Rail to operate, maintain, renew and enhance its infrastructure is to be implemented CSM-REA Regulations means the Commission Implementing Regulation (EU) No 402/2013 of 30 April 2013 on the common safety method for risk evaluation and assessment and repealing Regulation (EC) No 352/2009 (as amended) Customer Cap means an amount equal to 10% of the Estimated Works Cost as at the Commencement Date as varied from time to time in accordance with clause 12.7(d) to (f)2 Daily Liquidated Damages Sum means the amount stated in paragraph 10 of Schedule 3 Defects Identification and Completion shall occur on the Defects Identification and Completion Date Defects Identification and Completion Certificate means the certificate referred to in Standard NR/L2/MTC/089 and recorded in form NR/L2/MTC/089/AMP016 Defects Identification and Completion Date means the date on which Network Rail countersigns the Defects Identification and Completion Certificate in accordance with clause 10.8 2 The cap should be a percentage of the cost of the Works which impacts on the infrastructure save where this is inappropriate.
Construction Phase Plan means a document recording the health and
Construction Phase Plan means a document recording the health and safety arrangements, site rules and special measures for construction work which, where applicable, includes specific measures concerning work which falls within one or more of the following categories;
Construction Phase Plan means the plan prepared by the Contractor in its capacity as Principal Contractor under the CDM Regulations prior to the commencement of the Commission, and refined and revised by him during the execution of the Commission in accordance with regulation 12 of the CDM Regulations; Date of Possession means the date(s) specified in the Order for the start of the whole Commission, or (where the Commission is divided into Sections) for each Section, on site, subject to such deferment as may be made in accordance with Condition 2.9 by the Supervising Officer; Defect means any defects, shrinkages or other faults in the Commission appearing within the Defects Correction Period due to material or workmanship not in accordance with the Order;